Heavy Equipment Operator prevailing wage rates in New York
Federal Davis-Bacon rates published in 93 active determinations, 2026
- Active federal Davis-Bacon determinations for New York publish 571 heavy equipment operator classification rates, across 93 determinations covering 62 counties.
- Those published base rates run from $18.49 to $100.18 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in New York: .
This page collects every classification in New York's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
NY20260002 rev 2 · Building, Heavy, Highway · Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DU | $51.01 | 33.20 | ENGI0158-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) EXCLUDING | $55.42 | 33.20 | ENGI0158-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BUILDING): GROUP B BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRA | $53.91 | 33.20 | ENGI0158-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR (BUILDING): GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL SWING), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER | $54.93 | 33.20 | ENGI0158-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | 33.55 | ENGI0158-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL | $56.39 | 33.55 | ENGI0158-026 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT | $57.30 | 33.55 | ENGI0158-026 collectively bargained (union) rate |
Official document: NY20260002 on SAM.gov.
NY20260003 rev 6 · Building, Heavy, Highway, Residential · Bronx, Kings, New York, Queens, Richmond
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: COMPRESSORS, WELDING MACHINES | $56.34 | 36.95 | ENGI0014-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, STEEL ERECTION: CRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKS | $96.26 | 36.95 | ENGI0014-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2 RUBBER TIRE BACKHOES OVER 37,000 LBS, TRACK BACKHOES, POWER SHOVEL, HYDRAULIC CLAM SHELLS, MOLES AND MACHINES OF A SIMILAR TYPE F | $97.06 | 38.95 | ENGI0014-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BO | $100.18 | 38.95 | ENGI0014-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR N | $97.75 | 38.95 | ENGI0014-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD . | $93.74 | 38.95 | ENGI0014-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PU | $91.04 | 38.95 | ENGI0014-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS, (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDIN | $57.52 | 38.95 | ENGI0014-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: ASPHALT SPREADER | $91.04 | 38.95 | ENGI0014-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 4 (BUILDING & RESIDENTIAL) FORK LIFT, HOUSE CARS, PLASTER (PLATFORM MACHINE), PLASTER BUCKET, CONCRETE PUMP AND ALL OTHER EQUIPMENT USED FOR HOISTING | $72.46 | 38.95 | ENGI0014-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING & RESIDENTIAL) COMPRESSORS, WELDING MACHINES (CUTTING CONCRETE WORK), PAINT SPRAYING, SAND BLASTING, PUMPS (WITH THE EXCLUSION OF CONCRET | $54.12 | 38.95 | ENGI0014-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY AND HIGHWAY) RUBBER TIRE BACKHOES UP TO AND INCLUDING 37,000 LBS, BASIN MACHINES, GROOVER, MECHANICAL SWEEPERS, BOBCAT, BOOM TRUCK, BARRIER | $72.40 | 38.00 | ENGI0015-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY AND HIGHWAY) CHERRYPICKERS 20 TONS AND OVER AND LOADERS (RUBBER-TIRED AND/OR TRACTOR TYPE WITH A MANFUFACTURER'S RATED CAPACITY OF SIX CUBIC | $74.65 | 38.00 | ENGI0015-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY AND HIGHWAY) MINOR EQUIPMENT SUCH AS TRACTORS, POST HOLE DIGGERS AND DRIVERS, DITCH WITCH (WALK BEHIND), ROAD FINISHING MACHINES, ROLLERS (F | $68.62 | 38.00 | ENGI0015-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) GRADALLS AND CONCRETE PUMPS OR SIMILARLY | $64.82 | 38.00 | ENGI0015-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) SHOVELS, CRANES (DRAGLINES), BACKHOES, PA | $44.45 | 38.00 | ENGI0015-001 collectively bargained (union) rate |
Official document: NY20260003 on SAM.gov.
NY20260004 rev 2 · Building, Heavy, Highway · Broome, Chenango
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS:, BUILDING:: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COM | $46.54 | 32.80 | ENGI0158-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B BACKHOES (RUBBER TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GR | $48.85 | 32.80 | ENGI0158-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, BUILDING: GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE, FULL SWING), GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADE | $49.31 | 32.80 | ENGI0158-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCKS OVER 5 TONS BROOME COU | $51.71 | 32.80 | ENGI0158-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | 33.55 | ENGI0158-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL | $56.39 | 33.55 | ENGI0158-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT | $57.30 | 33.55 | ENGI0158-019 collectively bargained (union) rate |
Official document: NY20260004 on SAM.gov.
NY20260005 rev 2 · Building, Heavy, Highway · Chemung, Schuyler
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS | $36.61 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN | $54.42 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST | $51.80 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR | $40.10 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC | $57.21 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ( | $54.68 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI | $40.79 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $58.43 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $55.38 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS | $41.26 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 (BUILDING CONSTRUCTION) ANY COMBINATION (NOT TO EXCEED THREE (3) PIECES OF EQUIPMENT) COMPRESSORS �THREE (3) OR LESS, OR NOT TO EXCEED 1200 CFM C | $39.64 | 35.20 | ENGI0158-037 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING CONSTRUCTION) A-FRAME TRUCK, BACKFILLING MACHINE, BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR TYPE MACHINES, BELT CRETE AND SIMI | $42.34 | 35.20 | ENGI0158-037 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING CONSTRUCTION) AIR TUGGER, ALL TERRAIN TELESCOPING MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND SIMILAR MACHINES OVER THREE EIGHTHS | $43.14 | 35.20 | ENGI0158-037 collectively bargained (union) rate |
Official document: NY20260005 on SAM.gov.
NY20260006 rev 2 · Heavy, Highway · Clinton, Essex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT | $54.90 | 32.45 | ENGI0158-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL | $53.99 | 32.45 | ENGI0158-027 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.42 | 32.45 | ENGI0158-027 collectively bargained (union) rate |
Official document: NY20260006 on SAM.gov.
NY20260007 rev 2 · Building, Heavy, Highway · Dutchess, Orange, Sullivan, Ulster
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 6 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $49.26 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 5B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $47.00 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 5A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $61.95 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 5 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $49.53 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 4B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $45.94 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 4A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $54.33 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $52.25 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $54.88 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $56.97 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $54.41 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $59.04 | 31.32 | ENGI0137-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5OILER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREM | $64.02 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 | $59.19 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERA | $70.41 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-3 ENGINEER-- PILE DRIVER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 C | $75.13 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IR | $77.82 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1 | $64.02 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERAT | $44.19 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATOR | $51.57 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB | $56.81 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER | $59.67 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS | $57.84 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-B ROAD PAVER, ASPHALT (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) | $63.70 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZ | $60.42 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (POUGHKEEPSIE AND SOUTH THEREOF) NOT | $68.63 | 35.25 | ENGI0137-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, | $51.01 | 33.20 | ENGI0158-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:: GROUP B BACKHOE, (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRAD | $53.91 | 33.20 | ENGI0158-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) GROUP A(1 | $55.42 | 33.20 | ENGI0158-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP A SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END | $54.93 | 33.20 | ENGI0158-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY) A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAS | $53.82 | 33.55 | ENGI0158-018 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY & HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLAN | $56.39 | 33.55 | ENGI0158-018 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY) | $57.30 | 33.55 | ENGI0158-018 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 1 | $61.72 | 37.50 | ENGI0825-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELE | $56.59 | 37.50 | ENGI0825-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 3 ASPHALT CURBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND S | $58.22 | 37.50 | ENGI0825-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 2 ""A"" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) | $60.13 | 37.50 | ENGI0825-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUPGROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE (ORANGE, ULS | $53.34 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 I | $57.06 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; | $58.56 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINE | $60.70 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOP | $62.35 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECT | $61.28 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 | $68.37 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. (ORAN | $69.96 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTE | $57.10 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER | $58.63 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HY | $61.29 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND | $68.58 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND | $70.24 | 37.50 | ENGI0825-008 collectively bargained (union) rate |
Official document: NY20260007 on SAM.gov.
NY20260008 rev 3 · Heavy, Highway · Cattaraugus, Chautauqua, Erie
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER, AUTOMATIC F | $47.39 | 36.89 | ENGI0017-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4 OR LESS), COMPRESSORS: (ANY | $42.89 | 36.89 | ENGI0017-012 collectively bargained (union) rate |
Official document: NY20260008 on SAM.gov.
NY20260009 rev 3 · Heavy, Highway · Jefferson, Lewis, St Lawrence
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING) | $36.84 | 23.80 | ENGI0158-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING) ""A"" FRAME TRUCK, BLACKTOP PLANT (NON AUTOMATIC), ALL BACK DUMPS, BORING MACHINE, BULLDOZER, CAGEHOIST, CARRY-ALL SCRAPER, CENTRAL MIX | $34.78 | 23.80 | ENGI0158-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING) COMPRESSOR (UP TO 500 C.F.), CONCRETE PAVER OR MIXER (UNDER 16S), CONCRETE PAVEMENT SPREADERS AND FINISHERS (NOT AUTOMATED), CONVEYOR (O | $30.68 | 23.80 | ENGI0158-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, R | $55.85 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED) | $54.97 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
Official document: NY20260009 on SAM.gov.
NY20260010 rev 2 · Building, Heavy, Highway · Monroe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS | $36.61 | 34.85 | ENGI0158-032 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN | $54.42 | 35.00 | ENGI0158-032 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST | $51.81 | 35.75 | ENGI0158-032 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR | $40.10 | 34.85 | ENGI0158-032 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC | $57.21 | 35.00 | ENGI0158-032 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ( | $54.68 | 35.75 | ENGI0158-032 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI | $40.79 | 34.85 | ENGI0158-032 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $58.43 | 35.00 | ENGI0158-032 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $55.38 | 35.75 | ENGI0158-032 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS | $41.26 | 34.85 | ENGI0158-032 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 (BUILDING CONSTRUCTION) ANY COMBINATION (NOT TO EXCEED THREE (3) PIECES OF EQUIPMENT) COMPRESSORS �THREE (3) OR LESS, OR NOT TO EXCEED 1200 CFM C | $39.64 | 35.20 | ENGI0158-038 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING CONSTRUCTION) A-FRAME TRUCK, BACKFILLING MACHINE, BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR TYPE MACHINES, BELT CRETE AND SIMI | $42.34 | 35.20 | ENGI0158-038 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING CONSTRUCTION) AIR TUGGER, ALL TERRAIN TELESCOPING MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND SIMILAR MACHINES OVER THREE EIGHTHS | $43.14 | 35.20 | ENGI0158-038 collectively bargained (union) rate |
Official document: NY20260010 on SAM.gov.
NY20260011 rev 3 · Heavy, Highway · Niagara
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP A1 (HEAVY AND HIGHWAY CONSTRUCTION) BACKFILLERS, BACKHOES, AUTOMATIC BATCH PLANT OPERATOR, BLACK-TOP SPREADERS, BULLDOZERS, CMI GRADING MACHINES, CAB | $47.39 | 34.84 | ENGI0017-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP B (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESORS (OVER 165 CU. FT), BOBCAT TYPE SKID LOADER, COMPRESSORS WHEN USED IN BANKS OF TWO AND NOT OVER THRE | $42.89 | 34.84 | ENGI0017-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP A1 CRANE (UNDERGROUND), FRONT END LOADER (TUNNEL AND SHAFT), HOIST (2 OR 3 DRUM), MAINTENANCE ENGINEER (TUNNEL AND SHAFT), MINING | $39.29 | 28.10 | ENGI0017-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP B AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE (TOPSIDE), BORING MACHINE, COMPRESSORS (4 OR LESS, EXCEEDING 2,000 C.F.M. COMBINE | $34.58 | 28.10 | ENGI0017-008 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP C COMRPESSORS (4 NOT TO EXCEED 2,000 C.F.M. COMBINED CAPACITY OR 3 OR LESS WITH MORE THAN 1,200 C.F.M. BUT NOT TO EXCEED 2,000 C. | $28.53 | 28.10 | ENGI0017-008 collectively bargained (union) rate |
Official document: NY20260011 on SAM.gov.
NY20260012 rev 2 · Building, Heavy, Highway, Residential · Nassau, Suffolk
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING CONSTRUCTION) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG | $54.21 | 39.99 | ENGI0138-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 (BUILDING CONSTRUCTION) COMPRESSOR, COMPRESSOR (ON CRANE), COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR | $56.54 | 39.99 | ENGI0138-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3(BUILDING CONSTRUCTION) COMRPESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE IN BATTERY), CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, | $73.78 | 39.99 | ENGI0138-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING CONSTRUCTION) BACKHOE, BOOM TRUCK, BULLDOZER, CHERYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST, 2 DRUM, LOADING MACHINE | $76.44 | 39.99 | ENGI0138-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING CONSTRUCTION) ASPHALT SPREADER, BACKHOE CRAWLER CAPACITY OVER CATER- PILLER 225 AND LOMATSU 300, BOILER (THERMOPLASTIC), CHERRY PICKER, | $80.43 | 39.99 | ENGI0138-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY & HIGHWAY) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), GRINDER, MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 | $56.55 | 40.15 | ENGI0138-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY & HIGHWAY) COMPRESSOR, COMPRESSOR ON CRANE, COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, | $58.93 | 40.15 | ENGI0138-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 (HEAVY & HIGHWAY) CURB MACHINE (ASPHALT OR CONCRETE), MAINTENANCE ENGINEER (SMALL EQUIPMENT), MAINTENANCE ENGINEER (WELL-POINT) MECHANIC (FIELDMA | $76.61 | 40.15 | ENGI0138-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 (HEAVY & HIGHWAY) BULLDOZER, BACKHOE, BOOM TRUCK, BORING MACHINE/AUGUR, CHERRYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST (2 DRUM | $79.33 | 40.15 | ENGI0138-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 (HEAVY & HIGHWAY) ASPHALT SPREADER, BACKHOE CRAWLER (CAPACITY OVER CATERPILLER 225 AND KOMATSU 300), BOILER (THERMOPLASTIC), BORING MACHINE (POST | $84.70 | 40.15 | ENGI0138-002 collectively bargained (union) rate |
Official document: NY20260012 on SAM.gov.
NY20260014 rev 3 · Heavy, Highway · Oneida
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, R | $55.85 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED) | $54.97 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
Official document: NY20260014 on SAM.gov.
NY20260015 rev 3 · Heavy, Highway · Madison
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, R | $55.85 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED) | $54.97 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR - BACKHOE | $19.08 | 7.50 | SUNY1992-001 DOL wage survey rate |
Official document: NY20260015 on SAM.gov.
NY20260016 rev 3 · Heavy, Highway · Onondaga
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, R | $55.85 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED) | $54.97 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT), AUTOMATED FINE GRADE MACHINE (CMI), BACKHOE, BELT PLACER (CMI OR SIMILAR), BL | $44.74 | 27.65 | ENGI0158-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 (TUNNEL AND SHAFT) AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE (TOP SIDE), BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITIMINOUS SPREADER AND MIX | $43.52 | 27.65 | ENGI0158-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 (TUNNEL AND SHAFT) A-FRAME TRUCK, BALLAST REGULATOR (RIDE ON), COMPRESSORS (4 NOT TO EXCEED 2000 C.F.M. COMBINED CAPACITY; OR 3 OR LESS WITH MORE | $40.73 | 27.65 | ENGI0158-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 (TUNNEL AND SHAFT) AGGREGATE PLANT, BOILER (USED IN CONJUNCTION WITH PRODUCTION), CEMENT AND BIN OPERATOR, COMPRESSORS (3 OR LESS NOT TO EXCEED 1 | $37.72 | 27.65 | ENGI0158-021 collectively bargained (union) rate |
Official document: NY20260016 on SAM.gov.
NY20260017 rev 2 · Building, Heavy, Highway, Residential · Westchester
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 4-B (BUILDING & RESIDENTIAL CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STE | $45.94 | 31.32 | ENGI0137-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4-A (BUILDING & RESIDENTIAL CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE | $54.33 | 31.32 | ENGI0137-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3-B (BUILDING & RESIDENTIAL CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERAT | $52.25 | 31.32 | ENGI0137-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3-A (BUILDING & RESIDENTIAL CONSTRUCTION) ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT | $54.88 | 31.32 | ENGI0137-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2-A (BUILDING & RESIDENTIAL CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR O | $56.97 | 31.32 | ENGI0137-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1-B (BUILDING & RESIDENTIAL CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES | $54.41 | 31.32 | ENGI0137-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1-A (BUILDING & RESIDENTIAL CONSTRUCTION) CARRIER- TRAILER HORSE; CONCRET-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPER S | $59.04 | 31.32 | ENGI0137-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS ( | $59.19 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT | $70.41 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MA | $77.82 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMP | $44.19 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PR | $51.57 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; | $56.81 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRU | $57.84 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX | $60.42 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU | $68.63 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
Official document: NY20260017 on SAM.gov.
NY20260018 rev 1 · Highway · Steuben
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS | $36.61 | 34.85 | ENGI0158-033 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN | $54.42 | 35.00 | ENGI0158-033 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST | $51.81 | 35.75 | ENGI0158-033 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR | $40.10 | 34.85 | ENGI0158-033 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC | $57.21 | 35.00 | ENGI0158-033 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ( | $54.68 | 35.75 | ENGI0158-033 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI | $40.79 | 34.85 | ENGI0158-033 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $58.43 | 35.00 | ENGI0158-033 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $55.38 | 35.75 | ENGI0158-033 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS | $41.26 | 34.85 | ENGI0158-033 collectively bargained (union) rate |
Official document: NY20260018 on SAM.gov.
NY20260019 rev 1 · Building · Niagara
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP A1 ROLLER | $44.23 | 35.40 | ENGI0017-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP A1 LOADER | $44.23 | 35.40 | ENGI0017-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP A1 BULLDOZER | $44.23 | 35.40 | ENGI0017-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP A1 FORKLIFT OPERATOR/LULL | $44.23 | 35.40 | ENGI0017-010 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP A1 BACKHOE OPERATORS | $44.23 | 35.40 | ENGI0017-010 collectively bargained (union) rate |
Official document: NY20260019 on SAM.gov.
NY20260020 rev 2 · Building, Heavy, Highway, Residential · Rockland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1 | $61.72 | 37.50 | ENGI0825-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION- GROUP 2 ""A"" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF B | $60.13 | 37.50 | ENGI0825-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); | $56.59 | 37.50 | ENGI0825-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINIS | $58.22 | 37.50 | ENGI0825-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE NOTES: HYDROGRA | $53.34 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 | $57.06 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY | $58.56 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHI | $60.70 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES) GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELIC | $62.35 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS(BUILDING CONSTRUCTION TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB, LESS THAN 14 | $68.37 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELE | $61.28 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION TANK ERECTION): GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETC WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOT | $69.96 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYS | $57.10 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGE | $58.63 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR | $61.29 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LA | $68.58 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING CONSTRUCTION STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LA | $70.24 | 37.50 | ENGI0825-013 collectively bargained (union) rate |
Official document: NY20260020 on SAM.gov.
NY20260021 rev 2 · Heavy, Highway · Delaware
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 1 AUTOGRADE-PAVEMENT-PROFILER (CMI ND SIMILAR TYPE); AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR | $61.72 | 37.50 | ENGI0825-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEX | $58.22 | 37.50 | ENGI0825-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR | $56.59 | 37.50 | ENGI0825-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION - GROUP 2 ""A"" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) N | $60.13 | 37.50 | ENGI0825-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAG | $68.58 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELIC | $62.35 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHI | $60.70 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY | $58.56 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 | $57.10 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (STEEL ERECTION) : GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND | $61.29 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAG | $70.24 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PAR | $58.63 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER | $57.10 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND | $68.37 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT | $61.28 | 37.50 | ENGI0825-015 collectively bargained (union) rate |
Official document: NY20260021 on SAM.gov.
NY20260022 rev 2 · Building · Jefferson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE | $49.61 | 31.85 | ENGI0158-001 collectively bargained (union) rate |
| OPERATOR: ROLLER | $27.74 | 5.89 | SUNY2016-001 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.19 | 17.42 | SUNY2016-001 DOL wage survey rate |
| OPERATOR: FORKLIFT | $33.14 | 21.04 | SUNY2016-001 DOL wage survey rate |
| OPERATOR: BULLDOZER | $31.60 | 21.52 | SUNY2016-001 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.17 | 17.76 | SUNY2016-001 DOL wage survey rate |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $33.62 | 17.98 | SUNY2016-001 DOL wage survey rate |
Official document: NY20260022 on SAM.gov.
NY20260023 rev 2 · Building · Madison
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE | $49.61 | 31.85 | ENGI0158-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $48.11 | 31.85 | ENGI0158-002 collectively bargained (union) rate |
| OPERATOR: ROLLER | $28.51 | 12.31 | SUNY2016-002 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.19 | 17.42 | SUNY2016-002 DOL wage survey rate |
| OPERATOR: FORKLIFT | $33.14 | 21.04 | SUNY2016-002 DOL wage survey rate |
| OPERATOR: BULLDOZER | $31.03 | 20.05 | SUNY2016-002 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.17 | 17.76 | SUNY2016-002 DOL wage survey rate |
Official document: NY20260023 on SAM.gov.
NY20260024 rev 2 · Highway · Tompkins
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED) | $54.97 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, R | $55.85 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
Official document: NY20260024 on SAM.gov.
NY20260025 rev 2 · Building, Heavy, Highway · Putnam
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 4-B (BUILDING CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEE | $45.94 | 31.32 | ENGI0137-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4-A (BUILDING CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR | $54.33 | 31.32 | ENGI0137-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3-B (BUILDING CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING M | $52.25 | 31.32 | ENGI0137-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3-A (BUILDING CONSTRUCTION) ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); J | $54.88 | 31.32 | ENGI0137-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2-A (BUILDING CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER | $56.97 | 31.32 | ENGI0137-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1-B (BUILDING CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRA | $54.41 | 31.32 | ENGI0137-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1-A (BUILDING CONSTRUCTION) CARRIER- TRAILER HORSE; CONCRET-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPER STRUCTURE SUB- | $59.04 | 31.32 | ENGI0137-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS ( | $59.19 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT | $70.41 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MA | $77.82 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMP | $44.19 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PR | $51.57 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; | $56.81 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRU | $57.84 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX | $60.42 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU | $68.63 | 35.25 | ENGI0137-006 collectively bargained (union) rate |
Official document: NY20260025 on SAM.gov.
NY20260026 rev 2 · Building · Onondaga
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE | $49.61 | 31.85 | ENGI0158-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $48.11 | 31.85 | ENGI0158-002 collectively bargained (union) rate |
| OPERATOR: ROLLER | $28.51 | 12.31 | SUNY2016-003 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.19 | 17.42 | SUNY2016-003 DOL wage survey rate |
| OPERATOR: FORKLIFT | $33.14 | 21.04 | SUNY2016-003 DOL wage survey rate |
| OPERATOR: BULLDOZER | $31.03 | 20.05 | SUNY2016-003 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.17 | 17.76 | SUNY2016-003 DOL wage survey rate |
Official document: NY20260026 on SAM.gov.
NY20260027 rev 2 · Building · Oswego
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE | $49.61 | 31.85 | ENGI0158-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $48.11 | 31.85 | ENGI0158-002 collectively bargained (union) rate |
| OPERATOR: ROLLER | $28.51 | 12.31 | SUNY2016-004 DOL wage survey rate |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.19 | 17.42 | SUNY2016-004 DOL wage survey rate |
| OPERATOR: FORKLIFT | $33.14 | 21.04 | SUNY2016-004 DOL wage survey rate |
| OPERATOR: BULLDOZER | $31.03 | 20.05 | SUNY2016-004 DOL wage survey rate |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.17 | 17.76 | SUNY2016-004 DOL wage survey rate |
Official document: NY20260027 on SAM.gov.
NY20260029 rev 3 · Heavy, Highway · Genesee
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER, AUTOMATIC F | $47.39 | 36.89 | ENGI0017-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4 OR LESS), COMPRESSORS: (ANY | $42.89 | 36.89 | ENGI0017-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR TUGGER, ALL TERRAIN TELESCOPING MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND SIMILAR MACHINES OVER THREE EIGHTHS CU.YD. CAPACITY (FACT. | $36.66 | 32.74 | ENGI0158-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 A-FRAME TRUCK, BACKFILLING MACHINE, BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR TYPE MACHINES, BELT CRETE AND SIMILAR TYPE MACHINES, BITUM | $35.86 | 32.74 | ENGI0158-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ANY COMBINATION (NOT TO EXCEED THREE (3) PIECES OF EQUIPMENT) COMPRESSORS �THREE (3) OR LESS, OR NOT TO EXCEED 1200 CFM COMBINED CAPACITY, FIREMA | $33.16 | 32.74 | ENGI0158-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 OILERS (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVI | $28.60 | 32.74 | ENGI0158-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5 CRANES UP TO AND INCLUDING 25 TONS (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENC | $41.16 | 32.74 | ENGI0158-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 6 CRANES 25-250 TONS (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY | $43.66 | 32.74 | ENGI0158-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 7 CRANES 251 AND OVER TONS (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LAB | $44.66 | 32.74 | ENGI0158-013 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 8 TOWER CRANES (THE EASTERN PORTION INCLUDING THE CITY OF BATAVIA) A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THAN | $43.66 | 32.74 | ENGI0158-013 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS | $55.38 | 34.85 | ENGI0158-034 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $55.38 | 35.75 | ENGI0158-034 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $58.43 | 35.00 | ENGI0158-034 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI | $40.79 | 34.85 | ENGI0158-034 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ( | $54.68 | 35.75 | ENGI0158-034 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC | $57.21 | 35.00 | ENGI0158-034 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR | $40.10 | 34.85 | ENGI0158-034 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST | $51.81 | 35.75 | ENGI0158-034 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN | $54.42 | 35.00 | ENGI0158-034 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS | $36.61 | 34.85 | ENGI0158-034 collectively bargained (union) rate |
Official document: NY20260029 on SAM.gov.
NY20260030 rev 2 · Building, Heavy, Highway · Livingston
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS | $36.61 | 34.85 | ENGI0158-035 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN | $54.42 | 35.00 | ENGI0158-035 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST | $51.81 | 35.75 | ENGI0158-035 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR | $40.10 | 34.85 | ENGI0158-035 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC | $57.21 | 35.00 | ENGI0158-035 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ( | $54.68 | 35.75 | ENGI0158-035 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI | $40.79 | 34.85 | ENGI0158-035 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $58.43 | 35.00 | ENGI0158-035 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $55.38 | 35.75 | ENGI0158-035 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS | $41.26 | 34.85 | ENGI0158-035 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 (BUILDING CONSTRUCTION) ANY COMBINATION (NOT TO EXCEED THREE (3) PIECES OF EQUIPMENT) COMPRESSORS �THREE (3) OR LESS, OR NOT TO EXCEED 1200 CFM C | $39.64 | 35.20 | ENGI0158-039 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING CONSTRUCTION) A-FRAME TRUCK, BACKFILLING MACHINE, BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR TYPE MACHINES, BELT CRETE AND SIMI | $42.34 | 35.20 | ENGI0158-039 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING CONSTRUCTION) AIR TUGGER, ALL TERRAIN TELESCOPING MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND SIMILAR MACHINES OVER THREE EIGHTHS | $43.14 | 35.20 | ENGI0158-039 collectively bargained (union) rate |
Official document: NY20260030 on SAM.gov.
NY20260031 rev 2 · Building, Heavy, Highway · Herkimer
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS:, BUILDING: GROUP C (HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS)) FORK LIFT, HIGH LIFT, LUL | $51.01 | 33.20 | ENGI0158-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B (HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS)) BACKHOE, (TRACTOR MOUNTED | $53.91 | 33.20 | ENGI0158-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, BUILDING: GROUP A (HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS)) SHOVEL, ALL BACKHOE (EXCE | $54.93 | 33.20 | ENGI0158-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP A(1): CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE. HERKIMER COUNTY (AREA E | $55.42 | 33.20 | ENGI0158-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING GROUP 3 COMPRESSOR (UP TO 500 C.F.), CONCRETE PAVE ROR MIXER (UNDER 16S), CONCRETE PAVEMENT SPREADERS AND FINISHERS (NOT AUTOMATED), CONVEYOR (O | $51.42 | 32.45 | ENGI0158-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING GROUP 2 ""A"" FRAME TRUCK, BLACKTOP PLANT (NON AUTOMATIC), ALL BACK DUMPS, BORING MACHINE, BULLDOZER, CAGEHOIST, CENTRAL MIX PLANT (NON AUTOMATE | $53.99 | 32.45 | ENGI0158-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING GROUP 1 AIR PLAKO, ASPHALT AND BLACKTOP ROLLER, AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT), AUTOMATED FINE GRADE MACHINE (CMI), BACKHOE, EL | $54.90 | 32.45 | ENGI0158-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 7 (HEAVY & HIGHWAY) MASTER MECHANIC HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOT | $58.91 | 33.55 | ENGI0158-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY & HIGHWAY) CRANES 49 TONS AND BELOW HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FA | $60.30 | 33.55 | ENGI0158-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY & HIGHWAY) CRANES 50 TONS AND OVER HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FAL | $61.80 | 33.55 | ENGI0158-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY & HIGHWAY) TOWER CRANES HERKIMER COUNTY (AREA EAST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTNOT | $63.30 | 33.55 | ENGI0158-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 (HEAVY & HIGHWAY) A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALL | $53.82 | 33.55 | ENGI0158-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 (HEAVY & HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL | $56.39 | 33.55 | ENGI0158-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 (HEAVY & HIGHWAY) ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT | $57.30 | 33.55 | ENGI0158-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 7 (HEAVY AND HIGHWAY) MASTER MECHANIC HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FO | $57.01 | 32.45 | ENGI0158-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY AND HIGHWAY) CRANES 49 TONS AND BELOW HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE | $57.90 | 32.45 | ENGI0158-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY AND HIGHWAY) CRANES 50 TONS AND OVER HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE F | $59.40 | 32.45 | ENGI0158-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY AND HIGHWAY) TOWER CRANES HERKIMER COUNTY (AREA WEST OF A LINE RUNNING NORTH AND SOUTH THROUGH THE RAILROAD STATION AT LITTLE FALLS) FOOTN | $60.90 | 32.45 | ENGI0158-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 (HEAVY AND HIGHWAY) A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BA | $51.42 | 32.45 | ENGI0158-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP | $53.99 | 32.45 | ENGI0158-022 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 (HEAVY AND HIGHWAY) ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEP | $54.90 | 32.45 | ENGI0158-022 collectively bargained (union) rate |
Official document: NY20260031 on SAM.gov.
NY20260032 rev 1 · Building, Heavy, Highway · Ontario
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 3 (BUILDING CONSTRUCTION) ANY COMBINATION (NOT TO EXCEED THREE (3) PIECES OF EQUIPMENT) COMPRESSORS �THREE (3) OR LESS, OR NOT TO EXCEED 1200 CFM C | $39.64 | 35.20 | ENGI0158-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING CONSTRUCTION) A-FRAME TRUCK, BACKFILLING MACHINE, BACKHOE -TRACTOR MOUNTED, BARBER GREEN AND SIMILAR TYPE MACHINES, BELT CRETE AND SIMI | $42.34 | 35.20 | ENGI0158-014 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING CONSTRUCTION) AIR TUGGER, ALL TERRAIN TELESCOPING MATERIAL HANDLER, CLAMSHELL, DRAGLINE, SHOVEL AND SIMILAR MACHINES OVER THREE EIGHTHS | $43.14 | 35.20 | ENGI0158-014 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS | $36.61 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN | $54.42 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST | $51.80 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR | $40.10 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC | $57.21 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ( | $54.68 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI | $40.79 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $58.43 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $55.38 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS | $41.26 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
Official document: NY20260032 on SAM.gov.
NY20260033 rev 1 · Highway · Yates
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS | $36.61 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN | $54.42 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST | $51.80 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR | $40.10 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC | $57.21 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ( | $54.68 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI | $40.79 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $58.43 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $55.38 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS | $41.26 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
Official document: NY20260033 on SAM.gov.
NY20260034 rev 2 · Building, Heavy, Highway · Orleans
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING/HEAVY AND HIGHWAY) AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4 | $39.14 | 35.40 | ENGI0017-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING/HEAVY AND HIGHWAY) AIR HOIST, ALL BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT S | $44.23 | 35.40 | ENGI0017-004 collectively bargained (union) rate |
Official document: NY20260034 on SAM.gov.
NY20260035 rev 2 · Heavy, Highway · Franklin
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT | $57.30 | 33.55 | ENGI0158-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL | $56.39 | 33.55 | ENGI0158-016 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | 33.55 | ENGI0158-016 collectively bargained (union) rate |
Official document: NY20260035 on SAM.gov.
NY20260036 rev 3 · Heavy, Highway · Cayuga
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, R | $55.85 | 33.40 | ENGI0158-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED) | $54.97 | 33.40 | ENGI0158-023 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | 33.40 | ENGI0158-023 collectively bargained (union) rate |
Official document: NY20260036 on SAM.gov.
NY20260037 rev 3 · Heavy, Highway · Otsego
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT | $57.30 | 33.55 | ENGI0158-028 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL | $56.39 | 33.55 | ENGI0158-028 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | 33.55 | ENGI0158-028 collectively bargained (union) rate |
Official document: NY20260037 on SAM.gov.
NY20260038 rev 3 · Heavy, Highway · Oswego
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, R | $55.85 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED) | $54.97 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
Official document: NY20260038 on SAM.gov.
NY20260039 rev 2 · Building, Heavy, Highway · Warren
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) BUILDING | $55.42 | 33.20 | ENGI0158-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING): GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR CO | $51.01 | 33.20 | ENGI0158-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING): GROUP B BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GR | $53.91 | 33.20 | ENGI0158-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING): GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL SWING), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADE | $54.93 | 33.20 | ENGI0158-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | 33.55 | ENGI0158-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL | $56.39 | 33.55 | ENGI0158-029 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT | $57.30 | 33.55 | ENGI0158-029 collectively bargained (union) rate |
Official document: NY20260039 on SAM.gov.
NY20260040 rev 2 · Highway · Seneca
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED) | $54.97 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, R | $55.85 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
Official document: NY20260040 on SAM.gov.
NY20260041 rev 1 · Highway · Wyoming
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN, CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN, CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4 OR LESS), COMPRESSORS: (ANY | $42.89 | 36.89 | ENGI0017-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT SPREADER OR PAVER, AUTOMATIC F | $47.39 | 36.89 | ENGI0017-006 collectively bargained (union) rate |
Official document: NY20260041 on SAM.gov.
NY20260042 rev 2 · Highway · Cortland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 3 | $51.69 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED) | $54.97 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, R | $55.85 | 33.40 | ENGI0158-020 collectively bargained (union) rate |
Official document: NY20260042 on SAM.gov.
NY20260044 rev 2 · Heavy, Highway · Wayne
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS | $41.26 | 34.85 | ENGI0158-036 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $55.38 | 35.75 | ENGI0158-036 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $58.43 | 35.00 | ENGI0158-036 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI | $40.79 | 34.85 | ENGI0158-036 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ( | $54.68 | 35.75 | ENGI0158-036 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC | $57.21 | 35.00 | ENGI0158-036 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR | $40.10 | 34.85 | ENGI0158-036 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST | $51.81 | 35.75 | ENGI0158-036 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN | $54.42 | 35.00 | ENGI0158-036 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS | $36.61 | 34.85 | ENGI0158-036 collectively bargained (union) rate |
Official document: NY20260044 on SAM.gov.
NY20260045 rev 2 · Building, Heavy, Highway · Tioga
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCKS OVER 5 TONS BUILDING H | $51.71 | 32.80 | ENGI0158-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPR | $46.54 | 32.80 | ENGI0158-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP B BACKHOES (RUBBER TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRA | $48.85 | 32.80 | ENGI0158-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BUILDING: GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE, FULL SWING), GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER | $49.31 | 32.80 | ENGI0158-007 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | 33.55 | ENGI0158-030 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL | $56.39 | 33.55 | ENGI0158-030 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT | $57.30 | 33.55 | ENGI0158-030 collectively bargained (union) rate |
Official document: NY20260045 on SAM.gov.
NY20260046 rev 3 · Heavy, Highway · Hamilton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS (BUILDING): GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL SWING), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADE | $54.93 | 33.20 | ENGI0158-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING): GROUP B BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GR | $53.91 | 33.20 | ENGI0158-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (BUILDING): GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR CO | $51.01 | 33.20 | ENGI0158-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) BUILDING | $55.42 | 33.20 | ENGI0158-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT | $57.30 | 33.55 | ENGI0158-031 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PL | $56.39 | 33.55 | ENGI0158-031 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 | $53.82 | 33.55 | ENGI0158-031 collectively bargained (union) rate |
Official document: NY20260046 on SAM.gov.
NY20260047 rev 2 · Highway · Allegany
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS | $36.61 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN | $54.42 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST | $51.80 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPR | $40.10 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLAC | $57.21 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT ( | $54.68 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOI | $40.79 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $58.43 | 35.00 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP | $55.38 | 35.75 | ENGI0158-024 collectively bargained (union) rate |
| OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAIS | $41.26 | 34.85 | ENGI0158-024 collectively bargained (union) rate |
Official document: NY20260047 on SAM.gov.
NY20260048 rev 1 · Heavy · Allegany, Cattaraugus, Cortland, Schuyler, Seneca, Steuben and 3 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS:: PAVERS (CATTARAUGUS AND WYOMING COUNTIES) A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DA | $47.39 | 36.89 | ENGI0017-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: PAVERS (CORTLAND, SENECA AND TOMPKINS COUNTIES) A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMA | $40.80 | 25.15 | ENGI0545-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: BULLDOZERS | $22.28 | 11.79 | SUNY2000-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: BACKHOES | $22.08 | 11.31 | SUNY2000-002 DOL wage survey rate |
| POWER EQUIPMENT OPERATORS: (TRACTORS) | $20.57 | 10.95 | SUNY2000-002 DOL wage survey rate |
Official document: NY20260048 on SAM.gov.
Showing the first 400 of 571 published heavy equipment operator rates. The rest are on the individual determination pages linked above, each of which carries the full official text.
Where to go next
Heavy Equipment Operator rates in every state · New York prevailing wage and state law · New York determinations by county · pay calculator
Other trades in New York
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Plasterer · Glazier · Insulator (Heat & Frost) · Millwright · Boilermaker · Elevator Constructor · Sprinkler Fitter · Tile Setter · Tile Finisher · Floor Layer · Line Constructor / Lineman