Construction Laborer prevailing wage rates in Nevada
Federal Davis-Bacon rates published in 58 active determinations, 2026
- Active federal Davis-Bacon determinations for Nevada publish 690 construction laborer classification rates, across 58 determinations covering 17 counties.
- Those published base rates run from $8.24 to $60.15 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting construction laborer rates in Nevada: .
This page collects every classification in Nevada's active federal determinations that is a form of construction laborer work (general and specialty construction labor) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
NV20260001 rev 2 · Building, Heavy, Highway · Clark, Lincoln, Nye
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER GROUP 4: JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER, ROCK SLINGER, LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE, GAS AND OIL PIPEL | $47.79 | 29.35 | LABO0872-008 collectively bargained (union) rate |
| LABORER GROUP 3: ASBESTOS ABATEMENT, CHUCKTENDER (EXCEPT TUNNELS), GAS & OIL PIPELINE WRAPPER-POT TENDER AND FORM MAN, OPERATOR OF CEMENT GRINDING MACHINE, ROTO-SCRAPER, SANDBLASTE | $47.55 | 29.35 | LABO0872-008 collectively bargained (union) rate |
| LABORER GROUP 2: LABORER - GENERAL (CONSTRUCTION CLEANUP, ETC.), DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT (JOBSITE ONLY), GAS & | $47.34 | 29.35 | LABO0872-008 collectively bargained (union) rate |
Official document: NV20260001 on SAM.gov.
NV20260002 rev 3 · Building, Heavy, Highway · Clark, Lincoln, Nye
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER GROUP 2 ASPHALT RAKER, IRONER, SPREADER; BUGGYMOBILE MAN; CEMENT DUMPER; CONCRETE CORE CUTTER, SAWMAN AND CEMENT GRINDING OPERATOR; CONCRETE CURER; CRIBBER OR SHORER; CUTTI | $41.39 | 27.22 | LABO0872-009 collectively bargained (union) rate |
| LABORER GROUP 1 BUILDING/OFFICE CLEANUP: CESSPOOL DIGGER & INSTALLER; DRINKING WATER; FENCE BUILDER; FINE GRADER, HIGHWAY & STREET; FLAGPERSON; GAS & OIL PIPELINE LABORER; GAS & OI | $41.13 | 27.22 | LABO0872-009 collectively bargained (union) rate |
Official document: NV20260002 on SAM.gov.
NV20260041 rev 2 · Residential · Carson City
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER ((4) PIPELAYER) | $34.45 | 16.30 | LABO0169-001 collectively bargained (union) rate |
| LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $34.20 | 16.30 | LABO0169-001 collectively bargained (union) rate |
| LABORER ((1) COMMON OR GENERAL) | $33.95 | 16.30 | LABO0169-001 collectively bargained (union) rate |
Official document: NV20260041 on SAM.gov.
NV20260042 rev 2 · Residential · Clark
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER ((4) PIPELAYER) | $30.55 | 15.02 | LABO0169-002 collectively bargained (union) rate |
| LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $30.30 | 15.02 | LABO0169-002 collectively bargained (union) rate |
| LABORER: COMMON OR GENERAL | $15.65 | 0.00 | SUNV2014-028 DOL wage survey rate |
Official document: NV20260042 on SAM.gov.
NV20260043 rev 2 · Residential · Storey
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER ((4) PIPELAYER) | $34.45 | 16.30 | LABO0169-001 collectively bargained (union) rate |
| LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $34.20 | 16.30 | LABO0169-001 collectively bargained (union) rate |
| LABORER ((1) COMMON OR GENERAL) | $33.95 | 16.30 | LABO0169-001 collectively bargained (union) rate |
Official document: NV20260043 on SAM.gov.
NV20260044 rev 2 · Residential · Washoe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER ((4) PIPELAYER) | $34.45 | 16.30 | LABO0169-001 collectively bargained (union) rate |
| LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $34.20 | 16.30 | LABO0169-001 collectively bargained (union) rate |
| LABORER ((1) COMMON OR GENERAL) | $33.95 | 16.30 | LABO0169-001 collectively bargained (union) rate |
Official document: NV20260044 on SAM.gov.
NV20260045 rev 1 · Residential · Churchill, Douglas, Elko, Esmeralda, Eureka, Humboldt and 7 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LABORER: PIPELAYER | $8.91 | 0.00 | SUNV1992-003 DOL wage survey rate |
| LABORER (GENERAL) | $8.24 | 0.00 | SUNV1992-003 DOL wage survey rate |
| LABORER (CONCRETE WORKER) | $11.67 | 0.00 | SUNV1992-003 DOL wage survey rate |
Official document: NV20260045 on SAM.gov.
NV20260060 rev 1 · Heavy · Churchill
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260060 on SAM.gov.
NV20260061 rev 1 · Heavy · Elko
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260061 on SAM.gov.
NV20260062 rev 1 · Heavy · Eureka
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260062 on SAM.gov.
NV20260063 rev 1 · Heavy · Humboldt
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260063 on SAM.gov.
NV20260064 rev 1 · Heavy · Lander
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260064 on SAM.gov.
NV20260065 rev 2 · Heavy · Lincoln
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and | $41.03 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and v | $39.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tend | $41.24 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickl | $42.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and bla | $41.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with | $41.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6D (Miner-Welder) | $54.05 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6F High Scaler | $60.15 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above grou | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall | $42.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260065 on SAM.gov.
NV20260066 rev 1 · Heavy · Pershing
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260066 on SAM.gov.
NV20260067 rev 1 · Heavy · White Pine
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260067 on SAM.gov.
NV20260068 rev 1 · Heavy · Douglas
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260068 on SAM.gov.
NV20260069 rev 1 · Heavy · Lyon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260069 on SAM.gov.
NV20260070 rev 1 · Heavy · Carson City
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260070 on SAM.gov.
NV20260071 rev 2 · Heavy · Clark
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and | $41.03 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture; Polishing stainless steel in hotel kitchens; Sweeping and v | $39.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tend | $41.24 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickl | $42.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and bla | $41.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with | $41.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6D (Miner-Welder) | $54.05 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6F High Scaler | $60.15 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; Employees shall be properl | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher: Plaster Tending shall | $42.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260071 on SAM.gov.
NV20260072 rev 1 · Heavy · Storey
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260072 on SAM.gov.
NV20260073 rev 1 · Heavy · Washoe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, and building including windows and tile; Dumpmen or Spotter (other than asphalt); Handling and Servicing of Flares, Watchmen | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chainsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hand trowels or hand floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model T\/\/M-2A, Gardner Denver Model DN143 and similar type drills (in accordance with Memorand | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all powder and explosives of any type, regardless of method used | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking and Highway Striping work includes but is not limited to: All work by any method preformed in connection | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260073 on SAM.gov.
NV20260074 rev 2 · Heavy · Nye
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and | $41.03 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and v | $39.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tend | $41.24 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickl | $42.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and bla | $41.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with | $41.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6D (Miner-Welder) | $54.05 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6F High Scaler | $60.15 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above grou | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall | $42.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260074 on SAM.gov.
NV20260075 rev 1 · Heavy · Esmeralda
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and | $41.03 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and v | $39.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tend | $41.24 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickl | $42.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and bla | $41.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with | $41.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6D (Miner-Welder) | $54.05 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6F High Scaler | $60.15 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above grou | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall | $42.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260075 on SAM.gov.
NV20260076 rev 1 · Heavy · Mineral
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260076 on SAM.gov.
NV20260077 rev 1 · Building · Churchill
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260077 on SAM.gov.
NV20260078 rev 1 · Building · Douglas
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260078 on SAM.gov.
NV20260079 rev 1 · Building · Humboldt
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260079 on SAM.gov.
NV20260080 rev 2 · Building · Lincoln
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and | $41.03 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and v | $39.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tend | $41.24 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickl | $42.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and bla | $41.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with | $41.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6D (Miner-Welder) | $54.05 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6F High Scaler | $60.15 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above grou | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall | $42.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260080 on SAM.gov.
NV20260081 rev 1 · Building · Lyon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260081 on SAM.gov.
NV20260082 rev 2 · Building · Nye
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and | $41.03 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and v | $39.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tend | $41.24 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickl | $42.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and bla | $41.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with | $41.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6D (Miner-Welder) | $54.05 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6F High Scaler | $60.15 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above grou | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall | $42.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260082 on SAM.gov.
NV20260083 rev 1 · Building · Elko
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260083 on SAM.gov.
NV20260084 rev 1 · Building · Eureka
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260084 on SAM.gov.
NV20260085 rev 1 · Building · Esmeralda
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and | $41.03 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and v | $39.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tend | $41.24 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickl | $42.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and bla | $41.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with | $41.53 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6D (Miner-Welder) | $54.05 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 6F High Scaler | $60.15 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above grou | $41.34 | 34.24 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall | $42.43 | 34.24 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260085 on SAM.gov.
NV20260086 rev 1 · Building · Lander
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260086 on SAM.gov.
NV20260087 rev 1 · Building · Mineral
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Furniture Mover | $31.79 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; | $35.45 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 1-A (Flagger) | $33.58 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in G | $35.55 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; | $35.70 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edg | $39.13 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum | $35.95 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used f | $36.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method p | $38.20 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: Landscape | $30.29 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260087 on SAM.gov.
NV20260088 rev 1 · Building · Pershing
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| Laborers: (Group 6) Gunmen, Materialmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | 17.58 | SANV2025-001 collectively bargained (union) rate |
| Laborers: (Group 6) Reboundmen | $35.60 | 17.58 | SANV2025-001 collectively bargained (union) rate |
Official document: NV20260088 on SAM.gov.
Showing the first 400 of 690 published construction laborer rates. The rest are on the individual determination pages linked above, each of which carries the full official text.
Where to go next
Construction Laborer rates in every state · Nevada prevailing wage and state law · Nevada determinations by county · pay calculator
Other trades in Nevada
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Plasterer · Glazier · Millwright · Boilermaker · Elevator Constructor · Sprinkler Fitter · Piledriver · Tile Setter