Line Constructor / Lineman prevailing wage rates in California
Federal Davis-Bacon rates published in 14 active determinations, 2026
- Active federal Davis-Bacon determinations for California publish 61 line constructor / lineman classification rates, across 14 determinations covering 57 counties.
- Those published base rates run from $13.93 to $70.16 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting line constructor / lineman rates in California: .
This page collects every classification in California's active federal determinations that is a form of line constructor / lineman work (overhead and underground electrical distribution lines) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
CA20260001 rev 3 · Building, Heavy, Highway, Residential · San Diego
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (4) POWDERMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $51.87 | 18.79 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260001 on SAM.gov.
CA20260002 rev 4 · Building, Heavy, Highway · Imperial
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260002 on SAM.gov.
CA20260004 rev 4 · Heavy, Highway · Del Norte, Humboldt, Lake, Mendocino
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER (HUMBOLDT, LAKE AND MENDOCINO COUNTIES) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS D | $70.16 | 24.71 | ELEC1245-002 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-002 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN (HUMBOLDT, LAKE AND MENDOCINO COUNTIES) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIV | $40.76 | 21.76 | ELEC1245-002 collectively bargained (union) rate |
| LINE CONSTRUCTION: (4) POWDERMAN (HUMBOLDT, LAKE AND MENDOCINO COUNTIES) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIV | $40.76 | 21.76 | ELEC1245-002 collectively bargained (union) rate |
Official document: CA20260004 on SAM.gov.
CA20260005 rev 2 · Building · Del Norte, Humboldt, Lake, Mendocino
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION, LINE TECHNICIAN (LAKE AND MENDICINO COUNTIES) | $22.85 | 5.43 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, LINE TECHNICIAN (HUMBOLDT COUNTY) | $17.41 | 6.03 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR (LAKE AND MENDICINO COUNTIES) | $18.22 | 5.29 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR (HUMBOLDT COUNTY) | $15.67 | 5.96 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, GROUP 7- Ground person. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROS AND YREKA, CALIFORNIA. ZONE 2: 3-20 MILES RADIU | $14.07 | 3.74 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, GROUP 5- Head ground person, powder, jackhammer operator. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROS AND YREKA, CA | $16.08 | 3.81 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, GROUP 3-Tree trimmer. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROS AND YREKA, CALIFORNIA. ZONE 2: 3-20 MILES RADIUS. | $15.35 | 3.79 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, GROUP 2-Line technician, pole sprayer, heavy line equipment operator, certified line welder. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHI | $18.65 | 3.90 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, GROUP 1- Cable splicer, lead pole sprayer. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTUROS AND YREKA, CALIFORNIA. ZONE | $20.63 | 3.97 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, GROUND PERSON (LAKE AND MENDICINO COUNTIES) | $18.28 | 5.29 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, GROUND PERSON (HUMBOLDT COUNTY) | $13.93 | 5.89 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, CABLE SPLICER (LAKE AND MENDICINO COUNTIES) | $25.14 | 5.49 | SUCA1986-001 DOL wage survey rate |
| LINE CONSTRUCTION, CABLE SPLICER (HUMBOLDT COUNTY) | $18.80 | 6.08 | SUCA1986-001 DOL wage survey rate |
Official document: CA20260005 on SAM.gov.
CA20260007 rev 5 · Building, Heavy, Highway · Alpine, Amador, Butte, Colusa, El Dorado, Glenn and 18 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) CABLE SPLICER (DEL NORTE, MODOC & SISKIYOU COUNTIES) | $67.80 | 25.20 | ELEC0659-008 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) LINEMAN, POLE SPRAYER, HEAVY LINE EQUIPMENT MAN (DEL NORTE, MODOC & SISKIYOU COUNTIES) | $60.54 | 24.87 | ELEC0659-008 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) TREE TRIMMER (DEL NORTE, MODOC & SISKIYOU COUNTIES) | $37.84 | 16.00 | ELEC0659-008 collectively bargained (union) rate |
| LINE CONSTRUCTION: (4) LINE EQUIPMENT MAN (DEL NORTE, MODOC & SISKIYOU COUNTIES) | $53.82 | 21.82 | ELEC0659-008 collectively bargained (union) rate |
| LINE CONSTRUCTION: (5) POWDERMEN, JACKHAMMERMEN (DEL NORTE, MODOC & SISKIYOU COUNTIES) | $40.37 | 16.12 | ELEC0659-008 collectively bargained (union) rate |
| LINE CONSTRUCTION: (6) GROUNDMAN (DEL NORTE, MODOC & SISKIYOU COUNTIES) | $33.37 | 15.80 | ELEC0659-008 collectively bargained (union) rate |
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THAN | $70.16 | 24.71 | ELEC1245-004 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTI | $53.30 | 22.26 | ELEC1245-004 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHR | $40.76 | 21.76 | ELEC1245-004 collectively bargained (union) rate |
| LINE CONSTRUCTION: (4) POWDERMAN (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHR | $51.87 | 18.79 | ELEC1245-004 collectively bargained (union) rate |
Official document: CA20260007 on SAM.gov.
CA20260012 rev 5 · Building, Heavy, Highway · San Luis Obispo
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260012 on SAM.gov.
CA20260014 rev 6 · Building, Heavy, Highway · Santa Barbara
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260014 on SAM.gov.
CA20260018 rev 7 · Building, Heavy, Highway · Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera and 11 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THAN | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHR | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260018 on SAM.gov.
CA20260020 rev 5 · Building, Heavy, Highway · Inyo, Kern, Mono
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260020 on SAM.gov.
CA20260021 rev 2 · Heavy, Highway · Tulare
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260021 on SAM.gov.
CA20260022 rev 5 · Building, Heavy, Highway · Los Angeles
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260022 on SAM.gov.
CA20260024 rev 4 · Building, Heavy, Highway · Orange
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260024 on SAM.gov.
CA20260025 rev 4 · Building, Heavy, Highway · Riverside
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260025 on SAM.gov.
CA20260026 rev 4 · Building, Heavy, Highway · San Bernardino
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANK | $70.16 | 24.71 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUT | $53.30 | 22.26 | ELEC1245-001 collectively bargained (union) rate |
| LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRI | $40.76 | 21.76 | ELEC1245-001 collectively bargained (union) rate |
Official document: CA20260026 on SAM.gov.
Where to go next
Line Constructor / Lineman rates in every state · California prevailing wage and state law · California determinations by county · pay calculator
Other trades in California
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Plasterer · Glazier · Insulator (Heat & Frost) · Boilermaker · Sprinkler Fitter · Piledriver · Tile Setter · Tile Finisher · Floor Layer