Electrician prevailing wage rates in New York
Federal Davis-Bacon rates published in 97 active determinations, 2026
- Active federal Davis-Bacon determinations for New York publish 1,132 electrician classification rates, across 97 determinations covering 62 counties.
- Those published base rates run from $17.08 to $64.59 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting electrician rates in New York: .
This page collects every classification in New York's active federal determinations that is a form of electrician work (wiring, conduit, service and power distribution work) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
NY20260002 rev 2 · Building, Heavy, Highway · Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN (ALBANY; COLUMBIA; FULTON; GREENE (THAT PORTION NORTH OF A LINE FOLLOWING THE SOUTH LIMITS OF THE CITY OF CATSKILL); MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHO | $48.00 | 32.09 | ELEC0236-001 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S | $43.35 | 30.73 | ELEC1249-007 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S | $54.19 | 35.69 | ELEC1249-007 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S | $43.53 | 30.75 | ELEC1249-007 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S | $49.25 | 31.15 | ELEC1249-007 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S | $48.77 | 31.31 | ELEC1249-007 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION S | $32.51 | 29.93 | ELEC1249-007 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260002 on SAM.gov.
NY20260003 rev 6 · Building, Heavy, Highway, Residential · Bronx, Kings, New York, Queens, Richmond
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANK | $62.00 | 65.81 | ELEC0003-001 collectively bargained (union) rate |
| ELECTRICIAN (JOBBING, AND MAINTENANCE AND REPAIR WORK) PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, L | $32.00 | 27.16 | ELEC0003-001 collectively bargained (union) rate |
Official document: NY20260003 on SAM.gov.
NY20260004 rev 2 · Building, Heavy, Highway · Broome, Chenango
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN CHENANGO (TWPS OF COLUMBUS, NEW BERLIN & SHERBURNE): HEAVY AND HIGHWAY | $50.50 | 35.03 | ELEC0043-003 collectively bargained (union) rate |
| ELECTRICIAN (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (ENTIRE COUNTY, EXCEPT COLUMBUS, NEW BERLIN AND SHERBURNE TOWNSHIPS) HEAVY AND HIGHWAY) | $42.68 | 33.06 | ELEC0325-002 collectively bargained (union) rate |
| ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHE | $42.29 | 30.66 | ELEC1249-010 collectively bargained (union) rate |
| ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHE | $52.86 | 35.60 | ELEC1249-010 collectively bargained (union) rate |
| ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHE | $44.93 | 30.85 | ELEC1249-010 collectively bargained (union) rate |
| ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHE | $42.29 | 30.66 | ELEC1249-010 collectively bargained (union) rate |
| ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHE | $31.72 | 29.87 | ELEC1249-010 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 42.82 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION, (SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE | $52.33 | 31.36 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-011 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY) A. NEW YEAR'S DAY, PR | $20.53 | 6.39 | ELEC1249-012 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY) A. NEW YEAR'S DAY | $40.81 | 6.99 | ELEC1249-012 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, | $38.73 | 6.93 | ELEC1249-012 collectively bargained (union) rate |
Official document: NY20260004 on SAM.gov.
NY20260005 rev 2 · Building, Heavy, Highway · Chemung, Schuyler
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN (CHEMUNG COUNTY) | $43.40 | 31.72 | ELEC0139-001 collectively bargained (union) rate |
| ELECTRICIAN (SCHUYLER COUNTY (TOWNSHIPS OF CATHARINE, CAYUTA AND HECTOR)) | $44.50 | 31.89 | ELEC0241-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260005 on SAM.gov.
NY20260006 rev 2 · Heavy, Highway · Clinton, Essex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN | $43.50 | 28.38 | ELEC0910-001 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260006 on SAM.gov.
NY20260007 rev 2 · Building, Heavy, Highway · Dutchess, Orange, Sullivan, Ulster
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $43.35 | 30.73 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $54.19 | 35.69 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $43.35 | 30.73 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $43.35 | 30.73 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $48.77 | 31.31 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $32.51 | 29.93 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORM | $49.25 | 31.15 | ELEC1249-005 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORM | $61.56 | 36.21 | ELEC1249-005 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORM | $49.25 | 31.15 | ELEC1249-005 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORM | $49.25 | 31.15 | ELEC1249-005 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORM | $55.40 | 31.78 | ELEC1249-005 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORM | $35.34 | 30.12 | ELEC1249-005 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260007 on SAM.gov.
NY20260008 rev 3 · Heavy, Highway · Cattaraugus, Chautauqua, Erie
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN (ERIE, CATTARAUGUS (ASHFORD, EAST OTTO, ELLICOTTVILLE, FARMERSVILLE, FREEDOM, FRANKLINVILLE, LYNDON, MACHIAS, MANSFIELD, NEW ALBION, OTTO, PERRYSBURG, PERSIA AND YORKSH | $44.50 | 36.06 | ELEC0041-007 collectively bargained (union) rate |
| ELECTRICIAN (CHAUTAUQUA, CATTARAUGUS (REMAINDER OF COUNTY)) | $42.50 | 27.23 | ELEC0106-002 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260008 on SAM.gov.
NY20260009 rev 3 · Heavy, Highway · Jefferson, Lewis, St Lawrence
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN | $43.50 | 28.38 | ELEC0910-005 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260009 on SAM.gov.
NY20260010 rev 2 · Building, Heavy, Highway · Monroe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN | $44.30 | 30.20 | ELEC0086-002 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260010 on SAM.gov.
NY20260011 rev 3 · Heavy, Highway · Niagara
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIANS | $44.20 | 32.90 | ELEC0237-001 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260011 on SAM.gov.
NY20260012 rev 2 · Building, Heavy, Highway, Residential · Nassau, Suffolk
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN | $64.55 | 47.40 | ELEC0025-001 collectively bargained (union) rate |
| ELECTRICIANS: (TELEPHONE UNIT) | $42.93 | 32.43 | ELEC0025-002 collectively bargained (union) rate |
| ELECTRICIANS: (MAINTENANCE UNIT) | $49.79 | 32.27 | ELEC0025-002 collectively bargained (union) rate |
Official document: NY20260012 on SAM.gov.
NY20260013 rev 2 · Building · Oneida
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN | $50.50 | 35.03 | ELEC0043-001 collectively bargained (union) rate |
Official document: NY20260013 on SAM.gov.
NY20260014 rev 3 · Heavy, Highway · Oneida
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN | $50.50 | 35.03 | ELEC0043-001 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260014 on SAM.gov.
NY20260015 rev 3 · Heavy, Highway · Madison
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN | $50.50 | 35.03 | ELEC0043-001 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260015 on SAM.gov.
NY20260016 rev 3 · Heavy, Highway · Onondaga
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN (ALL OF ONONDAGA COUNTY EXCEPT ELBRIDGE AND SKANEATELES) | $50.50 | 35.03 | ELEC0043-007 collectively bargained (union) rate |
| ELECTRICIAN (REMAINDER OF ONONDAGA COUNTY (ELBRIDGE AND SKANCATELES)) | $45.00 | 31.12 | ELEC0840-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC G | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE I | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | $63.14 | 33.82 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission co | $64.59 | 42.92 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fi | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR | $40.81 | 6.99 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY | $20.53 | 6.39 | ELEC1249-008 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, | $38.73 | 6.93 | ELEC1249-008 collectively bargained (union) rate |
Official document: NY20260016 on SAM.gov.
NY20260017 rev 2 · Building, Heavy, Highway, Residential · Westchester
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN (TELEDATA TECHNICIAN) A. $2.00 PER HOUR NOT TO EXCEED $14.00 PER DAY | $58.75 | 60.50 | ELEC0003-003 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION | $46.79 | 30.98 | ELEC1249-001 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION | $58.49 | 35.99 | ELEC1249-001 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION | $46.79 | 30.98 | ELEC1249-001 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION | $52.64 | 31.58 | ELEC1249-001 collectively bargained (union) rate |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION | $35.09 | 30.11 | ELEC1249-001 collectively bargained (union) rate |
| ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL WORK INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION | $46.79 | 30.98 | ELEC1249-001 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUN | $46.79 | 30.98 | ELEC1249-006 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUN | $46.79 | 30.98 | ELEC1249-006 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUN | $49.72 | 31.18 | ELEC1249-006 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUN | $52.64 | 31.58 | ELEC1249-006 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUN | $35.09 | 30.11 | ELEC1249-006 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: (SUBSTATION AND SWITCHING STRUCTURES PIPETYPE CABLE, UNDERGROUND FUILD AND GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATION, FIBER OPTIC GROUN | $58.49 | 35.99 | ELEC1249-006 collectively bargained (union) rate |
| ELECTRICIAN (LINE CONSTRUCTION) TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT (INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR) | $38.73 | 6.93 | ELEC1249-009 collectively bargained (union) rate |
| ELECTRICIAN (LINE CONSTRUCTION) TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT (GROUNDMAN) | $20.53 | 6.39 | ELEC1249-009 collectively bargained (union) rate |
| ELECTRICIAN (LINE CONSTRUCTION) TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT (CABLE SPLICER) | $40.81 | 6.99 | ELEC1249-009 collectively bargained (union) rate |
Official document: NY20260017 on SAM.gov.
NY20260018 rev 1 · Highway · Steuben
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN | $43.40 | 31.72 | ELEC0139-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $52.86 | 35.60 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $47.57 | 31.03 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $42.29 | 30.66 | ELEC1249-003 collectively bargained (union) rate |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER | $31.72 | 29.87 | ELEC1249-003 collectively bargained (union) rate |
Official document: NY20260018 on SAM.gov.
NY20260019 rev 1 · Building · Niagara
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIANS | $44.20 | 32.90 | ELEC0237-001 collectively bargained (union) rate |
Official document: NY20260019 on SAM.gov.
NY20260020 rev 2 · Building, Heavy, Highway, Residential · Rockland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $43.35 | 30.73 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $54.19 | 35.69 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $43.35 | 30.73 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $43.35 | 30.73 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $48.77 | 31.31 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WE | $32.51 | 29.93 | ELEC1249-002 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all f | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | $61.56 | 36.21 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmiss | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transm | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including | $49.25 | 31.15 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas f | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line wo | $55.40 | 31.78 | ELEC1249-004 collectively bargained (union) rate |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit | $35.34 | 30.12 | ELEC1249-004 collectively bargained (union) rate |
Official document: NY20260020 on SAM.gov.
Showing the first 400 of 1,132 published electrician rates. The rest are on the individual determination pages linked above, each of which carries the full official text.
Where to go next
Electrician rates in every state · New York prevailing wage and state law · New York determinations by county · pay calculator
Other trades in New York
Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Heavy Equipment Operator · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Plasterer · Glazier · Insulator (Heat & Frost) · Millwright · Boilermaker · Elevator Constructor · Sprinkler Fitter · Tile Setter · Tile Finisher · Floor Layer · Line Constructor / Lineman