Prevailing Wage Index
HomeTradesConstruction Laborer › California

Construction Laborer prevailing wage rates in California

Federal Davis-Bacon rates published in 28 active determinations, 2026

The official source: binding Davis-Bacon and Service Contract Act wage determinations are published by the U.S. Department of Labor at SAM.gov Wage Determinations. This site indexes them and links every determination to its official document - the determination incorporated into a contract governs.

This page collects every classification in California's active federal determinations that is a form of construction laborer work (general and specialty construction labor) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.

Published rates by determination

CA20260001 rev 3 · Building, Heavy, Highway, Residential · San Diego

Classification as publishedBase rateFringesRate schedule
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 5 BLASTERS POWDERMAN-ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL PWDER AND EXPLOSIVES OF WHATEVER TYPE, R$48.1625.09LABO0089-001
collectively bargained (union) rate
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 4 ASPHALT RAKER, LUTERMAN, IRONER, APSHALT DUMPMAN AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WAL$48.6425.09LABO0089-001
collectively bargained (union) rate
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 3 BUGGYMOBILE; CONCRETE CUTTING TORCH; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2 1/2 FEET$47.1625.09LABO0089-001
collectively bargained (union) rate
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YARD OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLE$46.3025.09LABO0089-001
collectively bargained (union) rate
LABORER, BUILDING AND ALL OTHER RESIDENTIAL CONSTRUCTION: GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGHT STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION$45.5425.09LABO0089-001
collectively bargained (union) rate
LABORER (RESIDENTIAL CONSTRUCTION): (2) CLEANUP, LANDSCAPE, FENCING (CHAIN LINK & WOOD) RESIDENTIAL DEFINITION: WOOD OR METAL FRAME CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTM$43.4423.42LABO0089-001
collectively bargained (union) rate
LABORER (RESIDENTIAL CONSTRUCTION) (1) LABORER RESIDENTIAL DEFINITION: WOOD OR METAL FRAME CONSTRUCTION OF SINGLE FAMILY RESIDENCES, APARTMENTS AND CONDOMINUMS - EXCLUDING (A) PROJ$42.1523.42LABO0089-001
collectively bargained (union) rate
LABORER: MASON TENDER$42.6022.13LABO0089-002
collectively bargained (union) rate
LABORERS: GROUP 5 (HEAVY AND HIGHWAY CONSTRUCTION) BLASTERS POWDERMAN-ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF M$50.1425.09LABO0089-004
collectively bargained (union) rate
LABORERS: GROUP 4 (HEAVY AND HIGHWAY CONSTRUCTION) ANY WORKER EXPOSED TO RAW SEWAGE. ASPHALT RAKER, LUTEMAN, ASPHALT DUMPMAN, ASPHALT SPREADER BOXES, CONCRETE CORE CUTTER, CONCRETE$49.2825.09LABO0089-004
collectively bargained (union) rate
LABORERS: GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT, INSTALLATION OF ALL FRABRICS; BUGGY MOBILE MAN, BUSHING HAMMER; COMPACTOR (ALL TYPES), CONCRETE CURER - IMPERVIOUS MEMBR$47.7625.09LABO0089-004
collectively bargained (union) rate
LABORERS: GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT ABATEMENT; BUGGYMOBILE; CEMENT DUMPER (ON 1 YD. OR LARGER MIXERS AND HANDLING BULK CEMENT); CONCRETE CURER, IMPERVIOUS ME$47.2025.09LABO0089-004
collectively bargained (union) rate
LABORERS: GROUP 1 (HEAVY AND HIGHWAY CONSTRUCTION) LABORER: GENERAL OR CONSTRUCTION LABORER, LANDSCAPE LABORER. ASPHALT RUBBER MATERIAL LOADER. BORING MACHINE TENDER (OUTSIDE), CAR$46.6625.09LABO0089-004
collectively bargained (union) rate
LABORERS: STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC CO$54.3523.97LABO1184-001
collectively bargained (union) rate
LABORERS: STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, GU$52.6123.97LABO1184-001
collectively bargained (union) rate
LABORERS: STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDIN$50.6023.97LABO1184-001
collectively bargained (union) rate
LABORERS: STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND P$49.3023.97LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.1120.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.9420.86LABO1184-001
collectively bargained (union) rate
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, M$48.7225.97LABO1414-003
collectively bargained (union) rate
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FOR$46.1725.97LABO1414-003
collectively bargained (union) rate

Official document: CA20260001 on SAM.gov.

CA20260002 rev 4 · Building, Heavy, Highway · Imperial

Classification as publishedBase rateFringesRate schedule
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.9420.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.1120.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND $49.3023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDI$50.6023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, G$52.6123.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC C$54.3523.97LABO1184-001
collectively bargained (union) rate
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A W$46.4825.95LABO1184-002
collectively bargained (union) rate
LABORER GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, TH$47.0325.95LABO1184-002
collectively bargained (union) rate
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PI$47.5825.95LABO1184-002
collectively bargained (union) rate
LABORER GROUP 4 ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER$49.1325.95LABO1184-002
collectively bargained (union) rate
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACIN$49.4825.95LABO1184-002
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 1 Batch plant laborer; Changehouse person; Dump person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials hand$53.6025.74LABO1184-002
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 2 Chucktender, cabletender; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic tools (except driller); Bull gang mucker, track pers$53.9225.74LABO1184-002
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 3 Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout pump person; Jackleg miner; J$54.3825.74LABO1184-002
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 4 Diamond driller; Sandblaster; Shaft and raise work$55.0725.74LABO1184-002
collectively bargained (union) rate
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FOR$46.1725.97LABO1414-003
collectively bargained (union) rate
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, M$48.7225.97LABO1414-003
collectively bargained (union) rate

Official document: CA20260002 on SAM.gov.

CA20260004 rev 4 · Heavy, Highway · Del Norte, Humboldt, Lake, Mendocino

Classification as publishedBase rateFringesRate schedule
LABORER (TRAFFIC CONTROL/LANE CLOSURE): ESCORT DRIVER, FLAG PERSON (DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES)$36.2627.30LABO0324-003
collectively bargained (union) rate
LABORER (TRAFFIC CONTROL/LANE CLOSURE): TRAFFIC CONTROL PERSON I: LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (DEL NORTE, HUMBOLDT, LAKE, AND$34.0627.30LABO0324-003
collectively bargained (union) rate
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; MASONRY AND PLASTERER TENDER;$36.2027.30LABO0324-005
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYE$35.5027.30LABO0324-005
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHA$35.7227.30LABO0324-005
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR M$36.0527.30LABO0324-005
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER $35.3527.30LABO0324-005
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAI$28.9427.30LABO0324-005
collectively bargained (union) rate

Official document: CA20260004 on SAM.gov.

CA20260005 rev 2 · Building · Del Norte, Humboldt, Lake, Mendocino

Classification as publishedBase rateFringesRate schedule
LABORERS:, GROUP 1 Asphalt ironer and raker; Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Chainsaw, Faller, Logloader and Bucker; Compac$16.615.96SUCA1986-001
DOL wage survey rate
LABORERS: GROUP 4 Brick cleaner (jobsite only); Lumber cleaner (jobsite only); (not applicable to """"form stripping"""", cleaning and oiling and moving to the next point of erecti$10.055.96SUCA1986-001
DOL wage survey rate
LABORERS: GROUP 3 All clean-up work of debris, grounds and buildings including but not limited to street cleaners; Cleaning and washing windows; Construction laborer including brid$16.365.96SUCA1986-001
DOL wage survey rate
LABORERS: GROUP 2 Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and digger (clearing work); Concrete bucket dumper and chute; Concrete chipping an$16.465.96SUCA1986-001
DOL wage survey rate
LABORERS: GROUP 1-F Wire winding machine in connection with guniting or shotcrete - aligner. Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active la$17.195.96SUCA1986-001
DOL wage survey rate
LABORERS: GROUP 1-E Laborer on general construction work on or in Bell Hole footings and shaft. Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active$17.165.96SUCA1986-001
DOL wage survey rate
LABORERS: GROUP 1-D Repair track and road beds (cut and cover work of subway after the temporary cover has been placed). Sewer cleaner receives an additional $4.00 per day, $5.00 p$16.865.96SUCA1986-001
DOL wage survey rate
LABORERS: GROUP 1-C Burning and welding in connection with laborers' work. Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter sewer$16.665.96SUCA1986-001
DOL wage survey rate
LABORERS: GROUP 1-A Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Diamond driller; Wagon driller; Mechanical drillers$16.835.96SUCA1986-001
DOL wage survey rate
LABORER: GUNITE GROUP 3 General laborer$17.365.96SUCA1986-001
DOL wage survey rate
LABORER: GUNITE GROUP 2 Rebound$16.485.96SUCA1986-001
DOL wage survey rate
LABORER: GUNITE GROUP 1 Nozzle operator (including gun, pot); Ground$17.075.96SUCA1986-001
DOL wage survey rate
LABORER: GROUP 3 General laborer (includes all clean-up work, loading lumber, loading and burning of debris) WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES$16.365.96SUCA1986-001
DOL wage survey rate
LABORER: GROUP 2 Semi-skilled wrecker (salvaging of other building materials) WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES$16.465.96SUCA1986-001
DOL wage survey rate
LABORER: GROUP 1 Skilled wrecker (removing and salvaging of sash, windows, doors, plumbing and electric fixtures) WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES$16.615.96SUCA1986-001
DOL wage survey rate

Official document: CA20260005 on SAM.gov.

CA20260007 rev 5 · Building, Heavy, Highway · Alpine, Amador, Butte, Colusa, El Dorado, Glenn and 18 more

Classification as publishedBase rateFringesRate schedule
LABORER, ASBESTOS/MOLD/LEAD LABORER: MARIN AND NAPA COUNTIES$37.7529.69LABO0067-003
collectively bargained (union) rate
LABORER, ASBESTOS/MOLD/LEAD LABORER: REMAINING COUNTIES$36.7529.69LABO0067-003
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (AREA A: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES).$ 37.26 27.32 LABORER, TRAFFIC$36.2627.32LABO0067-005
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I (AREA A: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES).$ 37.56 27.32 LABORER, TRAFFIC C$36.5627.32LABO0067-005
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II (AREA A: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES).$ 35.06 27.32 LABORER, TRAFFIC $34.0627.32LABO0067-005
collectively bargained (union) rate
LABORER: MASON TENDER-BRICK (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, $36.2925.55LABO0185-002
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - CONSTRUCTION SPECIALIST GROUP: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM $36.2027.30LABO0185-006
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER$35.5027.30LABO0185-006
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHAN$35.7227.30LABO0185-006
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MO$36.0527.30LABO0185-006
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER A$35.3527.30LABO0185-006
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL$35.2527.30LABO0185-006
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 4: FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRIC$28.9427.30LABO0185-006
collectively bargained (union) rate
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - ESTABLISHED WARRANTY PERIOD. (AREA B: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMA$28.9427.30LABO0185-006
collectively bargained (union) rate
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - NEW CONSTRUCTION (AREA B: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENT$35.2527.30LABO0185-006
collectively bargained (union) rate
LABORER: TRAFFIC CONTROL/LANE CLOSURE - ESCORT DRIVER, FLAG PERSON (MARIN COUNTY)$37.2627.30LABO0261-002
collectively bargained (union) rate
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON I - LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (MARIN COUNTY)$37.5627.30LABO0261-002
collectively bargained (union) rate
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON II - INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (MARIN COUNTY)$35.0627.30LABO0261-002
collectively bargained (union) rate
LABORER: MASON TENDER-BRICK (MARIN COUNTY)$37.5425.55LABO0261-007
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - CONSTRUCTION SPECIALIST GROUP: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM $37.2027.30LABO0261-010
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER$36.5027.30LABO0261-010
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHAN$36.7227.30LABO0261-010
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MO$37.0527.30LABO0261-010
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER A$36.3527.30LABO0261-010
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL$36.2527.30LABO0261-010
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 4: FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRIC$29.9427.30LABO0261-010
collectively bargained (union) rate
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - ESTABLISHED WARRANTY PERIOD. (AREA A: MARIN COUNTY)$29.9427.30LABO0261-010
collectively bargained (union) rate
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - NEW CONSTRUCTION (AREA A: MARIN COUNTY)$36.2527.30LABO0261-010
collectively bargained (union) rate
LABORER: TRAFFIC CONTROL/LANE CLOSURE - ESCORT DRIVER, FLAG PERSON (NAPA, SOLANO, AND SONOMA COUNTIES)$36.2627.30LABO0324-004
collectively bargained (union) rate
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON I - LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (NAPA, SOLANO, AND SONOMA COUN$36.5627.30LABO0324-004
collectively bargained (union) rate
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON II - INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (NAPA, SOLANO, A$34.0627.30LABO0324-004
collectively bargained (union) rate
LABORER: MASON TENDER-BRICK (SOLANO AND SONOMA COUNTIES)$36.8426.24LABO0324-010
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - CONSTRUCTION SPECIALIST GROUP: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM $36.2027.30LABO0324-013
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER$35.5027.30LABO0324-013
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHAN$35.7227.30LABO0324-013
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MO$36.0527.30LABO0324-013
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER A$35.3527.30LABO0324-013
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL$35.2527.30LABO0324-013
collectively bargained (union) rate
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 4: FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRIC$28.9427.30LABO0324-013
collectively bargained (union) rate
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - ESTABLISHED WARRANTY PERIOD. (AREA B: NAPA, SOLANO, AND SONOMA COUNTIES)$28.9427.30LABO0324-013
collectively bargained (union) rate
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - NEW CONSTRUCTION (AREA B: NAPA, SOLANO, AND SONOMA COUNTIES)$35.2527.30LABO0324-013
collectively bargained (union) rate

Official document: CA20260007 on SAM.gov.

CA20260008 rev 1 · Residential · Butte

Classification as publishedBase rateFringesRate schedule
LABORER$7.250.00SUCA1988-001
DOL wage survey rate

Official document: CA20260008 on SAM.gov.

CA20260009 rev 1 · Residential · Fresno, Kern, Madera, Merced, San Joaquin, Stanislaus and 1 more

Classification as publishedBase rateFringesRate schedule
LABORER, GENERAL$7.250.00SUCA2001-001
DOL wage survey rate

Official document: CA20260009 on SAM.gov.

CA20260011 rev 1 · Residential · Kings

Classification as publishedBase rateFringesRate schedule
LABORER$7.250.00SUCA1982-003
DOL wage survey rate

Official document: CA20260011 on SAM.gov.

CA20260012 rev 5 · Building, Heavy, Highway · San Luis Obispo

Classification as publishedBase rateFringesRate schedule
LABORER GROUP 1: CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A $46.4825.95LABO0220-001
collectively bargained (union) rate
LABORER GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, T$47.0325.95LABO0220-001
collectively bargained (union) rate
LABORER GROUP 3: BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER P$47.5825.95LABO0220-001
collectively bargained (union) rate
LABORER GROUP 4: ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDE$49.1325.95LABO0220-001
collectively bargained (union) rate
LABORER GROUP 5: BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACI$49.4825.95LABO0220-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK$55.0725.74LABO0220-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON (OUTSIDE); SWAMPER (BRAKE PERSON AND SWITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HAN$53.6025.74LABO0220-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 2 BULL GANG MUCKER, TRACK PERSON; CHUCKTENDER, CABLETENDER; CONCRETE CREW, INCLUDING RODDER AND SPREADER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSO$53.9225.74LABO0220-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 3 BLASTER, DRILLER, POWDER PERSON; CHEMICAL GROUT JET PERSON; CHERRY PICKER PERSON; GROUT GUN PERSON; GROUT MIXER PERSON; GROUT PUMP PERSON; JACKLEG MINER; J$54.3825.74LABO0220-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.9420.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.1120.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND $49.3023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDI$50.6023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, G$52.6123.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC C$54.3523.97LABO1184-001
collectively bargained (union) rate
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL$46.1725.97LABO1414-001
collectively bargained (union) rate
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL$48.7225.97LABO1414-001
collectively bargained (union) rate

Official document: CA20260012 on SAM.gov.

CA20260013 rev 1 · Residential · Shasta

Classification as publishedBase rateFringesRate schedule
LABORER$9.110.00SUCA1986-005
DOL wage survey rate

Official document: CA20260013 on SAM.gov.

CA20260014 rev 6 · Building, Heavy, Highway · Santa Barbara

Classification as publishedBase rateFringesRate schedule
LABORER GROUP 1: CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A $46.4825.95LABO0220-001
collectively bargained (union) rate
LABORER GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, T$47.0325.95LABO0220-001
collectively bargained (union) rate
LABORER GROUP 3: BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER P$47.5825.95LABO0220-001
collectively bargained (union) rate
LABORER GROUP 4: ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDE$49.1325.95LABO0220-001
collectively bargained (union) rate
LABORER GROUP 5: BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACI$49.4825.95LABO0220-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK$55.0725.74LABO0220-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON (OUTSIDE); SWAMPER (BRAKE PERSON AND SWITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HAN$53.6025.74LABO0220-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 2 BULL GANG MUCKER, TRACK PERSON; CHUCKTENDER, CABLETENDER; CONCRETE CREW, INCLUDING RODDER AND SPREADER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSO$53.9225.74LABO0220-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 3 BLASTER, DRILLER, POWDER PERSON; CHEMICAL GROUT JET PERSON; CHERRY PICKER PERSON; GROUT GUN PERSON; GROUT MIXER PERSON; GROUT PUMP PERSON; JACKLEG MINER; J$54.3825.74LABO0220-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.9420.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.1120.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND $49.3023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDI$50.6023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, G$52.6123.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC C$54.3523.97LABO1184-001
collectively bargained (union) rate
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FOR$46.1725.97LABO1414-003
collectively bargained (union) rate
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, FORT IRWIN, M$48.7225.97LABO1414-003
collectively bargained (union) rate

Official document: CA20260014 on SAM.gov.

CA20260015 rev 5 · Building, Heavy, Highway · Ventura

Classification as publishedBase rateFringesRate schedule
LABORER GROUP 1: CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A $46.4825.95LABO0585-001
collectively bargained (union) rate
LABORER GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, T$47.0325.95LABO0585-001
collectively bargained (union) rate
LABORER GROUP 3: BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER P$47.5825.95LABO0585-001
collectively bargained (union) rate
LABORER GROUP 4: ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDE$49.1325.95LABO0585-001
collectively bargained (union) rate
LABORER GROUP 5: BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACI$49.4825.95LABO0585-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON (OUTSIDE); SWAMPER (BRAKE PERSON AND SWITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HAN$53.6025.74LABO0585-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 2: CHUCKTENDER, CABLETENDER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS (EXCEPT DRILLER); BULL GANG MUCKER, TRACK PER$53.9225.74LABO0585-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 3: BLASTER, DRILLER, POWDER PERSON; CHEMICAL GROUT JET PERSON; CHERRY PICKER PERSON; GROUT GUN PERSON; GROUT MIXER PERSON; GROUT PUMP PERSON; JACKLEG MINER; $54.3825.74LABO0585-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK$55.0725.74LABO0585-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.9420.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.1120.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND $49.3023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDI$50.6023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, G$52.6123.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC C$54.3523.97LABO1184-001
collectively bargained (union) rate
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL$46.1725.97LABO1414-001
collectively bargained (union) rate
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL$48.7225.97LABO1414-001
collectively bargained (union) rate

Official document: CA20260015 on SAM.gov.

CA20260016 rev 4 · Building · Tulare

Classification as publishedBase rateFringesRate schedule
LABORER$7.832.86SUCA1984-001
DOL wage survey rate

Official document: CA20260016 on SAM.gov.

CA20260017 rev 4 · Residential · Imperial, Los Angeles, Orange, Riverside, San Bernardino, San Luis Obispo and 2 more

Classification as publishedBase rateFringesRate schedule
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A W$35.2420.09LABO0220-003
collectively bargained (union) rate
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, $35.7920.09LABO0220-003
collectively bargained (union) rate
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PI$36.3420.09LABO0220-003
collectively bargained (union) rate
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOOR$37.8920.09LABO0220-003
collectively bargained (union) rate
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACIN$38.2420.09LABO0220-003
collectively bargained (union) rate
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A W$39.2323.30LABO0300-004
collectively bargained (union) rate
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, $39.7823.30LABO0300-004
collectively bargained (union) rate
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PI$40.3323.30LABO0300-004
collectively bargained (union) rate
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOOR$41.8823.30LABO0300-004
collectively bargained (union) rate
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACIN$42.2323.30LABO0300-004
collectively bargained (union) rate
LABORERS: (1) CLEANUP, FENCING (CHAIN LINK OR WOOD), LANDSCAPING RESIDENTIAL, 3 STORIES AND UNDER$45.0022.70LABO0300-007
collectively bargained (union) rate
LABORERS: (2) ALL OTHER WORK RESIDENTIAL, 3 STORIES AND UNDER$46.0022.70LABO0300-007
collectively bargained (union) rate
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A W$35.2420.09LABO0585-002
collectively bargained (union) rate
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, $35.7920.09LABO0585-002
collectively bargained (union) rate
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PI$36.3420.09LABO0585-002
collectively bargained (union) rate
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOOR$37.8920.09LABO0585-002
collectively bargained (union) rate
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACIN$38.2420.09LABO0585-002
collectively bargained (union) rate
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A W$35.2420.09LABO0652-002
collectively bargained (union) rate
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, $35.7920.09LABO0652-002
collectively bargained (union) rate
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PI$36.3420.09LABO0652-002
collectively bargained (union) rate
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOOR$37.8920.09LABO0652-002
collectively bargained (union) rate
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACIN$38.2420.09LABO0652-002
collectively bargained (union) rate
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A W$35.2420.09LABO0783-003
collectively bargained (union) rate
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, $35.7920.09LABO0783-003
collectively bargained (union) rate
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PI$36.3420.09LABO0783-003
collectively bargained (union) rate
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOOR$37.8920.09LABO0783-003
collectively bargained (union) rate
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACIN$38.2420.09LABO0783-003
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.9420.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.1120.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND $49.3023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDI$50.6023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, G$52.6123.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC C$54.3523.97LABO1184-001
collectively bargained (union) rate
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A W$35.2420.09LABO1184-003
collectively bargained (union) rate
LABORER GROUP 2 ASBESTOS ABATEMENT; ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, $35.7920.09LABO1184-003
collectively bargained (union) rate
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PI$36.3420.09LABO1184-003
collectively bargained (union) rate
LABORER GROUP 4 ANY WORKER EXPOSED TO RAW SEWAGE; ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOOR$37.8920.09LABO1184-003
collectively bargained (union) rate
LABORER GROUP 5BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING$38.2420.09LABO1184-003
collectively bargained (union) rate
LABORERS: PLASTER CLEAN-UP LABORER (1 TO 3 STORIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AM$36.9223.32LABO1414-002
collectively bargained (union) rate
LABORERS: PLASTER CLEAN-UP LABORER (4 STORIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBI$36.9223.32LABO1414-002
collectively bargained (union) rate
LABORERS: PLASTER TENDER (1 TO 3 STORIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS B$39.4723.32LABO1414-002
collectively bargained (union) rate
LABORERS: PLASTER TENDER (4 STORIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. WORK AT MILITARY BASES - $3.00 ADDITIONAL PER HOUR: CORONADO NAVAL AMPHIBIOUS BASE, $39.4723.32LABO1414-002
collectively bargained (union) rate

Official document: CA20260017 on SAM.gov.

CA20260018 rev 7 · Building, Heavy, Highway · Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera and 11 more

Classification as publishedBase rateFringesRate schedule
LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS REMOVAL-SCOPE OF WORK: SITE MOBILIZATION; INITIAL SITE CLEAN-UP; SITE PREPARATION; REMOVAL OF ASBESTOS-CONTAINING MATERIALS FROM WALLS$39.1530.03LABO0067-006
collectively bargained (union) rate
LABORER: ASBESTOS/MOLD/LEAD LABORER. ASBESTOS REMOVAL-SCOPE OF WORK: SITE MOBILIZATION; INITIAL SITE CLEAN-UP; SITE PREPARATION; REMOVAL OF ASBESTOS-CONTAINING MATERIALS FROM WALLS$38.1530.03LABO0067-006
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (CALAVERAS AND SAN JOAQUIN COUNTIES)$36.2627.30LABO0073-002
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (CALAVERAS AND SAN JOAQUIN COUNT$36.5627.30LABO0073-002
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (CALAVERAS AND SAN$34.0627.30LABO0073-002
collectively bargained (union) rate
LABORER: MASON TENDER-BRICK (SAN JOAQUIN COUNTY)$36.2925.55LABO0073-003
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$38.8529.89LABO0073-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$38.1529.89LABO0073-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$38.3729.89LABO0073-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$38.7029.89LABO0073-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$38.0029.89LABO0073-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $37.9029.89LABO0073-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$31.5929.89LABO0073-007
collectively bargained (union) rate
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS AND SAN JOAQUIN COUNTIES)$39.7728.54LABO0073-009
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (SAN FRANCISCO AND SAN MATEO COUNTIES)$37.2627.30LABO0261-003
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (SAN FRANCISCO AND SAN MATEO COU$37.5627.30LABO0261-003
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (SAN FRANCISCO AND$35.0627.30LABO0261-003
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$37.2027.30LABO0261-009
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$36.5027.30LABO0261-009
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$36.7227.30LABO0261-009
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$37.0527.30LABO0261-009
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$36.3527.30LABO0261-009
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $36.2527.30LABO0261-009
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$29.9427.30LABO0261-009
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)$36.2627.30LABO0270-003
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (SANTA CALARA COUNTY)$37.2627.30LABO0270-003
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (MONTEREY, SAN BENITO, AND SANTA$36.5627.30LABO0270-003
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (SANTA CALARA COUNTY)$37.5627.30LABO0270-003
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS, AND CRASH CUSHIONS. (MONTEREY, SAN BE$34.0627.30LABO0270-003
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS, AND CRASH CUSHIONS. (SANTA CALARA COU$35.0627.30LABO0270-003
collectively bargained (union) rate
LABORER: MASON TENDER-BRICK. (MONTEREY AND SAN BENITO COUNTIES)$36.2925.55LABO0270-005
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$36.2027.30LABO0270-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$35.5027.30LABO0270-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$35.7227.30LABO0270-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$36.0527.30LABO0270-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$35.3527.30LABO0270-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $35.2527.30LABO0270-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$28.9427.30LABO0270-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$37.2027.30LABO0270-010
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$36.5027.30LABO0270-010
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$36.7227.30LABO0270-010
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$37.0527.30LABO0270-010
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$36.3527.30LABO0270-010
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $36.2527.30LABO0270-010
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$29.9427.30LABO0270-010
collectively bargained (union) rate
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES)$40.6829.68LABO0270-011
collectively bargained (union) rate
LABORER, BRICK: MASON TENDER-BRICK. (FRESNO, KINGS AND MADERA COUNTIES)$36.2925.55LABO0294-001
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (FRESNO, KINGS, AND MADERA COUNTIES)$36.2627.30LABO0294-002
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (FRESNO, KINGS, AND MADERA COUNT$36.5627.30LABO0294-002
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (FRESNO, KINGS, AN$34.0627.30LABO0294-002
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$36.2027.30LABO0294-008
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$35.5027.30LABO0294-008
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$35.7227.30LABO0294-008
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$36.0527.30LABO0294-008
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$35.3527.30LABO0294-008
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $35.2527.30LABO0294-008
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$28.9427.30LABO0294-008
collectively bargained (union) rate
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (FRESNO, KINGS, AND MADERA COUNTIES)$39.7728.54LABO0294-011
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (ALAMEDA COUNTY)$37.2627.30LABO0304-002
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (ALAMEDA COUNTY)$37.5627.30LABO0304-002
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (ALAMEDA COUNTY)$35.0627.30LABO0304-002
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$37.2027.30LABO0304-004
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$36.5027.30LABO0304-004
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$36.7227.30LABO0304-004
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$37.0527.30LABO0304-004
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$36.3527.30LABO0304-004
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $36.2527.30LABO0304-004
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$29.9427.30LABO0304-004
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON. (CONTRA COSTA COUNTY)$37.2627.30LABO0324-002
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (CONTRA COSTA COUNTY)$37.5627.30LABO0324-002
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (CONTRA COSTA COUN$35.0627.30LABO0324-002
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$37.2027.30LABO0324-012
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$36.5027.30LABO0324-012
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$36.7227.30LABO0324-012
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$37.0527.30LABO0324-012
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-G- PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); CAULKER; BANDER; PIPEWRAPPER; CONDUIT LAYER; PLASTIC PIPE LAYER$36.7027.30LABO0324-012
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$36.3527.30LABO0324-012
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $36.2527.30LABO0324-012
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$29.9427.30LABO0324-012
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)$36.2627.30LABO1130-002
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I- LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (MARIPOSA, MERCED, STANISLAUS, A$36.5627.30LABO1130-002
collectively bargained (union) rate
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II- INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (MARIPOSA, MERCED,$34.0627.30LABO1130-002
collectively bargained (union) rate
LABORER: MASON TENDER-BRICK (MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES)$36.2925.55LABO1130-005
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP- ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S$36.2027.30LABO1130-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER,$35.5027.30LABO1130-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-A- JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANI$35.7227.30LABO1130-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1-E- WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MOR$36.0527.30LABO1130-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 2- ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AN$35.3527.30LABO1130-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 3- CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL $35.2527.30LABO1130-007
collectively bargained (union) rate
LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 4- FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$28.9427.30LABO1130-007
collectively bargained (union) rate
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS, & TUOLUMNE COUNTIE$39.7728.54LABO1130-008
collectively bargained (union) rate
LABORER, PLASTER TENDER. WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL. (MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES)$39.7728.54LABO1130-009
collectively bargained (union) rate

Official document: CA20260018 on SAM.gov.

CA20260019 rev 6 · Residential · Alameda, Contra Costa, El Dorado, Marin, Monterey, Napa and 12 more

Classification as publishedBase rateFringesRate schedule
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 (AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO,SANMATEO, SANTA CLARA) SCOPE OF WORK: Covers site mobilization; initial site $39.1530.03LABO0067-007
collectively bargained (union) rate
LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 (AREA 2: EL DORADO, MONTEREY, PLACE, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES) SCOPE OF WORK:$38.1530.03LABO0067-007
collectively bargained (union) rate
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER$36.2027.30LABO0185-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit laye$35.5027.30LABO0185-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHA$35.7227.30LABO0185-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING (EL DORADO, PLACER, SACR$35.5527.30LABO0185-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR M$36.0527.30LABO0185-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER $35.3527.30LABO0185-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAI$35.2527.30LABO0185-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$28.9427.30LABO0185-001
collectively bargained (union) rate
LABORER: MASON TENDER-BRICK (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES)$36.2925.55LABO0185-003
collectively bargained (union) rate
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER$37.2027.30LABO0261-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYE$36.5027.30LABO0261-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHA$36.7227.30LABO0261-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING (MARIN, SAN FRANCISCO, A$36.5527.30LABO0261-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR M$37.0527.30LABO0261-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER $36.3527.30LABO0261-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAI$36.2527.30LABO0261-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK$29.9427.30LABO0261-001
collectively bargained (union) rate
LABORER: MASON TENDER-BRICK MARIN COUNTY$37.5425.55LABO0261-008
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole f$37.2027.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, con$36.5027.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon drill$36.7227.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA ""A"" - S$36.5527.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 $37.0527.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA ""A"" - SANTA CLARA COUNTY AREA ""B"" - MONTEREY, S$37.0827.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucke$36.3527.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector;$36.2527.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windo$29.9427.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole f$36.2027.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, con$35.5027.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon drill$35.7227.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA ""B"" - M$35.5527.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 $36.0527.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA ""B"" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTI$36.0827.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucke$35.3527.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector;$35.2527.30LABO0270-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windo$28.9427.30LABO0270-001
collectively bargained (union) rate
LABORER: MASON TENDER-BRICK (MONTEREY AND SAN BENITO COUNTIES)$36.2925.55LABO0270-006
collectively bargained (union) rate
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER;$37.2027.30LABO0304-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1 ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER$36.5027.30LABO0304-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHAN$36.7227.30LABO0304-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MO$37.0527.30LABO0304-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER A$36.3527.30LABO0304-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL$36.2527.30LABO0304-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4 ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK $29.9427.30LABO0304-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole fo$37.2027.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, con$36.5027.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-A OY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER$36.7227.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C: (BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE (AREA ""A"" - CONTRA C$36.5527.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 $37.0527.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-G CONTRA COSTA COUNTY: Pipelayer (including grade checking on connection with peiplaying); Caulker; Bander; Pipewrapper; Co$36.7027.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKE$36.3527.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector;$36.2527.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windo$29.9427.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole f$36.2027.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, con$35.5027.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon drill$35.7227.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA ""B"" - N$35.5527.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 $36.0527.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucke$35.3527.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector;$35.2527.30LABO0324-001
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windo$28.9427.30LABO0324-001
collectively bargained (union) rate

Official document: CA20260019 on SAM.gov.

CA20260020 rev 5 · Building, Heavy, Highway · Inyo, Kern, Mono

Classification as publishedBase rateFringesRate schedule
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A W$46.4825.95LABO0220-002
collectively bargained (union) rate
LABORER GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, TH$47.0325.95LABO0220-002
collectively bargained (union) rate
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PI$47.5825.95LABO0220-002
collectively bargained (union) rate
LABORER GROUP 4 ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER$49.1325.95LABO0220-002
collectively bargained (union) rate
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACIN$49.4825.95LABO0220-002
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON (OUTSIDE); SWAMPER (BRAKE PERSON AND SWITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HAN$53.6025.74LABO0220-002
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 2: CHUCKTENDER, CABLETENDER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS (EXCEPT DRILLER); BULL GANG MUCKER, TRACK PER$53.9225.74LABO0220-002
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 3: BLASTER, DRILLER, POWDER PERSON; CHEMICAL GROUT JET PERSON; CHERRY PICKER PERSON; GROUT GUN PERSON; GROUT MIXER PERSON; GROUT PUMP PERSON; JACKLEG MINER; $54.3825.74LABO0220-002
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 4 GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK (KERN COUNTY)$55.0725.74LABO0220-002
collectively bargained (union) rate
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANING OF BRICK IF PERFORMED BY A W$46.4825.95LABO0783-001
collectively bargained (union) rate
LABORER GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER (ON 1 YD. OR LARGER MIXER AND HANDLING BULK CEMENT); CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, TH$47.0325.95LABO0783-001
collectively bargained (union) rate
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MACHINE; GAS, OIL AND/OR WATER PI$47.5825.95LABO0783-001
collectively bargained (union) rate
LABORER GROUP 4 ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES (ALL TYPES); CONCRETE CORE CUTTER (WALLS, FLOORS OR CEILINGS), GRINDER OR SANDER$49.1325.95LABO0783-001
collectively bargained (union) rate
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACIN$49.4825.95LABO0783-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 1: BATCH PLANT LABORER; CHANGEHOUSE PERSON; DUMP PERSON; DUMP PERSON (OUTSIDE); SWAMPER (BRAKE PERSON AND SWITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HAN$53.6025.74LABO0783-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 2: CHUCKTENDER, CABLETENDER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS (EXCEPT DRILLER); BULL GANG MUCKER, TRACK PER$53.9225.74LABO0783-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 3 GROUP 3: BLASTER, DRILLER, POWDER PERSON; CHEMICAL GROUT JET PERSON; CHERRY PICKER PERSON; GROUT GUN PERSON; GROUT MIXER PERSON; GROUT PUMP PERSON; JACKLEG$54.3825.74LABO0783-001
collectively bargained (union) rate
LABORER, TUNNEL: GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK (INYO AND MONO COUNTIES)$55.0725.74LABO0783-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.9420.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.1120.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.9620.86LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND $49.3023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD (SANDBLASTING, WATERBLASTING, GRINDI$50.6023.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE AND TRAFFIC BARS, ADHESIVES, G$52.6123.97LABO1184-001
collectively bargained (union) rate
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC C$54.3523.97LABO1184-001
collectively bargained (union) rate

Official document: CA20260020 on SAM.gov.

CA20260021 rev 2 · Heavy, Highway · Tulare

Classification as publishedBase rateFringesRate schedule
LABORER: TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS$34.0627.30LABO0294-003
collectively bargained (union) rate
LABORER: TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE$36.5627.30LABO0294-003
collectively bargained (union) rate
LABORER: TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON$36.2627.30LABO0294-003
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4 ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK $28.9427.30LABO0294-004
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAI$35.2527.30LABO0294-004
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER $35.3527.30LABO0294-004
collectively bargained (union) rate
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYE$35.5027.30LABO0294-004
collectively bargained (union) rate

Official document: CA20260021 on SAM.gov.

Showing the first 400 of 500 published construction laborer rates. The rest are on the individual determination pages linked above, each of which carries the full official text.

Where to go next

Construction Laborer rates in every state · California prevailing wage and state law · California determinations by county · pay calculator

Other trades in California