Heavy Equipment Operator prevailing wage rates in Indiana
Federal Davis-Bacon rates published in 41 active determinations, 2026
- Active federal Davis-Bacon determinations for Indiana publish 212 heavy equipment operator classification rates, across 41 determinations covering 92 counties.
- Those published base rates run from $9.00 to $49.05 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in Indiana: .
This page collects every classification in Indiana's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
IN20260001 rev 3 · Building, Heavy, Highway · La Porte, Lake, Porter, St Joseph, St Joseph
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 FORK LIFTS (HOUSING AND COMMERCIAL ONLY) (LAKE, LAPORTE, AND PORTER COUNTIES) | $35.95 | 45.93 | ENGI0150-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 4 BULL GANG (CRANE ERECTION CREW); HEATERS, MECHANICAL (1 TO 5); OILERS; SWITCHMEN (LAKE, LAPORTE, AND PORTER COUNTIES) | $41.40 | 45.93 | ENGI0150-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 3 AIR COMPRESSOR - SMALL 210 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FEET); AIR COMPRESSOR - LARGE OVER 210; AIR COMPRE | $43.60 | 45.93 | ENGI0150-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 2 AIR COMPORESSOR (3) (FEEDING A COMMON RECEIVER); ASPHALT SPREADER; BOILERS; BULLDOZERS; COMBINATION BACKHOE END LOADER WITH | $47.90 | 45.93 | ENGI0150-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 1 ASPHALT PLANT; AUTOGRADE; BATCH PLANT); BENOTO (REQUIRES 2 ENGINEERS; BOILER & THROTTLE VALVE; BORING MACHINE (MINING MACHIN | $48.70 | 45.93 | ENGI0150-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 BOBCATS AND FORKLIFTS (COMMERCIAL OR RESIDENTIAL). (ST. JOSEPH COUNTY) | $30.60 | 38.65 | ENGI0150-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 4 BOBCAT (UP TO AND INCLUDING 3/4 CU. YD.). COMPRESSOR (OVER 210 CU. FT. AND LESS THAN 600 CU. FT.), GENERATOR (OVER 50 KW.), | $33.20 | 38.65 | ENGI0150-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 3 BUCK HOIST, COMBINATION (SMALL EQUIPMENT OPERATOR), .CONVEYOR (PORTABLE), GROUTING MACHINE, HOIST ELEVATORS (MATERIAL AND PE | $34.00 | 38.65 | ENGI0150-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 2 AIR COMPRESSOR (600 CU. FT. AND OVER), BOB CAT (OVER 3/4 CU. YD.), BOILERS, BROOM (ALL POWERED PROPELLED), BULL DOZERS WITH | $34.80 | 38.65 | ENGI0150-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 1 MECHANIC, ASPHALT PLANT, ASPHALT SPREADER, AUTO GRADER; BATCH PLANT, BENOTO (REQUIRES 2 ENGINEERS), BOILER AND THROTTLE VALV | $36.15 | 38.65 | ENGI0150-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 5 DECK HAND, HETHERINGTON DRIVER, MECHANICAL HEATER (1 TO 5), OUTBOARD OR INBOARD MOTOR BOAT, OILER, POWER SAW (CONCRETE POWER DRIVEN) | $45.90 | 43.40 | ENGI0150-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 4 AIR COMPRESSORS, CONVEYOR (ALL), FIREMAN ON BOILER, GENERATOR, GROUT MACHINE, POWER CURING SPRAYING MACHINE (SELF-PROPELLED), BROOM | $46.95 | 43.40 | ENGI0150-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 3 BACK FILLER, BITUMINOUS DISTRIBUTOR, BROOM AND BELT MACHINE, BULL FLOAT, COMPRESSOR (COMMON RECEIVER 2), CONCRETE CUTTER WHEEL TYPE | $48.15 | 43.40 | ENGI0150-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 2 COMBINATION BACKHOE FRONT END LOADER MACHINE WITH LESS THAN 1/2 CU. YD., BACKHOE BUCKET OR WITH ATTACHMENTS, BITUMINOUS MIXER, BITUM | $48.60 | 43.40 | ENGI0150-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY/HIGHWAY GROUP 1 ASPHALT PLANTS (CONSTRUCTION), ASPHALT PLANT (PERMANENT), AUTO PATROL (MAINTAINER), AUTOMATIC DRY BATCH PLANT, AUTOMATED CONCRETE PL | $49.05 | 43.40 | ENGI0150-014 collectively bargained (union) rate |
Official document: IN20260001 on SAM.gov.
IN20260002 rev 2 · Building · Adams, Allen, Bartholomew, Benton, Blackford, Boone and 32 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR (UNDER 200 CU. FR. PER MIN), BITUMINOUS DISTRIBUTOR, CEMENT GUN, CONCRETE SAW, CONVEYOR, DECK HAND OILER, EARTH ROLLER, FORM GRADE | $30.43 | 23.95 | ENGI0103-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 AIR COMPRESSOR 210 CU FT & OVER, BITUMINOUS DISTRIBUTOR, CHAIR CART, CONCRETE CURING MACHINE, CONCRETE SAW, DOPE POT POWER AGITATED, FLEX PLANE, | $35.00 | 23.95 | ENGI0103-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 AIR COMPRESSOR (UP TO 600 CU. FT.), BRAKEMAN, BULL FLOAT, CONCRETE MIXER (OVER 10S AND UNDER 21S), CONCRETE SPREADER OR PUDDLER, DECK ENGINE, DRI | $35.70 | 23.95 | ENGI0103-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 A-FRAME WINCH TRUCK, AIR COMPRESSORS OVER 600 CU.FT., AIR TUGGER, AUTOGRADE (CMI), AUTO PATROL, BACKHOE, BALLAST REGULATOR (RR), BATCHER PLANT (E | $38.70 | 23.95 | ENGI0103-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR (LESS THAN 210 CU. FT.); CONCRETE MIXER (UNDER 21CU. FT.); CONVEYOR; GENERATOR; MECHANICAL HEATER; OILER; OPERATOR-2 PIECES OF MIN | $28.30 | 19.96 | ENGI0103-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 AIR COMPRESSOR (210 CU. FT. & OVER); BITUMINOUS DISTRIBUTOR; CHAIR CART; CONCRETE CURING MACHINE; CONCRETE SAW; DOPE POT POWER AGITATED; FLEX PLA | $32.08 | 19.96 | ENGI0103-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 A FRAME TRUCK; BATCHER PLANT (AUTOMATIC DRY BATCH); BENDING MACHINE-POWER DRIVEN; BITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT ENGINEER; | $36.13 | 19.96 | ENGI0103-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR COMPRESSOR (PRESSURIZING SHAFTS, TUNNELS & DRIVERS); AIR TUGGER; AUTO PATROL; BACK FILLER; BACK HOE; BOOM CAT; BORING MACHINE; BULL DOZER; CA | $37.08 | 19.96 | ENGI0103-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 AIR COMPRESSOR (PRESSURIZING SHAFTS, TUNNELS AND DIVERS); AIR COMPRESSOR (OVER 210 CU. FT.); CONCRETE SAW; CONVEYOR; GENERATORS; OILER; OPERATING | $31.50 | 23.30 | ENGI0103-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 BITUMINOUS DISTRIBUTOR; CHAIR CART; CONCRETE CUTING MACHINE; DEWATERING SYTEMS; DOPE POT POWER AGITATED; FLEX PLANE; FORK LIFT (MASONRY AND MATER | $35.00 | 23.30 | ENGI0103-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BENDING MACHINE POWER DRIVEN; BITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT ENGINEER; BOATMAN; BULL FLOAT; COMPACTOR OR TAMPER RIDING ONLY | $38.00 | 23.30 | ENGI0103-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR TUGGER; AUTO PATROL, BACK FILLER; BACK HOE; BOOM CAT; BORING MACHINE; BULL DOZER; CAISSON DRILLING MACHINE; CHERRY PICKER; COMPACTOR (WITH DO | $38.95 | 23.30 | ENGI0103-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 5 BOBCATS AND FORKLIFTS (COMMERCIAL OR RESIDENTIAL). (FULTON AND NOBLE COUNTIES) | $30.60 | 38.65 | ENGI0150-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 4 BOBCAT (UP TO AND INCLUDING 3/4 CU. YD.). COMPRESSOR (OVER 210 CU. FT. AND LESS THAN 600 CU. FT.), GENERATOR (OVER 50 KW.), HEATERS, MECHANICAL, HO | $33.20 | 38.65 | ENGI0150-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3 BUCK HOIST, COMBINATION (SMALL EQUIPMENT OPERATOR), .CONVEYOR (PORTABLE), GROUTING MACHINE, HOIST ELEVATORS (MATERIAL AND PERSONNEL), HYDRAULIC POW | $34.00 | 38.65 | ENGI0150-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2 AIR COMPRESSOR (600 CU. FT. AND OVER), BOB CAT (OVER 3/4 CU. YD.), BOILERS, BROOM (ALL POWERED PROPELLED), BULL DOZERS WITH ENGINES OF LESS THAN 14 | $34.80 | 38.65 | ENGI0150-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1 MECHANIC, ASPHALT PLANT, ASPHALT SPREADER, AUTO GRADER; BATCH PLANT, BENOTO (REQUIRES 2 ENGINEERS), BOILER AND THROTTLE VALVE, BORING MACHINE (ROAD | $36.15 | 38.65 | ENGI0150-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP B AIR COMPRESSOR (1 OR MORE, 600 CFM AND OVER), AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRIBUTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONCRE | $35.30 | 19.60 | ENGI0181-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE (CMI), AUTO PATROL, BALLAST REGULATOR (RR), BATCHER PLANT (ELECTRICAL CONTROL CONCRETE), BENDIN | $43.43 | 19.60 | ENGI0181-004 collectively bargained (union) rate |
Official document: IN20260002 on SAM.gov.
IN20260003 rev 2 · Building · Clay, Gibson, Greene, Owen, Parke, Posey and 6 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP B AIR COMPRESSOR (1 OR MORE, 600 CFM AND OVER), AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRUBTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONCRET | $35.30 | 19.60 | ENGI0181-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE (CMI), AUTO PATROL, BALLAST REGULATOR (RR), BATCHER PLANT (ELECTRICAL CONTROL CONCRETE), BENDIN | $43.43 | 19.60 | ENGI0181-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SEL | $26.75 | 23.00 | ENGI0841-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM | $33.90 | 23.00 | ENGI0841-001 collectively bargained (union) rate |
Official document: IN20260003 on SAM.gov.
IN20260004 rev 2 · Building · Brown, Clark, Dearborn, Decatur, Fayette, Floyd and 11 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS:: GROUP 4 AIR COMPRESSOR (LESS THAN 210 CU. FT.); CONCRETE MIXER (UNDER 21CU. FT.); CONVEYOR; GENERATOR; MECHANICAL HEATER; OILER; OPERATOR-2 PIECES OF MI | $31.78 | 22.70 | ENGI0103-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:: GROUP 3 AIR COMPRESSOR (210 CU. FT. & OVER); BITUMINOUS DISTRIBUTOR; CHAIR CART; CONCRETE CURING MACHINE; CONCRETE SAW; DOPE POT POWER AGITATED; FLEX PL | $35.48 | 22.70 | ENGI0103-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 A FRAME TRUCK; BATCHER PLANT (AUTOMATIC DRY BATCH); BENDING MACHINE-POWER DRIVEN; BITUMINOUS MIXER; BITUMINOUS PAVER; BITUMINOUS PLANT ENGINEER; | $39.53 | 22.70 | ENGI0103-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR COMPRESSOR (PRESSURIZING SHAFTS, TUNNELS & DRIVERS) AIR TUGGER; AUTO PATROL; BACK FILLER; BACK HOE; BOOM CAT; BORING MACHINE; BULL DOZER; CAI | $40.48 | 22.70 | ENGI0103-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP B AIR COMPRESSOR (1 OR MORE, 600 CFM AND OVER) AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRIBUTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONRETE | $35.30 | 19.60 | ENGI0181-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE (CMI), AUTO PATROL, BALLAST REGULATOR (RR), BATCHER PLANT (ELECTRICAL CONTROL CONCRETE), BENDIN | $43.43 | 19.60 | ENGI0181-012 collectively bargained (union) rate |
Official document: IN20260004 on SAM.gov.
IN20260005 rev 2 · Building · Elkhart, Jasper, Kosciusko, Lagrange, Marshall, Newton and 2 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 5 GROUP 5: BOBCATS AND FORKLIFTS (COMMERCIAL OR RESIDENTIAL) (ELKHART, KOSCIUSKO, LAGRANGE AND MARSHALL COUNTIES) | $30.60 | 38.65 | ENGI0150-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 5 FORKLIFTS (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $35.95 | 38.65 | ENGI0150-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 4: BOBCAT (UP TO AND INCLUDING 3/4 CU. YD.). COMPRESSOR (OVER 210 CU. FT. AND LESS THAN 600 CU. FT.), GENERATOR (OVER 50 KW.), HEATERS, MECHANICAL, H | $33.20 | 38.65 | ENGI0150-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 4 HEATERS, MECHANICAL (1 TO 5), OILERS, SWITHMEN, BULL GANG (CRANE ERECTION CREW). (JASPER, NEWTON, PULASKI & STARKE COUNTIES) | $41.40 | 38.65 | ENGI0150-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3: BUCK HOIST, COMBINATION (SMALL EQUIPMENT OPERATOR), CONVEYOR (PORTABLE), GROUTING MACHINE, HOIST ELEVATORS (MATERIAL AND PERSONNEL), HYDRAULIC POW | $34.00 | 38.65 | ENGI0150-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3 CONCRETE MIXER (2 BAG AND OVER), CONVEYOR, PORTABLE, STEAM GENERATORS, TRACTORS (FARM AND SIMILAR TYPE), AIR COMPRESSOR (SMALL 150 AND UNDER - 1 TO | $43.60 | 38.65 | ENGI0150-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2: AIR COMPRESSOR (600 CU. FT. AND OVER), BOB CAT (OVER 3/4 CU. YD.), BOILERS, BROOM (ALL POWERED PROPELLED), BULL DOZERS WITH ENGINES LESS THAN 140 | $34.80 | 38.65 | ENGI0150-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2 AIR COMPRESSORS (30 FEEDING AND COMMON RECEIVERS, ASPHALT SPREADER, BOILERS, BULLDOZERS, COMBINATION BACKHOE-END LOADER WITH BACKHOE BUCKET 1/2 CU. | $47.90 | 38.65 | ENGI0150-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1: MECHANIC, ASPHALT PLANT, ASPHLAT SPREADER, AUTO GRADER; BATCH PLANT, BENOTO (REQUIRES 2 ENGINEERS), BOILER AND THROTTLE VALVE, BORING MACHINE (ROA | $36.15 | 38.65 | ENGI0150-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1 MECHANIC, ASPHALT PLANT, AUTO GRADER; BATC PLANT, BENOTO (REQUIRES 2 ENGINEERS), BOILER AND THROTTLE VALVE, BORING MACHINE, (MINING MACHINE CAISSON | $48.70 | 38.65 | ENGI0150-002 collectively bargained (union) rate |
Official document: IN20260005 on SAM.gov.
IN20260006 rev 3 · Heavy, Highway · Adams, Allen, Bartholomew, Benton, Blackford, Boone and 83 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1- AIR COMPRESSORS IN MANIFOLD WITH THROTTLE VALVE; ASPHALT PLANT ENGINEER; AUTO GRADE OR SIMILAR TYPE MACHINE; AUTO PATROL; BACKHOE OR FARM-TYPE T | $44.60 | 23.35 | ENGI0103-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2- AIR COMPRESSOR WITH THROTTLE VALVE OR CLEVER BROOKS-TYPE COMBINATION; BACKFILLER; BACKHOE ON FARM-TYPE TRACTOR, UNDER 45 HP; BULL FLOAT; CHERRY | $42.88 | 23.35 | ENGI0103-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3- ASSISTANT PLANT ENGINEER; BASE PAVER (JERSEY OR SIMILAR TYPE MACHINE); CONCRETE FINISHING MACHINE; CONCRETE MIXER, LESS THAN 21 CU. FT.; CURB MA | $41.96 | 23.35 | ENGI0103-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4- AIR COMPRESSOR; ASSISTANT TO ENGINEER, OILER; AUTOMATIC DRY BATCH PLANT; BITUMINOUS DISTRIBUTOR; BITUMINOUS PATCHING TAMPER; BELT SPREADER; BROO | $40.46 | 23.35 | ENGI0103-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 4 AIR COMPRESSOR; ASSISTANT TO ENGINEER, OILER; BITUMINOUS PATCHING TAMPER; BELT SPREADER; BROOM AND BELT | $34.55 | 36.65 | ENGI0150-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 5 SKID STEER LOADER UNDER 3/4 CU. YDS (ELKHART, FULTON, JASPER, KOSCIUSKO, LAGRANGE, MARSHALL, NEWTON, NOB | $24.30 | 30.85 | ENGI0150-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION:GROUP 3 PLANT ENGINEER; BASE PAVER (JERSEY OR SIMILAR TYPE MACHINE); CONCRETE FINISHING MACHINE; CONCRETE MIXER, | $35.95 | 36.65 | ENGI0150-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 1 AIR COMPRESSORS IN MANIFOLD WITH THROTTLE VALVE; ASPHALT PLANT ENGINEER; AUTO GRADE OR SIMILAR TYPE MACH | $38.85 | 36.65 | ENGI0150-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION: GROUP 2 AIR COMPRESSOR WITH THROTTLE VALVE OR CLEVER BROOKS TYPE COMBINATION; BACKFILLER; FARM TYPE TRACTOR (UND | $37.25 | 36.65 | ENGI0150-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 3 BACK FILLER, BITUMINOUS DISTRIBUTOR, BROOM AND BELT MACHINE, BULL FLOAT, COMPRESSOR (COMMON RECEIVER 2), CONCR | $43.60 | 45.93 | ENGI0150-039 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 1 ASPHALT PLANTS (CONSTRUCTION), ASPHALT PLANT (PERMANENT), AUTO PATROL (MAINTAINER), AUTOMATIC DRY BATCH PLANT, | $48.70 | 45.93 | ENGI0150-039 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 2 COMBINATION BACKHOE FRONT END LOADER MACHINE WITH LESS THAN 1/2 CU. YD., BACKHOE BUCKET OR WITH ATTACHMENTS, B | $47.90 | 45.93 | ENGI0150-039 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 4 AIR COMPRESSORS, CONVEYOR (ALL), FIREMAN ON BOILER, GENERATOR, GROUT MACHINE, POWER CURING SPRAYING MACHINE (S | $41.40 | 45.93 | ENGI0150-039 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, UNDERGROUND & UTILITY CONSTRUCTION: GROUP 5 DECK HAND, HETHERINGTON DRIVER, MECHANICAL HEATER (1 TO 5), OUTBOARD OR INBOARD MOTOR BOAT, OILER, POWER SAW ( | $35.95 | 45.93 | ENGI0150-039 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP C- AIR COMPRESSOR, OILER; AUTOMATIC DRY BATCH PLANT; BITUMINOUS DISTRIBUTOR; BITUMINOUS PATCHING TAMPER; BELT SPREA | $42.02 | 19.60 | ENGI0181-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:: GROUP A (BARTHOLOMEW, BROWN, CLARK, CRAWFORD, DEARBORN, DECATUR, DUBOIS, FLOYD, FRANKLIN, GIBSON, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, MART | $46.80 | 19.60 | ENGI0181-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:: GROUP B (BARTHOLOMEW, BROWN, CLARK, CRAWFORD, DEARBORN, DECATUR, DUBOIS, FLOYD, FRANKLIN, GIBSON, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, MART | $44.15 | 19.60 | ENGI0181-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 1 (AIR COMPRESSOR OVER 600 CU FT, AIR COMPRESSORS (2), COMPRESSORS HOOKED IN MANIFOLD, ASPHALT PLANT ENGIN | $38.80 | 27.15 | ENGI0841-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: HEAVY, HIGHWAY AND UTILITY CONSTRUCTION: GROUP 2 AIR COMPRESSOR 600 CU. FT. AND UNDER, AIR TUGGER, AIR VALVES, ASSISTANT CONCRETE PLANT ENGINEER, ASSISTA | $32.55 | 27.15 | ENGI0841-011 collectively bargained (union) rate |
Official document: IN20260006 on SAM.gov.
IN20260007 rev 1 · Building · Jackson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOE | $39.50 | 19.28 | ENGI0181-023 collectively bargained (union) rate |
Official document: IN20260007 on SAM.gov.
IN20260008 rev 2 · Building · Daviess, Martin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOE (MARTIN COUNTY) | $34.98 | 16.50 | ENGI0181-025 collectively bargained (union) rate |
Official document: IN20260008 on SAM.gov.
IN20260009 rev 2 · Building · Knox
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOE - CRANE - FRONT END LOADER | $32.25 | 23.00 | ENGI0841-010 collectively bargained (union) rate |
Official document: IN20260009 on SAM.gov.
IN20260010 rev 1 · Building · Jefferson, Scott
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: LOADER | $14.67 | 0.00 | SUIN1995-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $9.00 | 0.00 | SUIN1995-001 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $11.06 | 0.00 | SUIN1995-001 DOL wage survey rate |
Official document: IN20260010 on SAM.gov.
IN20260011 rev 1 · Building · Crawford, Perry
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $13.85 | 3.07 | SUIN1996-002 DOL wage survey rate |
Official document: IN20260011 on SAM.gov.
IN20260012 rev 2 · Building · Spencer
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $14.11 | 2.74 | SUIN1996-001 DOL wage survey rate |
Official document: IN20260012 on SAM.gov.
IN20260013 rev 1 · Building · Lawrence
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (BACKHOE & CRANE) | $39.50 | 19.78 | ENGI0181-022 collectively bargained (union) rate |
Official document: IN20260013 on SAM.gov.
IN20260014 rev 2 · Building · Dubois, Pike
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: CRANE, FRONT END LOADER, & OILER | $32.25 | 23.00 | ENGI0841-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $10.54 | 1.84 | SUIN1996-006 DOL wage survey rate |
Official document: IN20260014 on SAM.gov.
IN20260015 rev 1 · Building · Orange, Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BULLDOZER | $15.54 | 3.38 | SUIN1996-007 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $14.38 | 3.32 | SUIN1996-007 DOL wage survey rate |
Official document: IN20260015 on SAM.gov.
IN20260016 rev 1 · Residential · Henry
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (2) ROLLER | $31.93 | 16.40 | ENGI0103-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/SKID LOADER AND GRADER/BLADE | $33.65 | 16.40 | ENGI0103-011 collectively bargained (union) rate |
Official document: IN20260016 on SAM.gov.
IN20260017 rev 1 · Residential · Huntington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (2) ROLLER | $31.93 | 16.40 | ENGI0103-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/ SKID LOADER AND GRADER/BLADE | $33.65 | 16.40 | ENGI0103-012 collectively bargained (union) rate |
Official document: IN20260017 on SAM.gov.
IN20260018 rev 1 · Residential · Jay
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (2) ROLLER | $31.93 | 16.40 | ENGI0103-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/SKID LOADER AND GRADER/BLADE | $33.65 | 16.40 | ENGI0103-011 collectively bargained (union) rate |
Official document: IN20260018 on SAM.gov.
IN20260019 rev 1 · Residential · Wayne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (2) ROLLER | $31.93 | 16.40 | ENGI0103-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/SKID LOADER AND GRADER/BLADE | $33.65 | 16.40 | ENGI0103-011 collectively bargained (union) rate |
Official document: IN20260019 on SAM.gov.
IN20260020 rev 1 · Residential · Adams, Blackford, DeKalb, DeKalb, Fayette, Fulton and 11 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (2) ROLLER (ADAMS, DEKALB, FULTON, KOSCIUSKO, LAGRANGE, MARSHALL, NOBLE, AND STEUBEN COUNTIES) | $31.93 | 16.40 | ENGI0103-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/ SKID LOADER AND GRADER/BLADE (ADAMS, DEKALB, FULTON, KOSCIUSKO, LAGRANGE, MARSHALL, NOBLE, AND STEUBEN COUNTIES) | $33.65 | 16.40 | ENGI0103-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (2) ROLLER (BLACKFORD, FAYETTE, RANDOLPH, RUSH, UNION, AND WABASH COUNTIES) | $31.93 | 16.40 | ENGI0103-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/SKID LOADER AND GRADER/BLADE (BLACKFORD, FAYETTE, RANDOLPH, RUSH, UNION, AND WABASH COUNTIES) | $33.65 | 16.40 | ENGI0103-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (2) ROLLER (GRANT AND MIAMI COUNTIES) | $31.93 | 16.40 | ENGI0103-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/ SKID LOADER AND GRADER/BLADE (GRANT AND MIAMI COUNTIES) | $33.65 | 16.40 | ENGI0103-017 collectively bargained (union) rate |
Official document: IN20260020 on SAM.gov.
IN20260021 rev 1 · Residential · Clinton, Fountain, Montgomery, Pulaski, Starke, Warren and 1 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/ SKID LOADER AND GRADER/BLADE (CLINTON AND WHITE COUNTIES) | $33.65 | 16.40 | ENGI0103-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/ SKID LOADER AND GRADER/BLADE (FOUNTAIN, MONTGOMERY, PULASKI, STARKE, AND WARREN COUNTIES) | $30.63 | 14.52 | ENGI0103-020 collectively bargained (union) rate |
Official document: IN20260021 on SAM.gov.
IN20260022 rev 1 · Residential · Crawford, Daviess, Dubois, Knox, Lawrence, Martin and 5 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/ SKID LOADER AND GRADER/BLADE | $30.63 | 14.52 | ENGI0103-019 collectively bargained (union) rate |
Official document: IN20260022 on SAM.gov.
IN20260023 rev 1 · Residential · Decatur, Jefferson, Jennings, Ripley, Scott, Switzerland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (1) BOBCAT/SKID STEER/ SKID LOADER AND GRADER/BLADE | $30.63 | 14.52 | ENGI0103-019 collectively bargained (union) rate |
Official document: IN20260023 on SAM.gov.
IN20260032 rev 2 · Residential · Jackson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $33.65 | 16.40 | ENGI0103-018 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER: ASPHALT, AGGREGATE, AND CONCRETE | $33.65 | 16.40 | ENGI0103-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (2) LOADER | $38.60 | 28.83 | ENGI0150-029 collectively bargained (union) rate |
| OPERATOR: BULLDOZER | $27.35 | 13.44 | SUIN2023-017 DOL wage survey rate |
Official document: IN20260032 on SAM.gov.
IN20260033 rev 2 · Residential · Cass
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR | $33.65 | 16.40 | ENGI0103-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER: ASPHALT, AGGREGATE, AND CONCRETE | $33.65 | 16.40 | ENGI0103-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: (2) LOADER | $38.60 | 28.83 | ENGI0150-029 collectively bargained (union) rate |
| OPERATOR: BULLDOZER | $27.35 | 13.44 | SUIN2023-018 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $35.71 | 29.55 | SUIN2023-018 DOL wage survey rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $32.00 | 30.65 | SUIN2023-018 DOL wage survey rate |
Official document: IN20260033 on SAM.gov.
IN20260041 rev 1 · Residential · Allen
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260041 on SAM.gov.
IN20260042 rev 1 · Residential · Delaware
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.15 | 19.25 | ENGI0103-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $42.15 | 37.20 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $42.15 | 36.05 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $42.15 | 37.20 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260042 on SAM.gov.
IN20260043 rev 1 · Residential · Gibson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260043 on SAM.gov.
IN20260044 rev 1 · Residential · Hamilton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.15 | 19.25 | ENGI0103-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $42.15 | 37.20 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $42.15 | 36.05 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $42.15 | 37.20 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260044 on SAM.gov.
IN20260045 rev 1 · Residential · Madison
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.15 | 19.25 | ENGI0103-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $42.15 | 37.20 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $42.15 | 36.05 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $42.15 | 37.20 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260045 on SAM.gov.
IN20260046 rev 1 · Residential · Bartholomew, Dearborn, Franklin, Ohio
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.15 | 19.25 | ENGI0103-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $42.15 | 37.20 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $42.15 | 36.05 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $42.15 | 37.20 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260046 on SAM.gov.
IN20260047 rev 1 · Residential · Benton, Carroll, Tippecanoe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260047 on SAM.gov.
IN20260048 rev 1 · Residential · Boone, Brown, Hancock, Hendricks, Johnson, Marion and 3 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.15 | 19.25 | ENGI0103-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $42.15 | 37.20 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $42.15 | 36.05 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $42.15 | 37.20 | ENGI0150-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260048 on SAM.gov.
IN20260049 rev 1 · Residential · Clark, Floyd, Harrison, Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260049 on SAM.gov.
IN20260050 rev 1 · Residential · Clay, Sullivan, Vermillion, Vigo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260050 on SAM.gov.
IN20260051 rev 1 · Residential · Elkhart, La Porte, St Joseph, St Joseph
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260051 on SAM.gov.
IN20260052 rev 1 · Residential · Greene, Monroe, Owen
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260052 on SAM.gov.
IN20260053 rev 1 · Residential · Howard, Tipton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260053 on SAM.gov.
IN20260054 rev 1 · Residential · Jasper, Lake, Newton, Porter
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $49.05 | 43.40 | ENGI0150-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR SCRAPER | $49.05 | 43.40 | ENGI0150-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260054 on SAM.gov.
IN20260055 rev 1 · Residential · Posey, Vanderburgh, Warrick
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260055 on SAM.gov.
IN20260056 rev 1 · Residential · Wells, Whitley
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | 43.40 | ENGI0150-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | 38.65 | ENGI0150-052 collectively bargained (union) rate |
Official document: IN20260056 on SAM.gov.
Where to go next
Heavy Equipment Operator rates in every state · Indiana prevailing wage and state law · Indiana determinations by county · pay calculator
Other trades in Indiana
Electrician · Plumber · Pipefitter · HVAC Mechanic · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Plasterer · Glazier · Insulator (Heat & Frost) · Millwright · Boilermaker · Elevator Constructor · Sprinkler Fitter · Tile Setter · Tile Finisher · Line Constructor / Lineman