Heavy Equipment Operator prevailing wage rates in New Jersey
Federal Davis-Bacon rates published in 64 active determinations, 2026
- Active federal Davis-Bacon determinations for New Jersey publish 341 heavy equipment operator classification rates, across 64 determinations covering 21 counties.
- Those published base rates run from $13.50 to $70.24 an hour before fringe benefits. Which one applies to a job depends on its county, its construction type and the determination written into the contract.
- Construction types covered: Building, Heavy, Highway, Residential.
- Last determination revision affecting heavy equipment operator rates in New Jersey: .
This page collects every classification in New Jersey's active federal determinations that is a form of heavy equipment operator work (cranes, excavators, dozers, loaders and other power equipment) and shows the rate published for it. Determinations name a classification the way the underlying union agreement or wage survey named it, so the wording varies between them; the rate and the fringe are reproduced exactly as published.
Published rates by determination
NJ20260001 rev 2 · Highway · Atlantic, Burlington, Camden, Cape May, Cumberland, Gloucester and 4 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTER PILOT; HELICOPTER ENGINEER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKE | $63.54 | 37.50 | ENGI0825-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER; TIRE REPAIR AND MAINTENANCE HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER I | $52.88 | 37.50 | ENGI0825-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOM AND SWEEPER; CHIPPER; COMPRESSOR (SINGLE); CONCRETE SPREADER (SMALL TYPE); CONVEYOR LOADER (DOES NOT INCLUDE ELEVATING GRADER); ENGINE, LAR | $56.59 | 37.50 | ENGI0825-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT CURBING MACHINE; ASPHALT PLANT ENGINEER; ASPHALT SPREADER; AUTOGRADE TUBE FINISHING AND TEXTURING MACHINE (CMI AND SIMILAR TYPES); AUTOGR | $58.22 | 37.50 | ENGI0825-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ""A"" FRAME/BACKHOE COMBINATION; BOOM ATTACHMENT ON LOADER (RATE BASED ON SIZE OF BUCKET, NOT APPLICABLE TO PIPEHOOK); BORING AND DRILLING MACHIN | $60.13 | 37.50 | ENGI0825-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 AUTOGRADE - COMBINATION SUBGRADER; BASE METAL SPREADER AND BASE TRIMMER (CMI AND SIMILAR TYPES); AUTOGRADE PLACER - TRIMMER SPREADER COMBINATION | $61.72 | 37.50 | ENGI0825-002 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 7) OILER; DECKHAND HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER I | $65.74 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 6) COMPRESSOR, SINGLE; OFF-ROAD BACK DUMP; WELDING MACHINE (SINGLE, GAS, DIESEL AND ELECTRIC CONVERTERS OF ANY TYPE); WELDING SYS | $53.34 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 5) AERIAL PLATFORM USED AS A HOIST; COMPRESSOR, TWO OR THREE IN BATTERY; DIRECTIONAL BORING MACHINE; ELEVATOR OR HOUSE CAR; CONCR | $57.10 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 4) ""A"" FRAME; CHERRY PICKER (10 TON AND UNDER); HOIST (ALL TYPES OF HOIST, INCLUDING STEAM, GAS, DIESEL, ELECTRIC, AIR, HYDRAUL | $58.63 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 3) HELICOPTER PILOT HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER | $61.29 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 2) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM INCLUDING JIB, LESS THAN 140 FT. ABOVE GROUND); DERRICKS (ALL DERRICKS, LAND, F | $68.58 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 1) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM INCLUDING JIB, 140 FT. AND OVER, ABOVE GROUND); DERRICKS (ALL DERRICKS, LAND, F | $70.24 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
Official document: NJ20260001 on SAM.gov.
NJ20260002 rev 2 · Highway · Bergen, Essex, Hudson, Hunterdon, Middlesex, Morris and 5 more
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 1) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM INCLUDING JIB, 140 FT. AND OVER, ABOVE GROUND); DERRICKS (ALL DERRICKS, LAND, FL | $70.24 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 2) CRANES (ALL CRANES, LAND OR FLOATING WITH BOOM INCLUDING JIB, LESS THAN 140 FT. ABOVE GROUND); DERRICKS (ALL DERRICKS, LAND, FL | $68.58 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 3) HELICOPTER PILOT HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER I | $61.29 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 4) ""A"" FRAME; CHERRY PICKER (10 TON AND UNDER); HOIST (ALL TYPES OF HOIST, INCLUDING STEAM, GAS, DIESEL, ELECTRIC, AIR, HYDRAULI | $58.63 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 5) AERIAL PLATFORM USED AS A HOIST; COMPRESSOR, TWO OR THREE IN BATTERY; DIRECTIONAL BORING MACHINE; ELEVATOR OR HOUSE CAR; CONCRE | $57.10 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 6) COMPRESSOR, SINGLE; OFF-ROAD BACK DUMP; WELDING MACHINE (SINGLE, GAS, DIESEL AND ELECTRIC CONVERTERS OF ANY TYPE); WELDING SYST | $53.34 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: STEEL ERECTION: (GROUP 7) OILER; DECKHAND HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS | $65.74 | 37.50 | ENGI0825-004 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 AUTOGRADE - COMBINATION SUBGRADER; BASE METAL SPREADER AND BASE TRIMMER (CMI AND SIMILAR TYPES); AUTOGRADE PLACER - TRIMMER SPREADER COMBINATION | $61.72 | 37.50 | ENGI0825-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 ""A"" FRAME/BACKHOE COMBINATION; BOOM ATTACHMENT ON LOADER (RATE BASED ON SIZE OF BUCKET, NOT APPLICABLE TO PIPEHOOK); BORING AND DRILLING MACHIN | $60.13 | 37.50 | ENGI0825-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT CURBING MACHINE; ASPHALT PLANT ENGINEER; ASPHALT SPREADER; AUTOGRADE TUBE FINISHING AND TEXTURING MACHINE (CMI AND SIMILAR TYPES); AUTOGR | $58.22 | 37.50 | ENGI0825-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOM AND SWEEPER; CHIPPER; COMPRESSOR (SINGLE); CONCRETE SPREADER (SMALL TYPE); CONVEYOR LOADER (DOES NOT INCLUDE ELEVATING GRADER); ENGINE, LAR | $56.59 | 37.50 | ENGI0825-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER; TIRE REPAIR AND MAINTENANCE HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER I | $52.88 | 37.50 | ENGI0825-009 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTER PILOT; HELICOPTER ENGINEER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKE | $63.54 | 37.50 | ENGI0825-009 collectively bargained (union) rate |
Official document: NJ20260002 on SAM.gov.
NJ20260005 rev 1 · Residential · Atlantic
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKOHE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE< 10 CU PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Ind | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TURCK MOUNTED | $13.50 | 2.34 | SUNJ2004-043 DOL wage survey rate |
Official document: NJ20260005 on SAM.gov.
NJ20260006 rev 1 · Residential · Bergen
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-044 DOL wage survey rate |
Official document: NJ20260006 on SAM.gov.
NJ20260007 rev 2 · Residential · Burlington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-045 DOL wage survey rate |
Official document: NJ20260007 on SAM.gov.
NJ20260008 rev 1 · Residential · Camden
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-046 DOL wage survey rate |
Official document: NJ20260008 on SAM.gov.
NJ20260009 rev 1 · Residential · Cape May
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Da | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-047 DOL wage survey rate |
Official document: NJ20260009 on SAM.gov.
NJ20260010 rev 1 · Residential · Cumberland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-048 DOL wage survey rate |
Official document: NJ20260010 on SAM.gov.
NJ20260011 rev 1 · Residential · Essex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-049 DOL wage survey rate |
Official document: NJ20260011 on SAM.gov.
NJ20260012 rev 1 · Residential · Gloucester
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-050 DOL wage survey rate |
Official document: NJ20260012 on SAM.gov.
NJ20260013 rev 1 · Residential · Hudson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-051 DOL wage survey rate |
Official document: NJ20260013 on SAM.gov.
NJ20260014 rev 1 · Residential · Mercer
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-052 DOL wage survey rate |
Official document: NJ20260014 on SAM.gov.
NJ20260015 rev 1 · Residential · Monmouth
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-053 DOL wage survey rate |
Official document: NJ20260015 on SAM.gov.
NJ20260016 rev 1 · Residential · Morris
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-054 DOL wage survey rate |
Official document: NJ20260016 on SAM.gov.
NJ20260017 rev 1 · Residential · Ocean
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-055 DOL wage survey rate |
Official document: NJ20260017 on SAM.gov.
NJ20260018 rev 1 · Residential · Passaic
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-056 DOL wage survey rate |
Official document: NJ20260018 on SAM.gov.
NJ20260019 rev 1 · Residential · Salem
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-057 DOL wage survey rate |
Official document: NJ20260019 on SAM.gov.
NJ20260020 rev 1 · Residential · Somerset
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-058 DOL wage survey rate |
Official document: NJ20260020 on SAM.gov.
NJ20260021 rev 1 · Residential · Sussex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-059 DOL wage survey rate |
Official document: NJ20260021 on SAM.gov.
NJ20260022 rev 1 · Residential · Union
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-060 DOL wage survey rate |
Official document: NJ20260022 on SAM.gov.
NJ20260023 rev 1 · Residential · Warren
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-061 DOL wage survey rate |
Official document: NJ20260023 on SAM.gov.
NJ20260024 rev 2 · Residential · Hunterdon, Middlesex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: (2) BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Mem | $60.13 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (1) BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER . PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial D | $61.72 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (4) ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independen | $56.59 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: (3) BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Memorial Day, Independence D | $58.22 | 37.50 | ENGI0825-006 collectively bargained (union) rate |
| OPERATOR: CONCRETE PUMP, TRUCK MOUNTED | $13.50 | 2.34 | SUNJ2004-062 DOL wage survey rate |
Official document: NJ20260024 on SAM.gov.
NJ20260025 rev 1 · Building · Atlantic
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 2) ALL CRANES WITH BOOM INCLUDING JIB, LESS THAN 140 FT. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HA | $68.58 | 37.50 | ENGI0825-018 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS:, STEEL ERECTION: (GROUP 1) ALL CRANES WITH BOOM INCLUDING JIB, 140 FT. AND OVER. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HA | $70.24 | 37.50 | ENGI0825-018 collectively bargained (union) rate |
Official document: NJ20260025 on SAM.gov.
NJ20260026 rev 1 · Building · Bergen
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260026 on SAM.gov.
NJ20260027 rev 2 · Building · Burlington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260027 on SAM.gov.
NJ20260028 rev 1 · Building · Camden
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260028 on SAM.gov.
NJ20260029 rev 1 · Building · Cape May
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
Official document: NJ20260029 on SAM.gov.
NJ20260030 rev 1 · Building · Cumberland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-017 collectively bargained (union) rate |
Official document: NJ20260030 on SAM.gov.
NJ20260031 rev 1 · Building · Essex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260031 on SAM.gov.
NJ20260032 rev 1 · Building · Gloucester
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260032 on SAM.gov.
NJ20260033 rev 1 · Building · Hudson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260033 on SAM.gov.
NJ20260034 rev 2 · Building · Hunterdon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260034 on SAM.gov.
NJ20260035 rev 2 · Building · Mercer
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260035 on SAM.gov.
NJ20260036 rev 1 · Building · Middlesex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260036 on SAM.gov.
NJ20260037 rev 1 · Building · Monmouth
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260037 on SAM.gov.
NJ20260038 rev 1 · Building · Morris
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260038 on SAM.gov.
NJ20260039 rev 1 · Building · Ocean
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260039 on SAM.gov.
NJ20260040 rev 2 · Building · Passaic
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. Y | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260040 on SAM.gov.
NJ20260041 rev 2 · Building · Salem
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. Y | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260041 on SAM.gov.
NJ20260042 rev 2 · Building · Somerset
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. Y | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260042 on SAM.gov.
NJ20260043 rev 2 · Building · Sussex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. Y | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260043 on SAM.gov.
NJ20260044 rev 2 · Building · Union
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. Y | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260044 on SAM.gov.
NJ20260045 rev 2 · Building · Warren
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS | $56.59 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. Y | $58.22 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-020 collectively bargained (union) rate |
Official document: NJ20260045 on SAM.gov.
NJ20260046 rev 2 · Heavy · Atlantic
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; | $60.13 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| OPERATOR: BACKHOE LOADER COMBO | $31.28 | 20.79 | SUNJ2004-022 DOL wage survey rate |
Official document: NJ20260046 on SAM.gov.
NJ20260047 rev 2 · Heavy · Bergen
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260047 on SAM.gov.
NJ20260048 rev 3 · Heavy · Burlington
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260048 on SAM.gov.
NJ20260049 rev 2 · Heavy · Camden
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260049 on SAM.gov.
NJ20260050 rev 2 · Heavy · Cape May
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; | $60.13 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| OPERATOR: BACKHOE LOADER COMBO | $31.28 | 20.79 | SUNJ2004-026 DOL wage survey rate |
Official document: NJ20260050 on SAM.gov.
NJ20260051 rev 2 · Heavy · Cumberland
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; | $60.13 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-019 collectively bargained (union) rate |
| OPERATOR: BACKHOE LOADER COMBO | $31.28 | 20.79 | SUNJ2004-027 DOL wage survey rate |
Official document: NJ20260051 on SAM.gov.
NJ20260052 rev 2 · Heavy · Essex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260052 on SAM.gov.
NJ20260053 rev 2 · Heavy · Gloucester
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260053 on SAM.gov.
NJ20260054 rev 2 · Heavy · Hudson
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260054 on SAM.gov.
NJ20260055 rev 3 · Heavy · Hunterdon
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260055 on SAM.gov.
NJ20260056 rev 3 · Heavy · Mercer
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260056 on SAM.gov.
NJ20260057 rev 2 · Heavy · Middlesex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260057 on SAM.gov.
NJ20260058 rev 2 · Heavy · Monmouth
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260058 on SAM.gov.
NJ20260059 rev 2 · Heavy · Morris
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS TH | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-TH | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260059 on SAM.gov.
NJ20260060 rev 1 · Heavy · Ocean
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS T | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260060 on SAM.gov.
NJ20260061 rev 1 · Heavy · Passaic
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS T | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260061 on SAM.gov.
NJ20260062 rev 1 · Heavy · Salem
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS T | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260062 on SAM.gov.
NJ20260063 rev 1 · Heavy · Somerset
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZA | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE O | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS T | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260063 on SAM.gov.
NJ20260064 rev 2 · Heavy · Sussex
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZ | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS T | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260064 on SAM.gov.
NJ20260065 rev 2 · Heavy · Union
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZ | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS T | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260065 on SAM.gov.
NJ20260066 rev 2 · Heavy · Warren
| Classification as published | Base rate | Fringes | Rate schedule |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZ | $52.88 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE | $56.59 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS T | $58.22 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THA | $60.13 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
| POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-T | $61.72 | 37.50 | ENGI0825-021 collectively bargained (union) rate |
Official document: NJ20260066 on SAM.gov.
Where to go next
Heavy Equipment Operator rates in every state · New Jersey prevailing wage and state law · New Jersey determinations by county · pay calculator
Other trades in New Jersey
Electrician · Plumber · Pipefitter · Sheet Metal Worker · Carpenter · Construction Laborer · Truck Driver · Ironworker · Cement Mason / Concrete Finisher · Bricklayer / Mason · Roofer · Painter · Drywall Finisher / Taper · Plasterer · Glazier · Insulator (Heat & Frost) · Millwright · Elevator Constructor · Sprinkler Fitter · Piledriver · Tile Setter · Tile Finisher · Floor Layer · Line Constructor / Lineman