Heavy Equipment Operator prevailing wage rates in District of Columbia
Federal Davis-Bacon rates published in 1 active determination, 2026
- Active federal Davis-Bacon determinations for District of Columbia publish 18 heavy equipment operator classification rates, across 1 determination covering 1 county.
- Those published base rates run from $25.14 to $47.18 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Heavy, Highway.
- Last determination revision affecting heavy equipment operator rates in District of Columbia: .
This page collects every classification in District of Columbia's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
DC20260001 rev 6 · Heavy, Highway · Washington, D.C.
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 - TOWER CRANES AND CRANES 100 TON AND OVER. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPEN | $45.76 | 13.27 | ENGI0077-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 - 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000 LBS TORQUE), MOLE, MECHANIC. (PAID HOL | $43.44 | 13.27 | ENGI0077-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 - CRANES, HOISTS, DRILL RIGS (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH P | $40.73 | 13.27 | ENGI0077-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 - FRONT END LOADERS, BOOM TRUCKS, BACKHOES, EXCAVATORS, GRADALLS, POWER DRIVEN WHEEL SCOOPS & SCRAPERS, BLADE GRA | $36.31 | 13.27 | ENGI0077-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 - BOILERS (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREA | $31.09 | 13.27 | ENGI0077-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 - FORK LIFTS, DITCH WITCH, BOBCAT, SKID STEER, SPACE HEATERS, SWEEPERS, ASSISTANT ENGINEERS, OILERS, SERVICE UNIT | $28.39 | 13.27 | ENGI0077-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 - MASTER MECHANIC. (PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MAR | $47.18 | 13.27 | ENGI0077-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 1 - GRADALL OPERATOR, CRANE | $37.07 | 11.17 | ENGI0077-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 2 - BOOM TRUCK, MILLING MACHINE, EXCAVATOR, RUBBER TIRE BACKHOE, ASPHALT PAVER, ASPHALT PLANT ENGINEER, MOTOR GRADER | $32.89 | 11.17 | ENGI0077-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 3 - BROOM TRUCK, ASPHALT ROLLER | $28.09 | 11.17 | ENGI0077-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 4 - AIR COMPRESSOR, GRADE ROLLERS | $25.14 | 11.17 | ENGI0077-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, PAVING AND INCIDENTAL GRADING: GROUP 5 - MECHANIC | $37.93 | 10.97 | ENGI0077-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1 - CRANES 50 TON AND ABOVE. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL | $41.40 | 11.55 | ENGI0077-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2 - CRANES UNDER 50 TON CAPACITY, BOOM TRUCKS. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S | $35.00 | 11.55 | ENGI0077-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3 - GRADALL, LEAD MECHANIC. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTON'S BIRTHDAY, MEMORIAL | $33.80 | 11.55 | ENGI0077-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4 - EXCAVATORS, BACKHOES, FRONT-END LOADERS, FORK LIFT/LULL, BULLDOZERS, MOTOR GRADERS, MECHANIC 1, HYDRAUL | $33.26 | 11.55 | ENGI0077-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5 - KNUCKLE BOOM, TRENCHING MACHINE, WELL DRILLING MACHINES, CONCRETE MIXERS, ASSISTANT MECHANIC, MINI EXCA | $31.16 | 11.55 | ENGI0077-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6 - OILER, DUMP TRUCK, SKID STEER/BOBCAT, ROLLERS. (PAID HOLIDAYS: NEW YEAR'S DAY, INAUGURAL DAY, WASHINGTO | $25.89 | 11.55 | ENGI0077-003 collectively bargained (union) rate |
Official document: DC20260001 on SAM.gov.
Where to go next
Heavy Equipment Operator rates in every state · District of Columbia prevailing wage and state law · District of Columbia determinations by county · pay calculator
Other trades in District of Columbia
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Painter · Insulator (Heat & Frost) · Line Constructor / Lineman