Heavy Equipment Operator prevailing wage rates in Pennsylvania
Federal Davis-Bacon rates published in 93 active determinations, 2026
- Active federal Davis-Bacon determinations for Pennsylvania publish 601 heavy equipment operator classification rates, across 93 determinations covering 67 counties.
- Those published base rates run from $7.25 to $57.52 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in Pennsylvania: .
This page collects every classification in Pennsylvania's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
PA20260001 rev 6 · Building · Allegheny
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CLASS I ASPHALT PAVER, ASPHALT ROLLER, ASPHALT PLANT OPERATOR, ATHEY LOADER, AUGER (TRUCK OR TRACTOR MOUNTED), AUTO GRADER (C.M.I. AND SIMILAR), BACKHOE ( | $32.83 | 24.05 | ENGI0066-001 collectively bargained (union) rate |
Official document: PA20260001 on SAM.gov.
PA20260002 rev 5 · Heavy, Highway · Allegheny, Armstrong, Beaver, Bedford, Blair, Butler and 27 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1- ASPHALT PAVING MACHINE (SPREADER), AUTOGRADE (C.M.I. AND SIMILAR); BACKFILLER, COMPACTOR WITH BLADE, BACKHOE-360 AND 180 DEGREE SWING; CABLEWAY; | $41.96 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1- ASPHALT PAVING MACHINE (SPREADER), AUTOGRADE (C.M.I. AND SIMILAR); BACKFILLER, COMPACTOR WITH BLADE, BACKHOE-360 AND 180 DEGREE SWING; CABLEWAY; | $41.67 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1-A- BACKHOES-360 DEGREE SWING (ABOVE 120,000 LBS. GROSS WEIGHT); CRANES (OVER 100 TONS), CRANES-ROUGH TERRAIN (OVER 100 TON); TUG BOAT PILOT (ON B | $44.96 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1-A- BACKHOES-360 DEGREE SWING (ABOVE 120,000 LBS. GROSS WEIGHT); CRANES (OVER 100 TONS), CRANES-ROUGH TERRAIN (OVER 100 TON); TUG BOAT PILOT (ON B | $44.67 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1-B- BACKHOES-360 DEGRESS SWING (ABOVE 70,000 LBS. TO 120,000 LBS. GROSS WEIGHT); CRANES (UP TO 100 TON), CRANES0ROUGH TERRAIN (65 TON - 100 TON), | $43.96 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1-B- BACKHOES-360 DEGRESS SWING (ABOVE 70,000 LBS. TO 120,000 LBS. GROSS WEIGHT); CRANES (UP TO 100 TON), CRANES0ROUGH TERRAIN (65 TON - 100 TON), | $43.67 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2- ASPHALT PLANT OPERATOR; AUGER (TRACTOR MTD.); AUGER (TRUCK MTD.); BELT LOADER (EUCLID OR SIMILAR); BORING MACHINE; CABLE PLACER OR LAYER; DIRECT | $41.70 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2- ASPHALT PLANT OPERATOR; AUGER (TRACTOR MTD.); AUGER (TRUCK MTD.); BELT LOADER (EUCLID OR SIMILAR); BORING MACHINE; CABLE PLACER OR LAYER; DIRECT | $41.39 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3- BROOM FINISHER (C.M.I. OR SIMILAR); COMPACTORS/ROLLERS (STATIC OR VIBRATORY (SELF-PROPELLED) ON DIRT OF STONE); CURB BUILDER; MINOR EQUIPMENT OP | $38.05 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3- BROOM FINISHER (C.M.I. OR SIMILAR); COMPACTORS/ROLLERS (STATIC OR VIBRATORY (SELF-PROPELLED) ON DIRT OF STONE); CURB BUILDER; MINOR EQUIPMENT OP | $37.75 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4- BALLAST REGULATOR; COMPRESSOR; CONCRETE MIXER (1 CY. & UNDER WITH SKIP); CONCRETE SAW (RIDDEN OR SELF-PROPELLED); CONVERYOR; ELEVATOR (MATERIAL | $37.59 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4- BALLAST REGULATOR; COMPRESSOR; CONCRETE MIXER (1 CY. & UNDER WITH SKIP); CONCRETE SAW (RIDDEN OR SELF-PROPELLED); CONVERYOR; ELEVATOR (MATERIAL | $37.26 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5- DECK HAND; FARM TRACTOR; FIREMAN ON BOILER; OILER; POWER BROOM; SIDE DELIVERY SHOULDER SPREADER (ATTACHMENT). (ALLEGHENY, ARMSTRONG, BEAVER, BLA | $37.34 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5- DECK HAND; FARM TRACTOR; FIREMAN ON BOILER; OILER; POWER BROOM; SIDE DELIVERY SHOULDER SPREADER (ATTACHMENT). (BEDFORD, CAMERON, CLINTON, FOREST | $37.05 | 24.66 | ENGI0066-016 collectively bargained (union) rate |
Official document: PA20260002 on SAM.gov.
PA20260003 rev 1 · Building · Philadelphia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 6 FIREMAN, OILERS AND DECK HANDS (PERSONNEL BOATS), GREASE TRUCK. MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE, ROBOTIC OR LASER CONTROL EQUIPMEN | $47.17 | 32.33 | ENGI0542-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MAINTENANCE ENGINEER (POWER BOATS),ELEVATOR OPERATORS (RENOVATION | $48.16 | 32.62 | ENGI0542-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREADER, POWER BROOM (SELF-CONTAINED), SEED SPREADER, GREASE TRUCK, | $49.88 | 33.13 | ENGI0542-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROLS, FINE GRADE MACHINES, TEN-TON ROLLER (GRADE FILL STONE BASE), | $50.18 | 33.22 | ENGI0542-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CR | $57.29 | 35.29 | ENGI0542-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, PAVERS 21E AND OVER, TRENCHING MACHI | $54.27 | 34.42 | ENGI0542-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WITH ERECTION 15 TON AND OVER FACTORY RATING; CRANES DOING HOOK W | $57.52 | 35.38 | ENGI0542-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, HELICOPTERS, CONCRETE PUMPS BUILDIN | $54.52 | 34.49 | ENGI0542-002 collectively bargained (union) rate |
Official document: PA20260003 on SAM.gov.
PA20260004 rev 5 · Heavy, Highway · Bucks, Chester, Delaware, Montgomery, Philadelphia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 1 HANDLING STEEL AND STONE IN CONNECTION WITH ERECTION, CRANES DOING HOOK WORK, ANY | $53.36 | 33.65 | ENGI0542-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 1A MACHINES HANDLING STEEL, OR THE FUNCTIONAL EQUIVALENT, AND STONE IN CONNECTION WI | $56.37 | 34.53 | ENGI0542-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 2 ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, ALL T | $53.11 | 33.58 | ENGI0542-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBLIC YARD FACTORY RATING; HYDRAU | $56.13 | 34.45 | ENGI0542-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 3 ASPHALT PLANT ENGINEERS, WELL DRILLERS, DITCH WITCH (SMALL TRENCHER), MOTOR PATROL | $49.03 | 32.37 | ENGI0542-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 4 SEAMAN, PULVERZER FORM LINE GRADER, FARM TRACTORS, ROAD FINISHING, CONCRETE SPREAD | $48.73 | 32.28 | ENGI0542-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, HEAVY, HIGHWAY, AND WATER LINE CONSTRUCTION (OFF PLANT SITE): GROUP 5 COMPRESSORS PUMPS, WELL POINT PUMPS, WELDING MACHINES TIREMAN, POWER EQUIPMENT, MA | $47.00 | 31.78 | ENGI0542-005 collectively bargained (union) rate |
Official document: PA20260004 on SAM.gov.
PA20260005 rev 3 · Residential · Beaver, Fayette, Washington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CLASS I ASPHALT PAVER, ASPHALT ROLLER, ASPHALT PLANT OPERATOR, ATHEY LOADER, AUGER (TRUCK OR TRACTOR MOUNTED), AUTO GRADER (C.M.I. AND SIMILAR), BACKHOE ( | $25.64 | 15.75 | ENGI0066-020 collectively bargained (union) rate |
Official document: PA20260005 on SAM.gov.
PA20260006 rev 1 · Heavy, Highway · Adams, Berks, Bradford, Carbon, Columbia, Cumberland and 23 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 4 FIREMAN AND GREASE TRUCK BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, M | $40.26 | 29.54 | ENGI0542-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 6A ALL MACHINES WITH BOOMS (INCLUDING JIBS, MASTS, LEADS, ETC.) 100 FEET 15 TON | $45.05 | 30.96 | ENGI0542-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 5 OILERS AND DECK HANDS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS | $39.73 | 29.41 | ENGI0542-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 3 WELDING MACHINE, WELL POINTS, COMPRESSORS, PUMP HEATERS, FARM TRACTORS, FORM L | $40.70 | 29.68 | ENGI0542-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 2 SPREADERS, ASPHALT PLANT ENGINEERS, ROLLERS (HIGH GRADE FINISHING), MACHINE SI | $41.39 | 29.89 | ENGI0542-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYD | $44.81 | 30.92 | ENGI0542-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1 PILE DRIVERS, ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, DRAGLINES, KEYSTONES | $42.56 | 30.24 | ENGI0542-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLE WAYS; DRAGLI | $45.71 | 31.16 | ENGI0542-022 collectively bargained (union) rate |
Official document: PA20260006 on SAM.gov.
PA20260011 rev 2 · Residential · Erie
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (BACKHOE, BULLDOZER, LOADER) | $28.25 | 14.87 | ENGI0066-010 collectively bargained (union) rate |
Official document: PA20260011 on SAM.gov.
PA20260012 rev 3 · Residential · Allegheny
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (BACKHOE) | $17.34 | 4.06 | SUPA2003-001 DOL wage survey rate |
Official document: PA20260012 on SAM.gov.
PA20260015 rev 1 · Residential · Northumberland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOES | $10.00 | 0.38 | SUPA1995-006 DOL wage survey rate |
Official document: PA20260015 on SAM.gov.
PA20260019 rev 2 · Residential · Cambria, Somerset
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BULLDOZER | $8.98 | 0.00 | SUPA1993-001 DOL wage survey rate |
Official document: PA20260019 on SAM.gov.
PA20260020 rev 5 · Heavy · Allegheny, Armstrong, Beaver, Bedford, Blair, Butler and 27 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 1-A BACKHOES-360 DEGREE SWING (ABOVE 120,000 LBS. GROSS WEIGHT); CRANES (OVER 100 TONS), CRANES-ROUGH TERRAIN (OVER 100 TON) (HEAVY) ALLEGHENY, ARMS | $41.59 | 24.03 | ENGI0066-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1-A BACKHOES-360 DEGREE SWING (ABOVE 120,000 LBS. GROSS WEIGHT); CRANES (OVER 100 TONS), CRANES-ROUGH TERRAIN (OVER 100 TON) (HEAVY) BEDFORD, CAMERO | $41.30 | 24.03 | ENGI0066-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1-B BACKHOES-360 DEGREE SWING (ABOVE 70,000 LBS. TO 120,000 LBS. GROSS WEIGHT); CRANES (UP TO 100 TON), CRANES-ROUGH TERRAIN (65 TON-100 TON), TOWER | $40.59 | 24.03 | ENGI0066-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1-B BACKHOES-360 DEGREE SWING (ABOVE 70,000 LBS. TO 120,000 LBS. GROSS WEIGHT); CRANES (UP TO 100 TON), CRANES-ROUGH TERRAIN (65 TON-100 TON), TOWER | $40.30 | 24.03 | ENGI0066-009 collectively bargained (union) rate |
Official document: PA20260020 on SAM.gov.
PA20260021 rev 2 · Residential · Butler
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT (BACKHOE AND LOADER) | $31.05 | 15.75 | ENGI0066-024 collectively bargained (union) rate |
Official document: PA20260021 on SAM.gov.
PA20260023 rev 1 · Residential · Schuylkill
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOES | $10.00 | 0.38 | SUPA1995-008 DOL wage survey rate |
Official document: PA20260023 on SAM.gov.
PA20260025 rev 1 · Residential · Bradford, Sullivan, Susquehanna, Tioga, Wayne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GRADER | $7.25 | 0.00 | SUPA1993-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | $7.25 | 0.00 | SUPA1993-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $7.25 | 0.00 | SUPA1993-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $7.25 | 0.00 | SUPA1993-002 DOL wage survey rate |
Official document: PA20260025 on SAM.gov.
PA20260027 rev 1 · Residential · Bedford
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOES | $10.00 | 0.38 | SUPA1995-005 DOL wage survey rate |
Official document: PA20260027 on SAM.gov.
PA20260029 rev 1 · Residential · Cameron, Clearfield, Clinton, Elk, McKean, Potter and 1 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOE | $26.88 | 13.91 | ENGI0066-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (ROLLERS) | $11.50 | 0.00 | SUPA1999-005 DOL wage survey rate |
Official document: PA20260029 on SAM.gov.
PA20260030 rev 1 · Residential · Columbia, Lackawanna, Luzerne, Lycoming, Pike, Wyoming
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (PAVERS) | $15.11 | 9.26 | SUPA1999-011 DOL wage survey rate |
Official document: PA20260030 on SAM.gov.
PA20260031 rev 1 · Residential · Lawrence
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE | $31.05 | 15.75 | ENGI0066-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (ROLLERS) | $11.50 | 0.00 | SUPA1999-009 DOL wage survey rate |
Official document: PA20260031 on SAM.gov.
PA20260033 rev 1 · Residential · Greene
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOE | $31.05 | 15.75 | ENGI0066-018 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (ROLLERS) | $11.50 | 0.00 | SUPA1999-010 DOL wage survey rate |
Official document: PA20260033 on SAM.gov.
PA20260034 rev 1 · Residential · Fulton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOES | $10.00 | 0.38 | SUPA1995-009 DOL wage survey rate |
Official document: PA20260034 on SAM.gov.
PA20260035 rev 1 · Residential · Juniata, Mifflin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOES | $10.00 | 0.38 | SUPA1995-001 DOL wage survey rate |
Official document: PA20260035 on SAM.gov.
PA20260036 rev 1 · Residential · Snyder
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOES | $10.00 | 0.38 | SUPA1995-010 DOL wage survey rate |
Official document: PA20260036 on SAM.gov.
PA20260037 rev 2 · Residential · Monroe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, CORE DRI | $36.87 | 27.04 | ENGI0542-020 collectively bargained (union) rate |
Official document: PA20260037 on SAM.gov.
PA20260038 rev 1 · Residential · Armstrong, Clarion, Crawford, Forest, Indiana, Jefferson and 1 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (ROLLERS) | $11.50 | 0.00 | SUPA1999-002 DOL wage survey rate |
Official document: PA20260038 on SAM.gov.
PA20260039 rev 1 · Residential · Union
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOES | $10.00 | 0.38 | SUPA1995-003 DOL wage survey rate |
Official document: PA20260039 on SAM.gov.
PA20260040 rev 1 · Residential · Huntingdon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: BACKHOES | $10.00 | 0.38 | SUPA1995-002 DOL wage survey rate |
Official document: PA20260040 on SAM.gov.
PA20260041 rev 2 · Residential · Mercer
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: CLASS III BRAKEMAN, DECK HAND, HELICOPTER SIGNALMAN, OILER*, ELEVATOR (ALTERATIONS & REMODELING COMMERCIAL BUILDINGS), * OILERS ON TRUCK CRANES: LESS THA | $25.64 | 15.75 | ENGI0066-012 collectively bargained (union) rate |
Official document: PA20260041 on SAM.gov.
PA20260042 rev 2 · Residential · Westmoreland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: (BACKHOE) | $31.05 | 15.75 | ENGI0066-025 collectively bargained (union) rate |
Official document: PA20260042 on SAM.gov.
PA20260043 rev 3 · Building · Bedford
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, CRANE*, LOADER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 12.97 | SUPA2011-001 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-001 DOL wage survey rate |
Official document: PA20260043 on SAM.gov.
PA20260044 rev 2 · Building · Bradford
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.61 | 30.83 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | 29.30 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT)) | $41.88 | 30.03 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (OVER 20 FT)) | $44.61 | 30.83 | ENGI0542-025 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-002 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-002 DOL wage survey rate |
Official document: PA20260044 on SAM.gov.
PA20260045 rev 3 · Building · Cameron
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, CRANE*, LOADER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 12.97 | SUPA2011-003 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-003 DOL wage survey rate |
Official document: PA20260045 on SAM.gov.
PA20260046 rev 4 · Building · Clarion
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, DRILL RIG CAISSONS *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-2 | $36.87 | 21.32 | ENGI0066-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BULLDOZER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), FORKLIFT (LULL), MAN LIFT/OUTSIDE ELEVATOR | $36.87 | 21.32 | ENGI0066-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $32.25 | 21.32 | ENGI0066-029 collectively bargained (union) rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-004 DOL wage survey rate |
| OPERATOR: HIGHLIFT | $31.19 | 22.01 | SUPA2011-004 DOL wage survey rate |
Official document: PA20260046 on SAM.gov.
PA20260047 rev 3 · Building · Clearfield
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-030 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-030 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-030 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-030 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 12.97 | SUPA2011-005 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-005 DOL wage survey rate |
Official document: PA20260047 on SAM.gov.
PA20260048 rev 3 · Building · Clinton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-030 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-030 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-030 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-030 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 12.97 | SUPA2011-006 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-006 DOL wage survey rate |
Official document: PA20260048 on SAM.gov.
PA20260049 rev 5 · Building · Crawford
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-031 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-031 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE), DRILL RIG CAISSONS, BULLDOZER, FORKLIFT (LULL), MAN LIFT/OUTSIDE ELEVATOR | $36.87 | 21.32 | ENGI0066-031 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $32.25 | 21.32 | ENGI0066-031 collectively bargained (union) rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-007 DOL wage survey rate |
Official document: PA20260049 on SAM.gov.
PA20260050 rev 3 · Building · Elk
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-032 collectively bargained (union) rate |
| OPERATOR: ROLLER | $21.89 | 12.07 | SUPA2011-008 DOL wage survey rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 13.13 | SUPA2011-008 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-008 DOL wage survey rate |
Official document: PA20260050 on SAM.gov.
PA20260051 rev 4 · Building · Forest
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BULLDOZER, CRANE*, DRILL RIG CAISSONS, FORKLIFT (LULL), MAN LIFT/OUTSIDE ELEVATOR *A | $41.69 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, LOADER, ROLLER | $35.62 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT (RIDDEN OR SELF PROPELLED) | $35.62 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-009 DOL wage survey rate |
| OPERATOR: HIGHLIFT | $31.19 | 22.01 | SUPA2011-009 DOL wage survey rate |
Official document: PA20260051 on SAM.gov.
PA20260052 rev 3 · Building · Fulton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 12.97 | SUPA2011-010 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-010 DOL wage survey rate |
Official document: PA20260052 on SAM.gov.
PA20260053 rev 4 · Building · Greene
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BULLDOZER, CRANE*, DRILL RIG CAISSONS, FORKLIFT (LULL), MAN LIFT/OUTSIDE ELEVATOR *A | $41.69 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, LOADER, ROLLER | $35.62 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT (RIDDEN OR SELF PROPELLED) | $35.62 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-011 DOL wage survey rate |
| OPERATOR: HIGHLIFT | $31.19 | 22.01 | SUPA2011-011 DOL wage survey rate |
Official document: PA20260053 on SAM.gov.
PA20260054 rev 3 · Building · Huntingdon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 13.13 | SUPA2011-012 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-012 DOL wage survey rate |
Official document: PA20260054 on SAM.gov.
PA20260055 rev 4 · Building · Indiana
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BULLDOZER, CRANE*, DRILL RIG CAISSONS, MAN LIFT/OUTSI | $41.69 | 24.05 | ENGI0066-038 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $41.69 | 24.05 | ENGI0066-038 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | 24.05 | ENGI0066-038 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $35.62 | 24.05 | ENGI0066-038 collectively bargained (union) rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-013 DOL wage survey rate |
| OPERATOR: HIGHLIFT | $31.19 | 22.01 | SUPA2011-013 DOL wage survey rate |
Official document: PA20260055 on SAM.gov.
PA20260056 rev 3 · Building · Jefferson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 12.97 | SUPA2011-014 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-014 DOL wage survey rate |
Official document: PA20260056 on SAM.gov.
PA20260057 rev 2 · Building · Juniata
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.59 | 18.10 | ENGI0066-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | 30.03 | ENGI0542-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | 30.83 | ENGI0542-029 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-015 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.88 | 14.13 | SUPA2011-015 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-015 DOL wage survey rate |
| OPERATOR: OILER | $37.10 | 27.62 | SUPA2011-015 DOL wage survey rate |
Official document: PA20260057 on SAM.gov.
PA20260058 rev 4 · Building · Lawrence
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BULLDOZER, CRANE*, DRILL RIG CAISSONS, FORKLIFT (LULL), MAN LIFT/OUTSIDE ELEVATOR *A | $41.69 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, LOADER, ROLLER | $35.62 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: FORKLIFT (RIDDEN OR SELF PROPELLED) | $35.62 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | 24.05 | ENGI0066-033 collectively bargained (union) rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-016 DOL wage survey rate |
| OPERATOR: HIGHLIFT | $31.19 | 22.01 | SUPA2011-016 DOL wage survey rate |
Official document: PA20260058 on SAM.gov.
PA20260059 rev 3 · Building · McKean
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 12.97 | SUPA2011-017 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-017 DOL wage survey rate |
Official document: PA20260059 on SAM.gov.
PA20260060 rev 2 · Building · Mifflin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | 30.03 | ENGI0542-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | 30.83 | ENGI0542-029 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-018 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.88 | 14.13 | SUPA2011-018 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-018 DOL wage survey rate |
| OPERATOR: OILER | $37.10 | 27.62 | SUPA2011-018 DOL wage survey rate |
Official document: PA20260060 on SAM.gov.
PA20260061 rev 1 · Building · Northumberland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-031 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT.)) | $41.88 | 30.03 | ENGI0542-031 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, BACKHOE/EXCAVATOR/TRACKHOE, FORKLIFT (20 FT. AND OVER)) | $44.61 | 30.83 | ENGI0542-031 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-019 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-019 DOL wage survey rate |
| OPERATOR: OILER | $37.10 | 27.62 | SUPA2011-019 DOL wage survey rate |
Official document: PA20260061 on SAM.gov.
PA20260062 rev 3 · Building · Potter
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 12.97 | SUPA2011-020 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-020 DOL wage survey rate |
Official document: PA20260062 on SAM.gov.
PA20260063 rev 2 · Building · Schuylkill
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | 30.03 | ENGI0542-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | 30.83 | ENGI0542-029 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-021 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.13 | 16.81 | SUPA2011-021 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-021 DOL wage survey rate |
| OPERATOR: OILER | $37.10 | 27.62 | SUPA2011-021 DOL wage survey rate |
Official document: PA20260063 on SAM.gov.
PA20260064 rev 2 · Building · Snyder
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | 30.03 | ENGI0542-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | 30.83 | ENGI0542-029 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-022 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.88 | 14.13 | SUPA2011-022 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-022 DOL wage survey rate |
| OPERATOR: OILER | $37.10 | 27.62 | SUPA2011-022 DOL wage survey rate |
Official document: PA20260064 on SAM.gov.
PA20260065 rev 3 · Building · Somerset
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-034 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 12.97 | SUPA2011-023 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-023 DOL wage survey rate |
Official document: PA20260065 on SAM.gov.
PA20260066 rev 2 · Building · Sullivan
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.61 | 30.83 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | 29.30 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT)) | $41.88 | 30.03 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (OVER 20 FT)) | $44.61 | 30.83 | ENGI0542-025 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-024 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-024 DOL wage survey rate |
Official document: PA20260066 on SAM.gov.
PA20260067 rev 2 · Building · Susquehanna
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.61 | 30.83 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | 29.30 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT)) | $41.88 | 30.03 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (OVER 20 FT)) | $44.61 | 30.83 | ENGI0542-025 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-025 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-025 DOL wage survey rate |
Official document: PA20260067 on SAM.gov.
PA20260068 rev 2 · Building · Tioga
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.61 | 30.83 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | 29.30 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT)) | $41.88 | 30.03 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (OVER 20 FT)) | $44.61 | 30.83 | ENGI0542-025 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-026 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-026 DOL wage survey rate |
Official document: PA20260068 on SAM.gov.
PA20260069 rev 3 · Building · Union
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | 30.03 | ENGI0542-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | 30.83 | ENGI0542-029 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-027 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.88 | 14.13 | SUPA2011-027 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-027 DOL wage survey rate |
| OPERATOR: OILER | $37.10 | 27.62 | SUPA2011-027 DOL wage survey rate |
Official document: PA20260069 on SAM.gov.
PA20260070 rev 4 · Building · Venango
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE* *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 B | $36.87 | 21.32 | ENGI0066-036 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-036 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BULLDOZER, DRILL RIG CAISSONS, FORKLIFT (LULL), MAN LIFT/OUTSIDE ELEVATOR | $36.87 | 21.32 | ENGI0066-036 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $32.25 | 21.32 | ENGI0066-036 collectively bargained (union) rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-028 DOL wage survey rate |
| OPERATOR: HIGHLIFT | $31.19 | 22.01 | SUPA2011-028 DOL wage survey rate |
Official document: PA20260070 on SAM.gov.
PA20260071 rev 4 · Building · Warren
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: LOADER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, CRANE*, DRILL RIG CAISSONS, FORKLI | $36.87 | 21.32 | ENGI0066-037 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-037 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $32.25 | 21.32 | ENGI0066-037 collectively bargained (union) rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-029 DOL wage survey rate |
| OPERATOR: HIGHLIFT | $31.19 | 22.01 | SUPA2011-029 DOL wage survey rate |
Official document: PA20260071 on SAM.gov.
PA20260072 rev 2 · Building · Wayne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | 21.32 | ENGI0066-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $44.61 | 30.83 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | 29.30 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (FORKLIFT (UNDER 20 FT)) | $41.88 | 30.03 | ENGI0542-025 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BULLDOZER, LOADER, FORKLIFT (OVER 20 FT)) | $44.61 | 30.83 | ENGI0542-025 collectively bargained (union) rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.96 | 13.93 | SUPA2011-030 DOL wage survey rate |
| OPERATOR: MECHANIC | $36.53 | 22.01 | SUPA2011-030 DOL wage survey rate |
Official document: PA20260072 on SAM.gov.
PA20260073 rev 2 · Building · Adams
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (PUMP) | $32.25 | 21.32 | ENGI0066-044 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $36.87 | 21.32 | ENGI0066-044 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | 29.30 | ENGI0542-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS), FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | 30.83 | ENGI0542-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | 30.03 | ENGI0542-032 collectively bargained (union) rate |
| OPERATOR: ROLLER | $30.39 | 13.72 | SUPA2011-031 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.39 | 15.05 | SUPA2011-031 DOL wage survey rate |
| OPERATOR: LOADER | $27.05 | 14.52 | SUPA2011-031 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $32.51 | 17.98 | SUPA2011-031 DOL wage survey rate |
| OPERATOR: GRADALL | $32.70 | 18.43 | SUPA2011-031 DOL wage survey rate |
| OPERATOR: DRILL | $25.58 | 17.07 | SUPA2011-031 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.14 | 13.55 | SUPA2011-031 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.73 | 7.50 | SUPA2011-031 DOL wage survey rate |
| OPERATOR: BULLDOZER | $37.85 | 22.72 | SUPA2011-031 DOL wage survey rate |
Official document: PA20260073 on SAM.gov.
PA20260074 rev 6 · Building · Armstrong
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: COMPRESSOR, CONCRETE PUMP, FORKLIFT (RIDDEN OR SELF-PROPELLED), HIGHLIFT, HOIST, ROLLER, TUGBOAT OPERATOR | $35.62 | 24.05 | ENGI0066-050 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $41.69 | 24.05 | ENGI0066-050 collectively bargained (union) rate |
| OPERATOR: BROOM/SWEEPER | $24.83 | 14.13 | SUPA2011-032 DOL wage survey rate |
Official document: PA20260074 on SAM.gov.
PA20260075 rev 5 · Building · Beaver
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, COMPACTOR, CRANE*, DRILL RIG CAISSONS, DRILL, GRADALL, GRADER/BLADE, MAN LIFT/OUTSID | $41.69 | 24.05 | ENGI0066-040 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER, COMPRESSOR, CONCRETE PUMP, HIGHLIFT, HOIST, PUMP, ROLLER, TUGBOAT, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $35.62 | 24.05 | ENGI0066-040 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $41.69 | 24.05 | ENGI0066-040 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | 24.05 | ENGI0066-040 collectively bargained (union) rate |
Official document: PA20260075 on SAM.gov.
PA20260076 rev 2 · Building · Berks
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.59 | 18.10 | ENGI0066-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE, GRADALL, BULLDOZER, BOBCAT/SKID STEER/ SKID LOADER, GRADER/BLADE, LOADER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $40.57 | 28.15 | ENGI0542-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (PUMP) | $34.18 | 26.26 | ENGI0542-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER) | $32.86 | 25.86 | ENGI0542-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS), FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | $38.05 | 27.39 | ENGI0542-033 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $35.32 | 26.59 | ENGI0542-033 collectively bargained (union) rate |
| OPERATOR: DRILL | $28.55 | 15.78 | SUPA2011-034 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $34.34 | 15.47 | SUPA2011-034 DOL wage survey rate |
Official document: PA20260076 on SAM.gov.
PA20260077 rev 2 · Building · Blair
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP | $29.70 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE* LOADER, MECHANIC) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-2 | $36.87 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 13.13 | SUPA2011-035 DOL wage survey rate |
Official document: PA20260077 on SAM.gov.
PA20260078 rev 1 · Building · Bucks
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $28.37 | 15.66 | ENGI0066-047 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $50.18 | 33.22 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (PUMP) | $48.16 | 32.62 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER, ARTICULATING TRUCK OPERATOR) | $47.17 | 32.33 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS)) | $54.27 | 34.42 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (ALL TYPES)) | $50.18 | 33.22 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (CRANE, GRADALL, BULLDOZER, BOBCAT/SKID STEER/ SKID LOADER, GRADER/BLADE, LOADER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BACKHOE/ EXCAVATOR/ TRACKHOE, B | $54.27 | 34.42 | ENGI0542-034 collectively bargained (union) rate |
| OPERATOR: DRILL | $28.55 | 15.78 | SUPA2011-036 DOL wage survey rate |
Official document: PA20260078 on SAM.gov.
PA20260079 rev 6 · Building · Butler
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, COMPACTOR, CRANE*, DRILL RIG CAISSONS, DRILL, GRADALL, GRADER/BLADE, MAN LIFT/OUTSID | $41.69 | 24.05 | ENGI0066-040 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER, COMPRESSOR, CONCRETE PUMP, HIGHLIFT, HOIST, PUMP, ROLLER, TUGBOAT, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $35.62 | 24.05 | ENGI0066-040 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: LOADER | $41.69 | 24.05 | ENGI0066-040 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | 24.05 | ENGI0066-040 collectively bargained (union) rate |
Official document: PA20260079 on SAM.gov.
PA20260080 rev 4 · Building · Cambria
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE* LOADER, MECHANIC) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-2 | $36.87 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP | $29.70 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 13.13 | SUPA2011-038 DOL wage survey rate |
Official document: PA20260080 on SAM.gov.
PA20260081 rev 3 · Building · Carbon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (PUMP) | $28.36 | 18.10 | ENGI0066-046 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $31.09 | 22.35 | ENGI0542-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $37.49 | 24.23 | ENGI0542-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER) | $29.77 | 21.95 | ENGI0542-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | $32.23 | 22.68 | ENGI0542-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (COMPRESSOR) | $31.09 | 22.35 | ENGI0542-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID/STEER/SKID LOADER,BOOM, BULLDOZER, CONCRETE PUMP, HOIST (WITH TWO TOWERS), MECHANIC, ROLLER (HIGH GRADE FINISHING) | $34.96 | 23.48 | ENGI0542-035 collectively bargained (union) rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $33.01 | 18.37 | SUPA2011-039 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $32.51 | 17.98 | SUPA2011-039 DOL wage survey rate |
| OPERATOR: GRADALL | $32.70 | 18.43 | SUPA2011-039 DOL wage survey rate |
| OPERATOR: DRILL | $28.55 | 15.78 | SUPA2011-039 DOL wage survey rate |
Official document: PA20260081 on SAM.gov.
PA20260082 rev 2 · Building · Centre
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: ROLLER | $32.25 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: OILER | $29.70 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: HOIST, PUMP | $29.70 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE* LOADER, MECHANIC) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-2 | $36.87 | 21.32 | ENGI0066-041 collectively bargained (union) rate |
| OPERATOR: FORKLIFT, ALL TYPES | $23.69 | 13.13 | SUPA2011-040 DOL wage survey rate |
Official document: PA20260082 on SAM.gov.
PA20260083 rev 2 · Building · Chester
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $28.37 | 15.66 | ENGI0066-047 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $50.18 | 33.22 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (PUMP) | $48.16 | 32.62 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER, ARTICULATING TRUCK OPERATOR) | $47.17 | 32.33 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS)) | $54.27 | 34.42 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (ALL TYPES)) | $50.18 | 33.22 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (CRANE, GRADALL, BULLDOZER, BOBCAT/SKID STEER/ SKID LOADER, GRADER/BLADE, LOADER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BACKHOE/ EXCAVATOR/ TRACKHOE, B | $54.27 | 34.42 | ENGI0542-034 collectively bargained (union) rate |
| OPERATOR: DRILL | $28.55 | 15.78 | SUPA2011-041 DOL wage survey rate |
Official document: PA20260083 on SAM.gov.
PA20260084 rev 2 · Building · Columbia
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (PUMP) | $28.36 | 18.10 | ENGI0066-046 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (6) OILER | $39.42 | 29.30 | ENGI0542-036 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (4) PUMP | $40.74 | 29.70 | ENGI0542-036 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (3) HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT) | $41.88 | 30.03 | ENGI0542-036 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (2) BOBCAT/ SKID/ STEER/ SKID LOADER, BULLDOZER, HOIST (WITH TWO TOWERS), MECHANIC, LOADER, FORKLIFT (20 FT. AND OVER) | $44.61 | 30.83 | ENGI0542-036 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (1A) CRANE | $47.14 | 31.58 | ENGI0542-036 collectively bargained (union) rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $33.01 | 18.37 | SUPA2011-042 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $32.51 | 17.98 | SUPA2011-042 DOL wage survey rate |
| OPERATOR: GRADALL | $32.70 | 18.43 | SUPA2011-042 DOL wage survey rate |
| OPERATOR: DRILL | $28.55 | 15.78 | SUPA2011-042 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $30.73 | 15.10 | SUPA2011-042 DOL wage survey rate |
Official document: PA20260084 on SAM.gov.
PA20260085 rev 2 · Building · Cumberland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (PUMP) | $32.25 | 21.32 | ENGI0066-044 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $36.87 | 21.32 | ENGI0066-044 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | 29.30 | ENGI0542-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS), FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | 30.83 | ENGI0542-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | 30.03 | ENGI0542-032 collectively bargained (union) rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.39 | 15.05 | SUPA2011-043 DOL wage survey rate |
| OPERATOR: LOADER | $27.05 | 14.52 | SUPA2011-043 DOL wage survey rate |
| OPERATOR: HYDRO MULCH | $26.41 | 16.58 | SUPA2011-043 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $32.51 | 17.98 | SUPA2011-043 DOL wage survey rate |
| OPERATOR: GRADALL | $32.70 | 18.43 | SUPA2011-043 DOL wage survey rate |
| OPERATOR: DRILL | $27.43 | 16.94 | SUPA2011-043 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.41 | 16.58 | SUPA2011-043 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.16 | 16.15 | SUPA2011-043 DOL wage survey rate |
| OPERATOR: BULLDOZER | $37.85 | 22.72 | SUPA2011-043 DOL wage survey rate |
Official document: PA20260085 on SAM.gov.
PA20260086 rev 2 · Building · Dauphin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (PUMP) | $32.25 | 21.32 | ENGI0066-044 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $36.87 | 21.32 | ENGI0066-044 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: CRANE | $47.14 | 31.58 | ENGI0542-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER) | $39.42 | 29.30 | ENGI0542-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS), FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | 30.83 | ENGI0542-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | 30.03 | ENGI0542-032 collectively bargained (union) rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.39 | 15.05 | SUPA2011-044 DOL wage survey rate |
| OPERATOR: LOADER | $27.05 | 14.52 | SUPA2011-044 DOL wage survey rate |
| OPERATOR: HYDRO MULCH | $26.41 | 16.58 | SUPA2011-044 DOL wage survey rate |
| OPERATOR: GRADER/BLADE | $32.51 | 17.98 | SUPA2011-044 DOL wage survey rate |
| OPERATOR: GRADALL | $32.70 | 18.43 | SUPA2011-044 DOL wage survey rate |
| OPERATOR: DRILL | $27.43 | 16.94 | SUPA2011-044 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $26.41 | 16.58 | SUPA2011-044 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $39.32 | 19.52 | SUPA2011-044 DOL wage survey rate |
| OPERATOR: BULLDOZER | $37.85 | 22.72 | SUPA2011-044 DOL wage survey rate |
Official document: PA20260086 on SAM.gov.
PA20260087 rev 1 · Building · Delaware
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | $28.37 | 15.66 | ENGI0066-047 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: ROLLER | $50.18 | 33.22 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (PUMP) | $48.16 | 32.62 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (OILER, ARTICULATING TRUCK OPERATOR) | $47.17 | 32.33 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (WITH TWO TOWERS)) | $54.27 | 34.42 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (ALL TYPES)) | $50.18 | 33.22 | ENGI0542-034 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (CRANE, GRADALL, BULLDOZER, BOBCAT/SKID STEER/ SKID LOADER, GRADER/BLADE, LOADER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BACKHOE/ EXCAVATOR/ TRACKHOE, B | $54.27 | 34.42 | ENGI0542-034 collectively bargained (union) rate |
| OPERATOR: DRILL | $28.55 | 15.78 | SUPA2011-045 DOL wage survey rate |
Official document: PA20260087 on SAM.gov.
PA20260088 rev 6 · Building · Erie
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER,CRANE*, DRILL RIG CAISSONS, HIGHLIFT, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) *ADD TO CRANE RAT | $34.10 | 22.07 | ENGI0066-043 collectively bargained (union) rate |
Official document: PA20260088 on SAM.gov.
Showing the first 400 of 601 published heavy equipment operator rates. The rest are on the individual determination pages linked above, each of which carries the full official text.
Where to go next
Heavy Equipment Operator rates in every state · Pennsylvania prevailing wage and state law · Pennsylvania determinations by county · pay calculator
Other trades in Pennsylvania
Electrician · Plumber · Pipefitter · HVAC Mechanic · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Plasterer · Glazier · Insulator (Heat & Frost) · Millwright · Boilermaker · Sprinkler Fitter · Piledriver · Tile Setter · Tile Finisher · Floor Layer · Line Constructor / Lineman