Tile Finisher prevailing wage rates in Ohio
Federal Davis-Bacon rates published in 64 active determinations, 2026
- Active federal Davis-Bacon determinations for Ohio publish 82 tile finisher classification rates, across 64 determinations covering 74 counties.
- Those published base rates run from $22.31 to $32.80 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building.
- Last determination revision affecting tile finisher rates in Ohio: .
This page collects every classification in Ohio's active federal determinations that is a form of tile finisher work (grouting and finishing behind the tile setter) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
OH20260030 rev 1 · Building · Adams
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.87 | 16.31 | BROH0046-004 collectively bargained (union) rate |
Official document: OH20260030 on SAM.gov.
OH20260031 rev 1 · Building · Ashland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.25 | 23.93 | BROH0040-001 collectively bargained (union) rate |
| TILE FINISHER | $30.25 | 23.93 | BROH0040-001 collectively bargained (union) rate |
Official document: OH20260031 on SAM.gov.
OH20260032 rev 1 · Building · Ashtabula
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $31.50 | 16.23 | BROH0046-005 collectively bargained (union) rate |
| TILE FINISHER | $31.50 | 16.23 | BROH0046-005 collectively bargained (union) rate |
Official document: OH20260032 on SAM.gov.
OH20260033 rev 1 · Building · Athens
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260033 on SAM.gov.
OH20260036 rev 1 · Building · Columbiana
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $31.50 | 16.23 | BROH0046-005 collectively bargained (union) rate |
| TILE FINISHER | $31.50 | 16.23 | BROH0046-005 collectively bargained (union) rate |
Official document: OH20260036 on SAM.gov.
OH20260037 rev 1 · Building · Crawford
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.25 | 23.93 | BROH0040-001 collectively bargained (union) rate |
| TILE FINISHER | $30.25 | 23.93 | BROH0040-001 collectively bargained (union) rate |
Official document: OH20260037 on SAM.gov.
OH20260040 rev 1 · Building · Fayette
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260040 on SAM.gov.
OH20260041 rev 1 · Building · Gallia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.87 | 16.31 | BROH0046-004 collectively bargained (union) rate |
Official document: OH20260041 on SAM.gov.
OH20260044 rev 1 · Building · Huron
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.78 | 23.04 | BROH0046-007 collectively bargained (union) rate |
| TILE FINISHER | $30.78 | 23.04 | BROH0046-007 collectively bargained (union) rate |
Official document: OH20260044 on SAM.gov.
OH20260045 rev 1 · Building · Knox
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-001 collectively bargained (union) rate |
| TILE FINISHER | $28.31 | 10.45 | BROH0055-001 collectively bargained (union) rate |
Official document: OH20260045 on SAM.gov.
OH20260047 rev 1 · Building · Meigs
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260047 on SAM.gov.
OH20260049 rev 1 · Building · Monroe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.87 | 16.31 | BROH0046-004 collectively bargained (union) rate |
Official document: OH20260049 on SAM.gov.
OH20260050 rev 1 · Building · Muskingum
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260050 on SAM.gov.
OH20260051 rev 1 · Building · Pike
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260051 on SAM.gov.
OH20260053 rev 1 · Building · Ross
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260053 on SAM.gov.
OH20260054 rev 1 · Building · Sandusky
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.78 | 23.04 | BROH0046-007 collectively bargained (union) rate |
| TILE FINISHER | $30.78 | 23.04 | BROH0046-007 collectively bargained (union) rate |
Official document: OH20260054 on SAM.gov.
OH20260055 rev 1 · Building · Scioto
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.87 | 16.31 | BROH0046-004 collectively bargained (union) rate |
Official document: OH20260055 on SAM.gov.
OH20260056 rev 1 · Building · Seneca
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.78 | 23.04 | BROH0046-007 collectively bargained (union) rate |
| TILE FINISHER | $30.78 | 23.04 | BROH0046-007 collectively bargained (union) rate |
Official document: OH20260056 on SAM.gov.
OH20260058 rev 1 · Building · Tuscarawas
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.87 | 16.31 | BROH0046-004 collectively bargained (union) rate |
Official document: OH20260058 on SAM.gov.
OH20260060 rev 1 · Building · Vinton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260060 on SAM.gov.
OH20260061 rev 1 · Building · Wayne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.25 | 23.93 | BROH0040-001 collectively bargained (union) rate |
| TILE FINISHER | $30.25 | 23.93 | BROH0040-001 collectively bargained (union) rate |
Official document: OH20260061 on SAM.gov.
OH20260063 rev 1 · Building · Wyandot
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.25 | 23.93 | BROH0040-001 collectively bargained (union) rate |
| TILE FINISHER | $30.25 | 23.93 | BROH0040-001 collectively bargained (union) rate |
Official document: OH20260063 on SAM.gov.
OH20260064 rev 1 · Building · Clinton, Highland, Hocking, Jackson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260064 on SAM.gov.
OH20260065 rev 1 · Building · Coshocton, Guernsey, Harrison, Morgan, Noble, Perry
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260065 on SAM.gov.
OH20260067 rev 1 · Building · Holmes, Marion
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.25 | 23.93 | BROH0040-001 collectively bargained (union) rate |
| TILE FINISHER | $30.25 | 23.93 | BROH0040-001 collectively bargained (union) rate |
Official document: OH20260067 on SAM.gov.
OH20260068 rev 1 · Building · Allen
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $24.87 | 10.66 | BROH0003-001 collectively bargained (union) rate |
Official document: OH20260068 on SAM.gov.
OH20260069 rev 1 · Building · Belmont
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $25.37 | 17.42 | BROH0008-007 collectively bargained (union) rate |
Official document: OH20260069 on SAM.gov.
OH20260070 rev 1 · Building · Brown
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.87 | 16.31 | BROH0018-008 collectively bargained (union) rate |
| TILE FINISHER | $27.87 | 16.31 | BROH0018-008 collectively bargained (union) rate |
Official document: OH20260070 on SAM.gov.
OH20260071 rev 1 · Building · Butler
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.87 | 16.31 | BROH0018-009 collectively bargained (union) rate |
Official document: OH20260071 on SAM.gov.
OH20260072 rev 1 · Building · Clark
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.28 | 11.05 | BROH0022-010 collectively bargained (union) rate |
Official document: OH20260072 on SAM.gov.
OH20260073 rev 1 · Building · Clermont
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.87 | 16.31 | BROH0018-008 collectively bargained (union) rate |
| TILE FINISHER | $27.87 | 16.31 | BROH0018-008 collectively bargained (union) rate |
Official document: OH20260073 on SAM.gov.
OH20260074 rev 1 · Building · Cuyahoga
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $31.50 | 16.23 | BROH0005-009 collectively bargained (union) rate |
Official document: OH20260074 on SAM.gov.
OH20260075 rev 1 · Building · Delaware
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260075 on SAM.gov.
OH20260076 rev 1 · Building · Erie
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.78 | 23.04 | BROH0046-015 collectively bargained (union) rate |
Official document: OH20260076 on SAM.gov.
OH20260077 rev 1 · Building · Fairfield
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260077 on SAM.gov.
OH20260078 rev 1 · Building · Franklin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260078 on SAM.gov.
OH20260079 rev 1 · Building · Fulton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $32.80 | 13.42 | BROH0003-006 collectively bargained (union) rate |
Official document: OH20260079 on SAM.gov.
OH20260080 rev 1 · Building · Geauga
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $31.50 | 16.23 | BROH0005-009 collectively bargained (union) rate |
Official document: OH20260080 on SAM.gov.
OH20260081 rev 1 · Building · Greene
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.28 | 11.05 | BROH0022-010 collectively bargained (union) rate |
Official document: OH20260081 on SAM.gov.
OH20260082 rev 1 · Building · Hamilton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $27.87 | 16.31 | BROH0018-008 collectively bargained (union) rate |
| TILE FINISHER | $27.87 | 16.31 | BROH0018-008 collectively bargained (union) rate |
Official document: OH20260082 on SAM.gov.
OH20260083 rev 1 · Building · Jefferson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $25.37 | 17.42 | BROH0008-007 collectively bargained (union) rate |
Official document: OH20260083 on SAM.gov.
OH20260084 rev 1 · Building · Lake
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $31.50 | 16.23 | BROH0005-009 collectively bargained (union) rate |
Official document: OH20260084 on SAM.gov.
OH20260085 rev 1 · Building · Lawrence
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $25.37 | 17.42 | BROH0008-007 collectively bargained (union) rate |
Official document: OH20260085 on SAM.gov.
OH20260086 rev 1 · Building · Licking
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260086 on SAM.gov.
OH20260087 rev 1 · Building · Lorain
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $31.50 | 16.23 | BROH0005-009 collectively bargained (union) rate |
Official document: OH20260087 on SAM.gov.
OH20260088 rev 1 · Building · Lucas
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $32.80 | 13.42 | BROH0003-006 collectively bargained (union) rate |
Official document: OH20260088 on SAM.gov.
OH20260089 rev 1 · Building · Madison
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260089 on SAM.gov.
OH20260090 rev 1 · Building · Mahoning
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $24.24 | 9.75 | SUOH2012-092 DOL wage survey rate |
Official document: OH20260090 on SAM.gov.
OH20260091 rev 1 · Building · Medina
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $31.50 | 16.23 | BROH0005-009 collectively bargained (union) rate |
Official document: OH20260091 on SAM.gov.
OH20260092 rev 1 · Building · Miami
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.28 | 11.05 | BROH0022-010 collectively bargained (union) rate |
Official document: OH20260092 on SAM.gov.
OH20260093 rev 1 · Building · Montgomery
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.28 | 11.05 | BROH0022-011 collectively bargained (union) rate |
Official document: OH20260093 on SAM.gov.
OH20260094 rev 1 · Building · Morrow
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.25 | 23.93 | BROH0040-006 collectively bargained (union) rate |
| TILE FINISHER | $30.25 | 23.93 | BROH0040-006 collectively bargained (union) rate |
Official document: OH20260094 on SAM.gov.
OH20260095 rev 1 · Building · Ottawa
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.78 | 23.04 | BROH0046-013 collectively bargained (union) rate |
| TILE FINISHER | $30.78 | 23.04 | BROH0046-013 collectively bargained (union) rate |
Official document: OH20260095 on SAM.gov.
OH20260096 rev 1 · Building · Pickaway
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260096 on SAM.gov.
OH20260097 rev 1 · Building · Portage
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $25.37 | 17.42 | BROH0008-007 collectively bargained (union) rate |
Official document: OH20260097 on SAM.gov.
OH20260098 rev 1 · Building · Preble
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.28 | 11.05 | BROH0022-010 collectively bargained (union) rate |
Official document: OH20260098 on SAM.gov.
OH20260099 rev 1 · Building · Richland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.25 | 23.93 | BROH0040-006 collectively bargained (union) rate |
| TILE FINISHER | $30.25 | 23.93 | BROH0040-006 collectively bargained (union) rate |
Official document: OH20260099 on SAM.gov.
OH20260100 rev 1 · Building · Summit
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $25.37 | 17.42 | BROH0008-007 collectively bargained (union) rate |
Official document: OH20260100 on SAM.gov.
OH20260101 rev 1 · Building · Trumbull
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $24.24 | 9.75 | SUOH2012-103 DOL wage survey rate |
Official document: OH20260101 on SAM.gov.
OH20260102 rev 1 · Building · Union
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260102 on SAM.gov.
OH20260103 rev 1 · Building · Warren
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $22.31 | 10.24 | SUOH2012-105 DOL wage survey rate |
Official document: OH20260103 on SAM.gov.
OH20260104 rev 1 · Building · Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $28.31 | 10.45 | BROH0055-007 collectively bargained (union) rate |
Official document: OH20260104 on SAM.gov.
OH20260105 rev 1 · Building · Wood
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $30.78 | 23.04 | BROH0046-014 collectively bargained (union) rate |
| TILE FINISHER | $30.78 | 23.04 | BROH0046-014 collectively bargained (union) rate |
Official document: OH20260105 on SAM.gov.
OH20260106 rev 1 · Building · Carroll, Stark
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| TILE FINISHER | $25.37 | 17.42 | BROH0008-007 collectively bargained (union) rate |
Official document: OH20260106 on SAM.gov.
Where to go next
Tile Finisher rates in every state · Ohio prevailing wage and state law · Ohio determinations by county · pay calculator
Other trades in Ohio
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Drywall Hanger · Plasterer · Glazier · Insulator (Heat & Frost) · Elevator Constructor · Sprinkler Fitter · Piledriver · Tile Setter · Floor Layer · Line Constructor / Lineman