Heavy Equipment Operator prevailing wage rates in Illinois
Federal Davis-Bacon rates published in 33 active determinations, 2026
- Active federal Davis-Bacon determinations for Illinois publish 248 heavy equipment operator classification rates, across 33 determinations covering 102 counties.
- Those published base rates run from $30.05 to $64.80 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in Illinois: .
This page collects every classification in Illinois's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
IL20260001 rev 5 · Building · Adams, Bond, Boone, Brown, Bureau, Calhoun and 40 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 4 OILERS; HOISTS; INSIDE ELEVATORS; PUSH BUTTON AUTOMATIC DOORS (BOONE, CARROLL, DE KALB, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE, AND WINNEBA | $51.60 | 51.05 | ENGI0150-003 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 AIR COMPRESSOR-SMALL 185 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 185; COMBINATION-SMALL EQUIPMENT OPERATOR; | $53.60 | 51.05 | ENGI0150-003 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BOBCAT (OVER 3/4 CU YD); BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORK | $56.05 | 51.05 | ENGI0150-003 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*: BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER A | $56.75 | 51.05 | ENGI0150-003 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 4 BOBCAT/SKID STEER LOADER; BOOM TRUCKS (RESIDENTIAL); BRICK FORKLIFT; HOISTS, INSIDE ELEVATORS PUSH BUTTON WITH AUTOMATIC DOORS; OILERS (BUREAU (E | $57.40 | 51.00 | ENGI0150-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 AIR COMPRESSOR, SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT; AIR COMPRESSOR, LARGE OVER 250; COMBINATION SMALL EQUIPMENT OPERATOR | $59.15 | 51.00 | ENGI0150-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BOILER; BROOM, ALL POWER PROPELLED; BULLDOZERS; CONCRETE MIXER 2 BAG AND OVER; CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SH | $61.70 | 51.00 | ENGI0150-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*; BATCH PLANT*; BENOTO (REQUIRES TWO ENGINEERS); BOILER | $63.00 | 51.00 | ENGI0150-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN | $37.80 | 41.25 | ENGI0150-019 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMIL | $38.85 | 41.25 | ENGI0150-019 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER | $41.50 | 41.25 | ENGI0150-019 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (HENRY (WESTERN HALF), MERCER, ROCK ISLAND, AND WHITESIDE (WES | $43.50 | 41.25 | ENGI0150-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 09 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONRO | $49.70 | 39.10 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 10 Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner. (BOND, CALHOUN, CLINTON, GREENE, JERSEY | $45.25 | 34.95 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 08 Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MA | $49.80 | 36.90 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 07 Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONRO | $49.50 | 36.90 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONRO | $51.45 | 39.10 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES) | $43.15 | 39.10 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER | $43.15 | 39.10 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER | $43.09 | 39.10 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES) | $47.57 | 39.10 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLA | $48.70 | 39.10 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES) | $51.70 | 39.10 | ENGI0520-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC (BOND, CALHOUN, CLINTON, GREENE, JERSEY, MACOUPIN, MONROE, MONTGOMERY, RANDOLPH, AND WASHINGTON COUNTIES) | $50.70 | 39.10 | ENGI0520-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP(S); LIGHT PLANTS; GENERATORS; WELDING MACHINES; PO | $38.03 | 43.42 | ENGI0649-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE (AND SIMILAR TYPES); PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS; JEEPS W/D | $44.09 | 43.42 | ENGI0649-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES (CHERRY PICKERS) 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OILER; MECHANIC | $47.79 | 43.42 | ENGI0649-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. (ADAMS, BROWN, CASS, LOGAN, MENARD, MORGAN, PIKE | $42.32 | 28.75 | ENGI0965-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIXERS (EXCEPT PLANT, PAVER, TOWER) FIREMENT, GENERATORS | $34.30 | 28.75 | ENGI0965-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN; BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONCRETE FINSHING MACHINE; CONCRE | $38.18 | 28.75 | ENGI0965-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONTRETE; ATHEY LOADERS; CABLEWAYS | $40.71 | 28.75 | ENGI0965-001 collectively bargained (union) rate |
Official document: IL20260001 on SAM.gov.
IL20260002 rev 4 · Building · Alexander, Champaign, Christian, Clark, Clay, Coles and 35 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: RIVER Class 2 | $36.78 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: RIVER Class 1 | $40.23 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: RIVER (Class 2) | $36.78 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: RIVER (Class 1) | $40.23 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, CLASS C: AIR COMPRESSOR (220 CFM OR OVER) ONE, AIR TRACK DRILL ONE, AUTOMATIC BIN, BELT DRAG MACHINE, BULK CEMENT PLANT W/BUILT-IN COMPRESSOR RUNNING OFF | $30.83 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, CLASS B: OILERS CLASSIFIED AS ASSISTANT OPERATORS, AIR TRACK DRILL/COMPRESSOR, ALL MACHINES USED TO SWEEP, CLEAN, BROOM OR REMOVE DEBRIS OR SNOW, ANY TYP | $38.23 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, CLASS A: ALL OFF ROAD MATERIAL HAULING EQUIPMENT, ALL TERRAIN CRANE, ARTICULATED DUMP, ASPHALT MACHINE SPREADER, ASPHALT PLANT ASSISTANT OPERATOR, ASPHAL | $40.13 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER. FAYETTE, JEFFERSON, MARION, AND PERRY COUN | $49.70 | 39.10 | ENGI0520-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT FAYETTE, JEFFERSON, MARION, AND PERRY COUNTIES | $51.45 | 39.10 | ENGI0520-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS FAYETTE, JEFFERSON, MARION, AND PERRY COUNTIES | $43.15 | 39.10 | ENGI0520-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER | $43.15 | 39.10 | ENGI0520-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER | $43.09 | 39.10 | ENGI0520-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS FAYETTE, JEFFERSON, MARION, AND PERRY COUNTIES | $47.57 | 39.10 | ENGI0520-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLA | $48.70 | 39.10 | ENGI0520-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT (FAYETTE, JEFFERSON, MARION, AND PERRY COUNTIES) | $51.70 | 39.10 | ENGI0520-011 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC (FAYETTE, JEFFERSON, MARION, AND PERRY COUNTIES) | $50.70 | 39.10 | ENGI0520-011 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SEL | $30.05 | 26.00 | ENGI0841-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM | $45.15 | 26.00 | ENGI0841-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SEL | $30.05 | 26.00 | ENGI0841-006 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM | $45.15 | 26.00 | ENGI0841-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE (CHRISTIAN, DE WITT, PIATT, AND SHELBY COUNTIES) | $42.32 | 28.75 | ENGI0965-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS (EXCEPT PLANT,PAVER,TOWER) FIREMENT, GENERATORS; G | $34.30 | 28.75 | ENGI0965-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONCRETE FINSHING MACHINE; CONCRET | $38.18 | 28.75 | ENGI0965-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONTRETE; ATHEY LOADERS; CABLEWAYS | $40.71 | 28.75 | ENGI0965-005 collectively bargained (union) rate |
Official document: IL20260002 on SAM.gov.
IL20260003 rev 1 · Building, Residential · Peoria, Tazewell
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP(S); LIGHT PLANTS; GENERATORS; WELDING MACHINES; PO | $38.03 | 43.42 | ENGI0649-003 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE (AND SIMILAR TYPES); PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS; JEEPS W/D | $44.09 | 43.42 | ENGI0649-003 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES (CHERRY PICKERS) 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OILER; MECHANIC | $47.79 | 43.42 | ENGI0649-003 collectively bargained (union) rate |
Official document: IL20260003 on SAM.gov.
IL20260004 rev 2 · Building, Residential · Sangamon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS (EXCEPT PLANT,PAVER,TOWER) FIREMENT, GENERATORS; G | $34.30 | 28.75 | ENGI0965-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONCRETE FINSHING MACHINE; CONCRET | $38.18 | 28.75 | ENGI0965-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONTRETE; ATHEY LOADERS; CABLEWAYS | $40.71 | 28.75 | ENGI0965-003 collectively bargained (union) rate |
Official document: IL20260004 on SAM.gov.
IL20260005 rev 1 · Building, Residential · Macon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIERS (EXCEPT PLANT, PAVER, TOWER) FIREMENT, GENERATORS; | $34.30 | 28.75 | ENGI0965-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN; BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONCRETE FINSHING MACHINE; CONCRE | $38.18 | 28.75 | ENGI0965-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONTRETE; ATHEY LOADERS; CABLEWAYS | $40.71 | 28.75 | ENGI0965-004 collectively bargained (union) rate |
Official document: IL20260005 on SAM.gov.
IL20260006 rev 1 · Building, Residential · Kankakee
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $59.20 | 51.00 | ENGI0150-026 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATIO | $60.95 | 51.00 | ENGI0150-026 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL) BOBCAT (OVER 3/4 CU YD); BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER | $63.50 | 51.00 | ENGI0150-026 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRE | $64.80 | 51.00 | ENGI0150-026 collectively bargained (union) rate |
Official document: IL20260006 on SAM.gov.
IL20260007 rev 2 · Building, Residential · Madison, St Clair
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $49.70 | 39.10 | ENGI0520-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT | $51.45 | 39.10 | ENGI0520-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS | $43.15 | 39.10 | ENGI0520-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER | $43.15 | 39.10 | ENGI0520-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER | $43.09 | 39.10 | ENGI0520-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS | $47.57 | 39.10 | ENGI0520-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLA | $48.70 | 39.10 | ENGI0520-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT | $51.70 | 39.10 | ENGI0520-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC | $50.70 | 39.10 | ENGI0520-003 collectively bargained (union) rate |
Official document: IL20260007 on SAM.gov.
IL20260008 rev 2 · Building, Residential · Du Page, Grundy, Kane, Kendall, Lake, McHenry and 1 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $59.20 | 51.00 | ENGI0150-026 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATIO | $60.95 | 51.00 | ENGI0150-026 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL) BOBCAT (OVER 3/4 CU YD); BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER | $63.50 | 51.00 | ENGI0150-026 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRE | $64.80 | 51.00 | ENGI0150-026 collectively bargained (union) rate |
Official document: IL20260008 on SAM.gov.
IL20260009 rev 2 · Building, Heavy, Highway, Residential · Cook
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $59.20 | 51.00 | ENGI0150-006 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL CONSTRUCTION) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 25 | $60.95 | 51.00 | ENGI0150-006 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCAT (OVER 3/4 CU YD); BOILERS; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); | $63.50 | 51.00 | ENGI0150-006 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL CONSTRUCTION) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; B | $64.80 | 51.00 | ENGI0150-006 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 5 (HEAVY AND HIGHWAY CONSTRUCTION) BOBCATS (ALL); BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING | $57.80 | 51.00 | ENGI0150-025 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 4 (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; | $59.00 | 51.00 | ENGI0150-025 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO | $60.40 | 51.00 | ENGI0150-025 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) BATCH PLANT*; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION | $62.45 | 51.00 | ENGI0150-025 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/ G | $63.00 | 51.00 | ENGI0150-025 collectively bargained (union) rate |
Official document: IL20260009 on SAM.gov.
IL20260010 rev 1 · Residential · Winnebago
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 2 BULLDOZERS; GREASER ENGINEER; FRONT END LOADERS UNDER 2 1/4 CU YD; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES | $56.05 | 51.05 | ENGI0150-027 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: GROUP 1 MECHANIC; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*: COMBINATION BACKHOE FRONT ENDLOADER MACHINE; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE | $56.75 | 51.05 | ENGI0150-027 collectively bargained (union) rate |
Official document: IL20260010 on SAM.gov.
IL20260011 rev 2 · Heavy, Highway · Boone, De Kalb, Du Page, Kane, Kendall, Lake and 2 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 185 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 185; ASPHALT SPREADER BACKEND MAN; COM | $53.30 | 51.05 | ENGI0150-015 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE | $54.75 | 51.05 | ENGI0150-015 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT; BITUMINOUS MIXER; BOBCATS OVER .75 CU YD; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE | $56.05 | 51.05 | ENGI0150-015 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT SPREADER; ASPHALT SILO TENDER; AUTOGRADER, GOMACO OR SIMILAR; BELT LOADER; CAISSON | $56.60 | 51.05 | ENGI0150-015 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS (ALL); BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING (DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | $57.80 | 51.00 | ENGI0150-024 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPE | $59.00 | 51.00 | ENGI0150-024 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE | $60.40 | 51.00 | ENGI0150-024 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT*; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHIN | $62.45 | 51.00 | ENGI0150-024 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/ GOMACO OR SIMILAR; ABG PAVER*, BAC | $63.00 | 51.00 | ENGI0150-024 collectively bargained (union) rate |
Official document: IL20260011 on SAM.gov.
IL20260012 rev 2 · Heavy, Highway · Bureau, Carroll, Henry, Jo Daviess, Lee, Ogle and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT SPREADER; ASPHALT SILO TENDER; AUTOGRADER, GOMACO OR SIMILAR; BELT LOADER; CAISSON | $56.60 | 51.05 | ENGI0150-004 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT; BITUMINOUS MIXER; BOBCATS OVER .75 CU YD; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE | $56.05 | 51.05 | ENGI0150-004 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE | $54.75 | 51.05 | ENGI0150-004 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 185 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 185; ASPHALT SPREADER BACKEND MAN; COM | $53.30 | 51.05 | ENGI0150-004 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 5 OILERS (CARROLL, JO DAVIESS, LEE, OGLE, STEPHENSON, WHITESIDE (EASTERN HALF) AND WINNEBAGO COUNTIES) | $50.85 | 51.05 | ENGI0150-004 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*; ASPHALT SPREADER; AUTOGRADER; ABG PAVER*; BACKHOES WITH CAISSON | $63.00 | 51.00 | ENGI0150-016 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE | $62.45 | 51.00 | ENGI0150-016 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE | $60.40 | 51.00 | ENGI0150-016 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPE | $59.00 | 51.00 | ENGI0150-016 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS (ALL); BRICK FORKLIFTS; DIRECTIONAL BORING MACHINE LOCATOR; OILERS (BUREAU COUNTY (THE PORTION LYING EAST AND NORTH OF HIGHWAY 26 FROM TH | $57.80 | 51.00 | ENGI0150-016 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (HENRY (WESTERN HALF), ROCK ISLAND, AND WHITESIDE (WESTERN HAL | $43.50 | 41.25 | ENGI0150-020 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER | $37.80 | 41.25 | ENGI0150-020 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLIN | $47.79 | 43.42 | ENGI0649-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORING MACHINE; P-H ONE PASS SOIL C | $44.09 | 43.42 | ENGI0649-005 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON | $38.03 | 43.42 | ENGI0649-005 collectively bargained (union) rate |
Official document: IL20260012 on SAM.gov.
IL20260013 rev 1 · Heavy, Highway · Ford, Grundy, Iroquois, Kankakee, La Salle, Livingston and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 5 BOBCATS (ALL); BRICK FORKLIFTS; DIRECTIONAL BORING MACHINE LOCATOR; OILERS (GRUNDY, KANKAKEE, LA SALLE, LIVINGSTON, AND PUTNAM (EAST AND SOUTH OF | $57.80 | 51.00 | ENGI0150-007 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPE | $59.00 | 51.00 | ENGI0150-007 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE | $60.40 | 51.00 | ENGI0150-007 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BATCH PLANT; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE | $62.45 | 51.00 | ENGI0150-007 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*; ASPHALT SPREADER; AUTOGRADER; ABG PAVER*; BACKHOES WITH CAISSON | $63.00 | 51.00 | ENGI0150-007 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON | $38.03 | 43.42 | ENGI0649-004 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORING MACHINE; P-H ONE PASS SOIL C | $44.09 | 43.42 | ENGI0649-004 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLIN | $47.79 | 43.42 | ENGI0649-004 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SEL | $30.05 | 26.00 | ENGI0841-002 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM | $45.15 | 26.00 | ENGI0841-002 collectively bargained (union) rate |
Official document: IL20260013 on SAM.gov.
IL20260014 rev 2 · Heavy, Highway · Fulton, Hancock, Henderson, Knox, McDonough, Mercer and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (MERCER COUNTY) | $43.50 | 41.25 | ENGI0150-021 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER | $41.50 | 41.25 | ENGI0150-021 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMIL | $38.85 | 41.25 | ENGI0150-021 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN | $37.80 | 41.25 | ENGI0150-021 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLIN | $47.79 | 43.42 | ENGI0649-002 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORING MACHINE; P-H ONE PASS SOIL C | $44.09 | 43.42 | ENGI0649-002 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON | $38.03 | 43.42 | ENGI0649-002 collectively bargained (union) rate |
Official document: IL20260014 on SAM.gov.
IL20260015 rev 2 · Heavy, Highway · Adams, Brown, Cass, Champaign, Christian, Clark and 18 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLIN | $47.79 | 43.42 | ENGI0649-006 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORING MACHINE; P-H ONE PASS SOIL C | $44.09 | 43.42 | ENGI0649-006 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON | $38.03 | 43.42 | ENGI0649-006 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM | $45.15 | 26.00 | ENGI0841-003 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SEL | $30.05 | 26.00 | ENGI0841-003 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONTRETE; ATHEY LOADERS; CABLEWAYS | $47.21 | 30.20 | ENGI0965-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONCRETE FINSHING MACHINE; CONCRET | $41.88 | 30.20 | ENGI0965-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 3 AIR COMPRESSOR, TRACK OR SELF-PROPELLED; BULK CEMENT BATCHING- PLANTS; CONVEYORS; CONCRETE MIXERS (EXCEPT PLANT, PAVER, TOWER) FIREMENT, GENERATORS | $33.67 | 30.20 | ENGI0965-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 4 LATTICE BOOM CRAWLER CRANE, LATTICE BOOM TRUCK CRANE, TELESCOPIC TRUCK MOUNTED CRANE, TOWER CRANE. (ADAMS, BROWN, CASS, CHRISTIAN, DE WITT, LOGAN, | $48.81 | 30.20 | ENGI0965-002 collectively bargained (union) rate |
Official document: IL20260015 on SAM.gov.
IL20260016 rev 2 · Heavy, Highway · Alexander, Clay, Crawford, Edwards, Effingham, Fayette and 22 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, CLASS A: ALL OFF ROAD MATERIAL HAULING EQUIPMENT, ALL TERRAIN CRANE, ARTICULATED DUMP, ASPHALT MACHINE SPREADER, ASPHALT PLANT ASSISTANT OPERATOR, ASPHAL | $40.13 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, CLASS B: OILERS CLASSIFIED AS ASSISTANT OPERATORS, AIR TRACK DRILL/COMPRESSOR, ALL MACHINES USED TO SWEEP, CLEAN, BROOM OR REMOVE DEBRIS OR SNOW, ANY TYP | $38.23 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, CLASS C: AIR COMPRESSOR (220 CFM OR OVER) ONE, AIR TRACK DRILL ONE, AUTOMATIC BIN, BELT DRAG MACHINE, BULK CEMENT PLANT W/BUILT-IN COMPRESSOR RUNNING OFF | $30.83 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: RIVER Class 1: All Off Road Material Hauling Equipment, All Terrain Crane, All Power Boat Operators, Articulated Dump, Asphalt Machine Spreader, Asphalt | $40.23 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: RIVER Class 2: Assistant Operators required on All terrain cherry picker w/over 40 ton lifting capacity, Crane, Deckhand on all rivers, lakes, and tribut | $36.78 | 32.00 | ENGI0318-001 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 03 AIR COMPRESSORS (ONE), WATER PUMPS, REGARDLESS OF SIZE (ONE), WATER-BLASTERS (ONE), WELDING MACHINE (ONE), MIXERS (ONE BAG), CONVEYOR (ONE), SIPHO | $41.59 | 39.10 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) | $49.20 | 39.10 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) | $50.20 | 39.10 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLA | $47.20 | 39.10 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES | $46.07 | 39.10 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMAN ON WHIRLIES AND HEAVY EQUIPMENT OILERS, TRUCK CRANES, DREDGES, MONIGANS, LARGE CRANES - (OVER 65-TON RATED CAPACITY) CONCRETE PLANT OILER | $41.65 | 39.10 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES | $41.65 | 39.10 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIE | $49.75 | 39.10 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 7: Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIE | $45.30 | 34.95 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 8: Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes (FAYETTE, JEFFERSON, MARION, PERRY, AND RAN | $45.60 | 34.95 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER. (FAYETTE, JEFFERSON, MARION, PERRY, AND RA | $48.20 | 39.10 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 10: Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner. (FAYETTE, JEFFERSON, MARION, PERRY, AN | $46.75 | 34.95 | ENGI0520-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORGROUP 1: Cranes, Draglines, Shovels, Skimmer Scoops, Clamshells or Derrick Boats, Pile Drivers, Crane-Type Backhoes, Asphalt Plant Operators, Concrete Plant | $42.45 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 10 CERTIFIED CRANE OPERATORS 17.5 TONS AND ABOVE, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER (FAYETTE, JEFFERSON, MARION, PERRY, AND R | $46.75 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONST | $44.45 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY C | $45.45 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY | $41.32 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER | $36.84 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER | $43.45 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIES) INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION | $44.45 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIE | $45.00 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT (FAYETTE, JEFFERSON, MARION, PERRY, AND RANDOLPH COUNTIE | $45.30 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES (FAYETTE, JEFFERSON, MARION, PERRY, AND RAN | $45.60 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER. (FAYETTE, JEFFERSON, MARION, PERRY, AND RA | $46.25 | 34.95 | ENGI0520-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM M | $45.15 | 26.00 | ENGI0841-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SELF | $30.05 | 26.00 | ENGI0841-004 collectively bargained (union) rate |
Official document: IL20260016 on SAM.gov.
IL20260017 rev 5 · Heavy, Highway · Bond, Calhoun, Clinton, Greene, Jersey, Macoupin and 5 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 10 CERTIFIED CRANE OPERATORS 17.5 TONS AND ABOVE, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $46.75 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC | $44.45 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT | $45.45 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 11 MASTER MECHANIC | $44.45 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR, INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK: GROUP 12 LICENSED BOAT PILOT | $45.45 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLA | $42.45 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLA | $42.45 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS | $41.32 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $41.32 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER | $36.84 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSORS (ONE), WATER PUMPS, REGARDLESS OF SIZE (ONE), WATER-BLASTERS (ONE), WELDING MACHINE (ONE), MIXERS (ONE BAG), CONVEYOR (ONE), SIPH | $36.84 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMAN ON WHIRLIES AND HEAVY EQUIPMENT OILERS, TRUCK CRANES, DREDGES, MONIGANS, LARGE CRANES - (OVER 65-TON RATED CAPACITY) CONCRETE PLANT OILER | $43.45 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER | $43.45 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS | $44.45 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK | $44.45 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT | $45.00 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITE | $45.00 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT | $45.30 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES | $45.60 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER INCLUDING BUILDING CONSTRUCTION ON HEAVY IN | $46.25 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $46.25 | 34.95 | ENGI0520-005 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 01 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $47.20 | 39.10 | ENGI0520-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 02 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $46.07 | 39.10 | ENGI0520-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 03 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $41.59 | 39.10 | ENGI0520-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 04 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $41.65 | 39.10 | ENGI0520-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 05 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $41.65 | 39.10 | ENGI0520-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 06 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $49.75 | 39.10 | ENGI0520-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 09 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $48.20 | 39.10 | ENGI0520-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 11 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $49.20 | 39.10 | ENGI0520-012 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 12 (INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES & HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK) | $50.20 | 39.10 | ENGI0520-012 collectively bargained (union) rate |
Official document: IL20260017 on SAM.gov.
IL20260020 rev 2 · Building, Heavy, Highway, Residential · Boone, Cook, De Kalb, Du Page, Grundy, Henry and 13 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATORS- BUILDING AND HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR EXCLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF | $37.55 | 9.50 | ENGI0150-013 collectively bargained (union) rate |
| OPERATORS- HIGHWAY CONSTRUCTION (LANDSCAPE WORK): THE LANDSCAPE WORK FOR THE LANDSCAPE EQUIPMENT OPERATOR ECLUDES THE PREPARATION OF SUB-GRADE PRIOR TO APPLICATION OF FINISH LANDSC | $37.55 | 9.50 | ENGI0150-023 collectively bargained (union) rate |
Official document: IL20260020 on SAM.gov.
IL20260025 rev 2 · Residential · Henry
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN | $37.80 | 41.25 | ENGI0150-022 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMIL | $38.85 | 41.25 | ENGI0150-022 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER | $41.50 | 41.25 | ENGI0150-022 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (HENRY COUNTY (WESTERN HALF)) | $43.50 | 41.25 | ENGI0150-022 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP(S); LIGHT PLANTS; GENERATORS; WELDING MACHINES; PO | $38.03 | 43.42 | ENGI0649-007 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE (AND SIMILAR TYPES); PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS; JEEPS W/D | $44.09 | 43.42 | ENGI0649-007 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES (CHERRY PICKERS) 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OILER; MECHANIC | $47.79 | 43.42 | ENGI0649-007 collectively bargained (union) rate |
Official document: IL20260025 on SAM.gov.
IL20260030 rev 2 · Residential · Jersey
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 1 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT | $40.95 | 34.95 | ENGI0520-007 collectively bargained (union) rate |
Official document: IL20260030 on SAM.gov.
IL20260039 rev 1 · Residential · Shelby
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE | $40.71 | 28.75 | ENGI0965-007 collectively bargained (union) rate |
Official document: IL20260039 on SAM.gov.
IL20260040 rev 2 · Residential · Woodford
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP(S); LIGHT PLANTS; GENERATORS; WELDING MACHINES; PO | $38.03 | 43.42 | ENGI0649-008 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE (AND SIMILAR TYPES); PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS; JEEPS W/D | $44.09 | 43.42 | ENGI0649-008 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES (CHERRY PICKERS) 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OILER; MECHANIC | $47.79 | 43.42 | ENGI0649-008 collectively bargained (union) rate |
Official document: IL20260040 on SAM.gov.
IL20260041 rev 2 · Residential · McLean
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 3 AIR COMPRESSOR; HERMAN NELSON HEATER, DRAVO, WARNER, SILENT GLO, AND SIMILAR TYPES; WATER PUMP(S); LIGHT PLANTS; GENERATORS; WELDING MACHINES; PO | $38.03 | 43.42 | ENGI0649-009 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: GROUP 2 DINKEYS; POWER LAUNCHES; PH ONE-PASS SOIL-CEMENT MACHINE (AND SIMILAR TYPES); PUGMILL WITH PUMP; BACKFILLERS; EUCLID LOADER; FORKLIFTS; JEEPS W/D | $44.09 | 43.42 | ENGI0649-009 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: GROUP 1 OVERHEAD CRANES; GRADALL; ALL ROUGH TERRAIN HYDRAULIC CRANES (CHERRY PICKERS) 91,000 LBS GROSS VEHICLE WEIGHT AND OVER REQUIRE AN OILER; MECHANIC | $47.79 | 43.42 | ENGI0649-009 collectively bargained (union) rate |
Official document: IL20260041 on SAM.gov.
IL20260047 rev 2 · Residential · Menard
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT BOOSTER & HEATER; ASPHALT DISTRIBUTOR; ASPHALT PLANT FIREMAN;BUILDING ELEVATOR; BULL FLOAT OR FLEXPLANE; CONCRETE FINSHING MACHINE; CONCRET | $38.18 | 28.75 | ENGI0965-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 1 ASPHALT PLANT ENGINEER; ASPHALT SCREED MAN; APSCO CONCRETE SPREADER; ASPHALT PAVER; ASPHALT ROLLER ON BITUMINOUS CONTRETE; ATHEY LOADERS; CABLEWAYS | $40.71 | 28.75 | ENGI0965-006 collectively bargained (union) rate |
Official document: IL20260047 on SAM.gov.
IL20260048 rev 2 · Residential · Rock Island
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: CLASS 3- WATER PUMPS | $37.80 | 41.25 | ENGI0150-036 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: CLASS 2- FIREMEN AND PUMP OPERATORS AT ASPHALT PLANTS; FORM GRADER WITH ROLLER ON EARTH; SELF-PROPELLED ROLLER OR COMPACTOR (OTHER THAN PROVIDED FOR ABOV | $38.85 | 41.25 | ENGI0150-036 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: CLASS 1(B)- CONCRETE PAVER, SLIP FORM PAVER, CONCRETE PUMPS; ENDLOADER, ELEVATING GRADER; POWER BLADE, PULLING ELEVATING GRADERS OR POWER BLADES; TRACTOR | $41.50 | 41.25 | ENGI0150-036 collectively bargained (union) rate |
Official document: IL20260048 on SAM.gov.
IL20260049 rev 2 · Residential · Montgomery
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $44.75 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES | $44.10 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT | $43.80 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT | $43.50 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 05 OILERS | $42.95 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER | $41.95 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER | $35.34 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 02 ASSISTANT OPERATORS | $39.82 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLA | $40.95 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 12 LICENSED BOAT PILOT | $43.95 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 11 MASTER MECHANIC | $42.95 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR GROUP 10 CERTIFIED CRANE OPERATORS 17.5 TONS AND ABOVE, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $45.25 | 34.95 | ENGI0520-006 collectively bargained (union) rate |
Official document: IL20260049 on SAM.gov.
IL20260053 rev 1 · Residential · Boone
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 2 BULLDOZERS; GREASER ENGINEER; FRONT END LOADERS UNDER 2 1/4 CU YD; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES | $56.05 | 51.05 | ENGI0150-027 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: GROUP 1 MECHANIC; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*: COMBINATION BACKHOE FRONT ENDLOADER MACHINE; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE | $56.75 | 51.05 | ENGI0150-027 collectively bargained (union) rate |
Official document: IL20260053 on SAM.gov.
IL20260055 rev 1 · Residential · Ogle
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 2 BULLDOZERS; GREASER ENGINEER;HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; ROLLERS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES | $56.05 | 51.05 | ENGI0150-031 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT, GROUP 1 BACKHOES WITH CAISSON ATTACHMENT*: COMBINATION BACKHOE FRONT ENDLOADER CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CON | $56.75 | 51.05 | ENGI0150-031 collectively bargained (union) rate |
Official document: IL20260055 on SAM.gov.
IL20260057 rev 2 · Residential · Monroe
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 1 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT | $40.95 | 34.95 | ENGI0520-009 collectively bargained (union) rate |
Official document: IL20260057 on SAM.gov.
IL20260058 rev 1 · Residential · Champaign
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SEL | $30.05 | 26.00 | ENGI0841-007 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: GROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM | $45.15 | 26.00 | ENGI0841-007 collectively bargained (union) rate |
Official document: IL20260058 on SAM.gov.
IL20260059 rev 1 · Residential · Christian
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE | $40.71 | 28.75 | ENGI0965-007 collectively bargained (union) rate |
Official document: IL20260059 on SAM.gov.
IL20260061 rev 1 · Residential · Clinton
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 1 ROLLER; CONCRETE PAVER; CONCRETE BREAKERS & PUMPS; CEMENT PUMPS; MOTOR GRADERS OR PUSHCATS; ENDLOADERS POWER BLADE OR ELEVATING GRADERS; WATER PUMP | $40.95 | 34.95 | ENGI0520-008 collectively bargained (union) rate |
Official document: IL20260061 on SAM.gov.
IL20260065 rev 1 · Residential · De Kalb
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 2 BULLDOZERS; GREASER ENGINEER; FRONT END LOADERS UNDER 2 1/4 CU YD; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES | $56.05 | 51.05 | ENGI0150-027 collectively bargained (union) rate |
| OPERATOR: POWER EQUIPMENT: GROUP 1 MECHANIC; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*: COMBINATION BACKHOE FRONT ENDLOADER MACHINE; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE | $56.75 | 51.05 | ENGI0150-027 collectively bargained (union) rate |
Official document: IL20260065 on SAM.gov.
Where to go next
Heavy Equipment Operator rates in every state · Illinois prevailing wage and state law · Illinois determinations by county · pay calculator
Other trades in Illinois
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Plasterer · Glazier · Insulator (Heat & Frost) · Millwright · Boilermaker · Sprinkler Fitter · Piledriver · Tile Setter · Tile Finisher · Line Constructor / Lineman · Traffic Control / Striping