Prevailing Wage Index
HomeTradesCarpenter › New Jersey

Carpenter prevailing wage rates in New Jersey

Federal Davis-Bacon rates published in 60 active determinations, 2026

The official source: binding Davis-Bacon and Service Contract Act wage determinations are published by the U.S. Department of Labor at SAM.gov Wage Determinations. This site indexes them and links every determination to its official document - the determination incorporated into a contract governs.

This page collects every classification in New Jersey's active federal determinations that is a form of carpenter work (rough and finish carpentry, including form work) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.

Published rates by determination

NJ20260001 rev 2 · Highway · Atlantic, Burlington, Camden, Cape May, Cumberland, Gloucester and 4 more

Classification as publishedBase rateFringesRate schedule
CARPENTER$57.4234.02CARP0006-005
collectively bargained (union) rate

Official document: NJ20260001 on SAM.gov.

NJ20260002 rev 2 · Highway · Bergen, Essex, Hudson, Hunterdon, Middlesex, Morris and 5 more

Classification as publishedBase rateFringesRate schedule
CARPENTER$57.4234.02CARP0006-008
collectively bargained (union) rate

Official document: NJ20260002 on SAM.gov.

NJ20260005 rev 1 · Residential · Atlantic

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDES DRYALL HANGING)$48.2711.38CARP0006-001
collectively bargained (union) rate

Official document: NJ20260005 on SAM.gov.

NJ20260006 rev 1 · Residential · Bergen

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDES DRYALL HANGING)$48.2711.38CARP0006-001
collectively bargained (union) rate
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$15.916.36SUNJ2004-044
DOL wage survey rate

Official document: NJ20260006 on SAM.gov.

NJ20260007 rev 2 · Residential · Burlington

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDES DRYWALL HANGING)$48.275.79CARP0006-001
collectively bargained (union) rate

Official document: NJ20260007 on SAM.gov.

NJ20260008 rev 1 · Residential · Camden

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDES DRYWALL HANGING)$48.2711.38CARP0006-001
collectively bargained (union) rate

Official document: NJ20260008 on SAM.gov.

NJ20260009 rev 1 · Residential · Cape May

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDES DRYALL HANGING)$48.2711.38CARP0006-001
collectively bargained (union) rate

Official document: NJ20260009 on SAM.gov.

NJ20260010 rev 1 · Residential · Cumberland

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDES DRYWALL HANGING)$48.2711.38CARP0006-001
collectively bargained (union) rate

Official document: NJ20260010 on SAM.gov.

NJ20260011 rev 1 · Residential · Essex

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDES DRYWALL HANGING)$48.2711.38CARP0006-001
collectively bargained (union) rate

Official document: NJ20260011 on SAM.gov.

NJ20260013 rev 1 · Residential · Hudson

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDES DRYWALL HANGING)$48.2711.38CARP0006-001
collectively bargained (union) rate
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$15.916.36SUNJ2004-051
DOL wage survey rate

Official document: NJ20260013 on SAM.gov.

NJ20260014 rev 1 · Residential · Mercer

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDES DRYWALL HANGING)$48.2711.38CARP0006-001
collectively bargained (union) rate

Official document: NJ20260014 on SAM.gov.

NJ20260015 rev 1 · Residential · Monmouth

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDES DRYWALL HANGING)$48.2711.38CARP0006-001
collectively bargained (union) rate
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$15.602.46SUNJ2004-053
DOL wage survey rate

Official document: NJ20260015 on SAM.gov.

NJ20260017 rev 1 · Residential · Ocean

Classification as publishedBase rateFringesRate schedule
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$15.602.46SUNJ2004-055
DOL wage survey rate

Official document: NJ20260017 on SAM.gov.

NJ20260018 rev 1 · Residential · Passaic

Classification as publishedBase rateFringesRate schedule
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$15.916.36SUNJ2004-056
DOL wage survey rate

Official document: NJ20260018 on SAM.gov.

NJ20260020 rev 1 · Residential · Somerset

Classification as publishedBase rateFringesRate schedule
CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK$37.1922.18CARP0006-003
collectively bargained (union) rate

Official document: NJ20260020 on SAM.gov.

NJ20260021 rev 1 · Residential · Sussex

Classification as publishedBase rateFringesRate schedule
CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK$37.1922.18CARP0006-003
collectively bargained (union) rate

Official document: NJ20260021 on SAM.gov.

NJ20260022 rev 1 · Residential · Union

Classification as publishedBase rateFringesRate schedule
CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK$37.1922.18CARP0006-003
collectively bargained (union) rate

Official document: NJ20260022 on SAM.gov.

NJ20260023 rev 1 · Residential · Warren

Classification as publishedBase rateFringesRate schedule
CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK$37.1922.18CARP0006-003
collectively bargained (union) rate

Official document: NJ20260023 on SAM.gov.

NJ20260024 rev 2 · Residential · Hunterdon, Middlesex

Classification as publishedBase rateFringesRate schedule
CARPENTER, INCLUDES DRYWALL HANGING$48.2711.38CARP0006-001
collectively bargained (union) rate

Official document: NJ20260024 on SAM.gov.

NJ20260025 rev 1 · Building · Atlantic

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER, INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260025 on SAM.gov.

NJ20260026 rev 1 · Building · Bergen

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260026 on SAM.gov.

NJ20260027 rev 2 · Building · Burlington

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER, INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260027 on SAM.gov.

NJ20260028 rev 1 · Building · Camden

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260028 on SAM.gov.

NJ20260029 rev 1 · Building · Cape May

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260029 on SAM.gov.

NJ20260030 rev 1 · Building · Cumberland

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260030 on SAM.gov.

NJ20260031 rev 1 · Building · Essex

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260031 on SAM.gov.

NJ20260032 rev 1 · Building · Gloucester

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260032 on SAM.gov.

NJ20260033 rev 1 · Building · Hudson

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260033 on SAM.gov.

NJ20260034 rev 2 · Building · Hunterdon

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK)$57.4234.17CARP0006-011
collectively bargained (union) rate

Official document: NJ20260034 on SAM.gov.

NJ20260035 rev 2 · Building · Mercer

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FORMWORK)$57.4234.17CARP0006-011
collectively bargained (union) rate

Official document: NJ20260035 on SAM.gov.

NJ20260036 rev 1 · Building · Middlesex

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FORMWORK)$57.4234.17CARP0006-011
collectively bargained (union) rate

Official document: NJ20260036 on SAM.gov.

NJ20260037 rev 1 · Building · Monmouth

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FORMWORK)$57.4234.17CARP0006-011
collectively bargained (union) rate

Official document: NJ20260037 on SAM.gov.

NJ20260038 rev 1 · Building · Morris

Classification as publishedBase rateFringesRate schedule
CARPENTER (SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION)$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260038 on SAM.gov.

NJ20260039 rev 1 · Building · Ocean

Classification as publishedBase rateFringesRate schedule
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FORMWORK)$57.4234.17CARP0006-011
collectively bargained (union) rate

Official document: NJ20260039 on SAM.gov.

NJ20260040 rev 2 · Building · Passaic

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260040 on SAM.gov.

NJ20260041 rev 2 · Building · Salem

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260041 on SAM.gov.

NJ20260042 rev 2 · Building · Somerset

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.4234.17CARP0006-011
collectively bargained (union) rate

Official document: NJ20260042 on SAM.gov.

NJ20260043 rev 2 · Building · Sussex

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260043 on SAM.gov.

NJ20260044 rev 2 · Building · Union

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.4234.17CARP0006-010
collectively bargained (union) rate
CARPENTER: INSTALLER, METAL STUD (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-012
collectively bargained (union) rate

Official document: NJ20260044 on SAM.gov.

NJ20260045 rev 2 · Building · Warren

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION$57.4234.17CARP0006-010
collectively bargained (union) rate

Official document: NJ20260045 on SAM.gov.

NJ20260047 rev 2 · Heavy · Bergen

Classification as publishedBase rateFringesRate schedule
CARPENTER: DOCK BUILDER (CONCRETE FORM WORK) WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND C$52.0239.23CARP1556-003
collectively bargained (union) rate
CARPENTER: DOCK BUILDER (ALL OTHER WORK) WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREOS$52.9852.44CARP1556-003
collectively bargained (union) rate

Official document: NJ20260047 on SAM.gov.

NJ20260048 rev 3 · Heavy · Burlington

Classification as publishedBase rateFringesRate schedule
CARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-013
collectively bargained (union) rate

Official document: NJ20260048 on SAM.gov.

NJ20260049 rev 2 · Heavy · Camden

Classification as publishedBase rateFringesRate schedule
CARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-013
collectively bargained (union) rate

Official document: NJ20260049 on SAM.gov.

NJ20260050 rev 2 · Heavy · Cape May

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-013
collectively bargained (union) rate

Official document: NJ20260050 on SAM.gov.

NJ20260051 rev 2 · Heavy · Cumberland

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-013
collectively bargained (union) rate

Official document: NJ20260051 on SAM.gov.

NJ20260052 rev 2 · Heavy · Essex

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-013
collectively bargained (union) rate

Official document: NJ20260052 on SAM.gov.

NJ20260053 rev 2 · Heavy · Gloucester

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-013
collectively bargained (union) rate

Official document: NJ20260053 on SAM.gov.

NJ20260054 rev 2 · Heavy · Hudson

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-013
collectively bargained (union) rate
CARPENTER: DOCK BUILDER (CONCRETE FORM WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND $52.0239.23CARP1556-003
collectively bargained (union) rate
CARPENTER: DOCK BUILDER (ALL OTHER WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREO$52.9852.44CARP1556-003
collectively bargained (union) rate

Official document: NJ20260054 on SAM.gov.

NJ20260055 rev 3 · Heavy · Hunterdon

Classification as publishedBase rateFringesRate schedule
CARPENTER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-014
collectively bargained (union) rate
CARPENTER: DOCK BUILDER (CONCRETE FORM WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND $52.0239.23CARP1556-003
collectively bargained (union) rate
CARPENTER: DOCK BUILDER (ALL OTHER WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREO$52.9852.44CARP1556-003
collectively bargained (union) rate

Official document: NJ20260055 on SAM.gov.

NJ20260056 rev 3 · Heavy · Mercer

Classification as publishedBase rateFringesRate schedule
CARPENTER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-014
collectively bargained (union) rate
CARPENTER: DOCK BUILDER (CONCRETE FORM WORK) WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND C$52.0239.23CARP1556-004
collectively bargained (union) rate
CARPENTER: DOCK BUILDER (ALL OTHER WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREO$52.9852.44CARP1556-004
collectively bargained (union) rate

Official document: NJ20260056 on SAM.gov.

NJ20260057 rev 2 · Heavy · Middlesex

Classification as publishedBase rateFringesRate schedule
CARPENTER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-014
collectively bargained (union) rate
CARPENTER: DOCK BUILDER (CONCRETE FORM WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND $52.0239.23CARP1556-003
collectively bargained (union) rate
CARPENTER: DOCK BUILDER (ALL OTHER WORK) (WORK ON LAND PILE DRIVING, FLOATING MARINE CONSTRUCTION AND THE CONSTRUCTION OF WHARVES, WHILE HANDLING AND WORKING WITH CREOSOTE AND CREO$52.9852.44CARP1556-003
collectively bargained (union) rate

Official document: NJ20260057 on SAM.gov.

NJ20260058 rev 2 · Heavy · Monmouth

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-013
collectively bargained (union) rate

Official document: NJ20260058 on SAM.gov.

NJ20260059 rev 2 · Heavy · Morris

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING FORM WORK (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.)$57.4234.17CARP0006-013
collectively bargained (union) rate

Official document: NJ20260059 on SAM.gov.

NJ20260060 rev 1 · Heavy · Ocean

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING FORM WORK. THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.4234.17CARP0006-013
collectively bargained (union) rate

Official document: NJ20260060 on SAM.gov.

NJ20260061 rev 1 · Heavy · Passaic

Classification as publishedBase rateFringesRate schedule
CARPENTER: INCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.4234.17CARP0006-013
collectively bargained (union) rate
CARPENTER DOCK BUILDER (Concrete form Work on land pile driving, floating marine construction and the construction of wharves, while handling and working with creosote and creosote$52.0239.23CARP1556-003
collectively bargained (union) rate
CARPENTER DOCK BUILDER (All other Work on land pile driving, floating marine construction and the construction of wharves, while handling and working with creosote and creosote-imp$52.9852.44CARP1556-003
collectively bargained (union) rate

Official document: NJ20260061 on SAM.gov.

NJ20260062 rev 1 · Heavy · Salem

Classification as publishedBase rateFringesRate schedule
CARPENTER: (SCAFFOLD BUILDER) IN THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.4234.17CARP0006-009
collectively bargained (union) rate
CARPENTER: INCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.4234.17CARP0006-013
collectively bargained (union) rate

Official document: NJ20260062 on SAM.gov.

NJ20260063 rev 1 · Heavy · Somerset

Classification as publishedBase rateFringesRate schedule
CARPENTER THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.4234.17CARP0006-014
collectively bargained (union) rate
CARPENTER DOCK BUILDER (Concrete form Work on land pile driving, floating marine construction and the construction of wharves, while handling and working with creosote and creosote$52.0239.23CARP1556-003
collectively bargained (union) rate
CARPENTER DOCK BUILDER (All other Work on land pile driving, floating marine construction and the construction of wharves, while handling and working with creosote and creosote-imp$52.9852.44CARP1556-003
collectively bargained (union) rate

Official document: NJ20260063 on SAM.gov.

NJ20260064 rev 2 · Heavy · Sussex

Classification as publishedBase rateFringesRate schedule
CARPENTER: SCAFFOLD BUILDER. THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.4234.02CARP0006-009
collectively bargained (union) rate
CARPENTER: INCLUDING FORM WORK. THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.4234.02CARP0006-013
collectively bargained (union) rate

Official document: NJ20260064 on SAM.gov.

NJ20260065 rev 2 · Heavy · Union

Classification as publishedBase rateFringesRate schedule
CARPENTER: SCAFFOLD BUILDER. THE FIRST SIXTY FEET AT THE REGAULR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.4234.02CARP0006-009
collectively bargained (union) rate
CARPENTER: INCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.4234.02CARP0006-013
collectively bargained (union) rate

Official document: NJ20260065 on SAM.gov.

NJ20260066 rev 2 · Heavy · Warren

Classification as publishedBase rateFringesRate schedule
CARPENTER: SCAFFOLD BUILDER. The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter$57.4234.02CARP0006-009
collectively bargained (union) rate
CARPENTER: INCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER$57.4234.02CARP0006-013
collectively bargained (union) rate

Official document: NJ20260066 on SAM.gov.

Where to go next

Carpenter rates in every state · New Jersey prevailing wage and state law · New Jersey determinations by county · pay calculator

Other trades in New Jersey