Line Constructor / Lineman prevailing wage rates in Ohio
Federal Davis-Bacon rates published in 1 active determination, 2026
- Active federal Davis-Bacon determinations for Ohio publish 10 line constructor / lineman classification rates, across 1 determination covering 88 counties.
- Those published base rates run from $29.07 to $54.96 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Heavy, Highway.
- Last determination revision affecting line constructor / lineman rates in Ohio: .
This page collects every classification in Ohio's active federal determinations that is a form of line constructor / lineman work (overhead and underground electrical distribution lines) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
OH20260001 rev 4 · Heavy, Highway · Adams, Allen, Ashland, Ashtabula, Athens, Auglaize and 82 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: LINEMEN/CABLE SPLICER: MUNICIPAL POWER/TRANSIT PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $54.96 | 23.09 | ELEC0071-005 collectively bargained (union) rate |
| LINE CONSTRUCTION: LINEMEN/CABLE SPLICER: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $43.89 | 19.85 | ELEC0071-005 collectively bargained (union) rate |
| LINE CONSTRUCTION: GROUNDMAN: MUNICIPAL POWER/TRANSIT PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $38.47 | 18.64 | ELEC0071-005 collectively bargained (union) rate |
| LINE CONSTRUCTION: GROUNDMAN: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $31.10 | 16.40 | ELEC0071-005 collectively bargained (union) rate |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR: MUNICIPAL POWER/TRANSIT PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $49.46 | 21.60 | ELEC0071-005 collectively bargained (union) rate |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $39.97 | 18.79 | ELEC0071-005 collectively bargained (union) rate |
| LINE CONSTRUCTION: LINEMAN & CABLE SPLICERS (STATEWIDE) | $46.02 | 19.04 | ELEC0071-010 collectively bargained (union) rate |
| LINE CONSTRUCTION: GROUNDMAN (STATEWIDE) | $29.07 | 14.97 | ELEC0071-010 collectively bargained (union) rate |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR (STATEWIDE) | $40.44 | 17.71 | ELEC0071-010 collectively bargained (union) rate |
| LINE CONSTRUCTION: TRAFFIC SIGNAL & LIGHTING TECHNICIAN (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES) FO | $42.18 | 19.91 | ELEC0245-003 collectively bargained (union) rate |
Official document: OH20260001 on SAM.gov.
Where to go next
Line Constructor / Lineman rates in every state · Ohio prevailing wage and state law · Ohio determinations by county · pay calculator
Other trades in Ohio
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Drywall Hanger · Plasterer · Glazier · Insulator (Heat & Frost) · Elevator Constructor · Sprinkler Fitter · Piledriver · Tile Setter · Tile Finisher · Floor Layer